PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 8:11pm On Aug 13, 2022
God bless you man
Dennis3D:
Good morning Sir.
In my own way of doing things.
Ensure that you have your windows ready before Plastering so that the bricklayers don't have to come back and charge you differently to do your window Plastering and dressing.

After Roofing.
- First floor plumbing and Electrical piping is what I do.
- Followed by Windows
- Plastering can then take place.
- Wiring
- POP ceiling and wall screeding (In and Out)
- Door installation at least the frames for a start.
- Tiling
- Plumbing fittings
- Etc
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 8:22am On Aug 13, 2022
Anxiously waiting for the next stage.

Good morning Dennis.. After internal first stage conduit work. What's next? Windows or plastering. I can only take on a stage at a time with months interval.. I would appreciate ur recommendations
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by BiigTee: 10:21pm On Aug 06, 2022
As regards ur original stone coated.. Pls contact Money121.. Buying from warehouse doesn't mean u won't be cheated.. There are grades to this stone coated thing and I was very pleased with what was delivered by Imran compared to what I saw someone else show me.

Ur choice tho..

Olusharp:
for your parapet... Please how bedrooms is your building?
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by BiigTee: 11:08am On Aug 03, 2022
Now U are making me to reconsider glass balustrade
michlins:
As usual, I delivered premium service
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 4:56am On Jul 13, 2022
The person doing mine is a TRUSTED member from this forum.. I am putting everything in God's hands.. I no fit fight!.. But i believe he would deliver! Fire on Dennis.. U are making me consider going back to sch to study construction Abi civil engineering

Dennis3D:
Well, it depends on the details that is being done for you sir. Like in this particular build. There are a few things we didn't do with the client request.

Like no TVs or dstv in the bedrooms. He wants bedroom to be a place for sleeping. But there are other feature like AC, Water heater for bathroom, mirrow lights in the bathroom, cctv, and the likes.

And This is a total of 5 bedrooms total structure.
Though fencing piping is not done yet and haven't been purchased either.
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 7:08pm On Jul 12, 2022
Mehn.. I am spending almost x3 of that on my build
Dennis3D:
Ok sir.
So Far on the first floor works alone.
Electrical piping is about 228K.
Electrical on the ground floor was about 165K

Plumbing piping is about 125K on the internal piping. The other Piping running from foundation is about 120K so far.

Note - Inflation has taken place since then o. Pls take note of that in your consideration and some of my electrical materials used here came from Alaba too.
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 9:44am On Jul 12, 2022
This bathroom is massive! Woow!

Mine is not nearly as big so I intend to carve out a lil space out of the room for the bath tub.. To be enclosed in a see through glass
Dennis3D:
Let me show the plumbing works.
Let's start with the Master's Bathroom.
Almost like a room size bedroom.
To start with.
It has 3 windows.
We have bathtub here.
We have standing shower and jacuzzi options here.
We have wash hand sink with mirrors and shelves.
We have just about big space for luxury lifestyle in the bathroom.
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 9:38am On Jul 12, 2022
Good morning Dennis.. Great work you are doing as usual.. Can u give an approximate value of the cost of the piping works going on here (that's for electrical and plumbing) want to compare it with what I spent on mine..

Dennis3D:
Block works on the tense are starting today.
Meanwhile, we have more work updates for you on the piping works ongoing.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by BiigTee:
.
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 4:47am On Jun 23, 2022
Lovely! Post more pictures.. Really love the windows but I think I prefer Grey alluminium profile.. The white I see most times end up changing colour to cream..

Is this a normal thing or what do u think chief?
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by BiigTee: 8:03pm On Jun 16, 2022
Twinskenny.. Let's be honest.. Solar spoils the beauty of roofs... It defaces it soo much.. Is there a way around this? I really would hate my beautiful roof to be covered with solar panels
twinskenny:
Kudos to this man.. no nepa no problem..

#ibadan
PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by BiigTee: 6:48pm On Jun 14, 2022
Welldone.. Diligently following
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 5:44am On Jun 04, 2022
Good morning Dennis.. Updates?
Dennis3D:
Good morning Viewers
PropertiesRe: Construction Of A New Security House And Generator House In Anambra State by BiigTee: 6:34pm On Jun 01, 2022
Spyder880 welldone on this project.. Pls what's the size of this gateman house? Does it have a kitchen?

spyder880:
We have completed the lintels, even added blocks on the lintels. Our focus now is to complete the parapet for the security post.
PropertiesRe: Owerri Project - 4 Duplex And 4 Units Of 2 Bedroom Flats by BiigTee: 6:31pm On Jun 01, 2022
Welldone Dennis.. Following keenly!
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by BiigTee: 2:38pm On Jun 01, 2022
Is it only sliding windows that are prone to theft? What of casement windows? Make i know before I do my own!
Adedward:
smile, the 1132 is net materials and it's outside nets so if u are not doing sliding nets before, u can do it to outside sir,
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 12:54pm On Jun 01, 2022
I got a quote of roughly 1.5m for materials for the first stage piping and 200k Workmanship.. I am currently having just 1.1m do u advice I buy the materials I can afford down and keep while waiting for more money?

Dennis3D:
Electrical piping and plumbing are usually contract bases that I do it.

They charge you based on the design.

With respect to the first floor piping.

It is presumed that before decking, the ground floor piping is done. And when you are done with roofing, the next is first floor piping because they will need to run pipes on the ceiling nuggings before Plastering. That is what I meant there.
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 12:52pm On Jun 01, 2022
Thank you sir
Dennis3D:
Electrical piping and plumbing are usually contract bases that I do it.

They charge you based on the design.

With respect to the first floor piping.

It is presumed that before decking, the ground floor piping is done. And when you are done with roofing, the next is first floor piping because they will need to run pipes on the ceiling nuggings before Plastering. That is what I meant there.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by BiigTee: 3:01pm On May 31, 2022
What part of Isheri Oshun? What's the asking price?
NkiMac:
Please help a sister to sell/buy
Half plot of land at Isheri Oshun, Ijegun Road. Alimosho LGA, Lagos.
It's genuine and the one want to sell it off so he can use the money for something else.
Very affordable,
You can DM me or call/whatsapp on 08064395042
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 6:31pm On May 30, 2022
You said something about doing the conduit piping of the first floor.. Does it mean the ground floor doesn't need conduit piping? What's a fair labour charge for electrical and plumping First stage pipe laying?
Dennis3D:
You are welcome sir.
Always feel free to ask questions.
I will be willing to respond them.

Thanks
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 11:54am On May 30, 2022
Thank you and welldone
Dennis3D:
Depending on the location and environment as well as the site premises.

Hence, once you do wiring. It's paramount that either you have a guard on ground or you should facilitate the installation of your doors ASAP. Because wires can be taken out in any unsecured environment and you know wires are quite expensive. It's easy to remove by just pulling it through the pipe.

But if you have a secured environment where there are checks and regular human movements around the property. The chance of this things happening are low.
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 9:58pm On May 28, 2022
Ok sir.. At what point does securing the site become most paramount...
Dennis3D:
OH that's good
Thank God for the progress do far.

In my approach. I proceed with the first floor piping, then windows. After that AC Mechanical piping as well as other piping works, then Plastering should commence so the bricklayers can dress the windows.

When Plastering is done, wiring can commence.
Then POP Works and Screeding. Followed by door (frame) installation and then tiling.
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 7:11pm On May 28, 2022
Hi Mr Denis, I am pleased to inform u that we would be completing the roof covering by tomorrow or monday. One question has been so heavy on my mind..

After roofing, what's next? Windows? Or conduit MEP piping Or plastering. Which do u think should be prioritized to tackle against inflation and in terms of best construction practice?
Dennis3D:
You are welcome sir.
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 2:08pm On May 27, 2022
Wow.. OK
Dennis3D:
Good morning Sir About 505Sqm
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 10:31am On May 27, 2022
Good morning Denis. How's the work coming along!?
Pls keep these updates coming steady we love to see what u are upto.


Pls I have a question.. How many sqm was the roof of this beauty?
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 8:02pm On May 20, 2022
Good evening and welldone sir
Dennis3D:
Good morning
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 6:13pm On May 19, 2022
God bless you
Dennis3D:
After the purchase of the roofing woods. Make sure they are treated with Soligum and Kerosene or oil to avoid termite in the future.

Also, ensure appropriate height is chosen for your roof before they start.
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 9:41pm On May 18, 2022
Thanks chief.. Mr Taoreed was unavailable for the roofing job but I was able to get someone else.. For roofing and nogging we negotiated 200k Workmanship.. As a first time home owner what do u think I should be on the look out for as we make preparations to commence roofing?
Dennis3D:
It has no role to play in the cost of the aluminum works when you have scaled through the negotiation process with your aluminum vendor.

Its even much preferable for them to fabricate on site because it reduces mistakes in measurements which can lead to increase in cost from the vendor if mistakes are made as a result of off site fabrication.
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 7:51pm On May 18, 2022
I appreciate your intuitive responses

Trully u know ur onions..

Is on site fabrication more expensive? Or cheaper?


Dennis3D:
Good evening sir. Fabrication on site is always better as it gives them the opportunity to always cross check their measurements and ensure no mistake is made and equally reduces the risks of broken glass during transportation in some cases.

It equally gives them opportunity to make and adopt new measurements when changes are made on site during fabrication. I have seen that happen. In fact in this project, we even changed the position and size of a window and removed one too.

So in my opinion, it's preferred to start up window fabrication on site.
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 6:37pm On May 17, 2022
Is fabrication on site better than paying for them to make it and deliver them install for u? What's the advantages?
Dennis3D:
As Promised - Attached are the Window frames to commence fabrication ASAP.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by BiigTee: 2:28am On May 13, 2022
Thank you
QSFemi:
Apologies. Being busy.

I'll see to it tomorrow by God's grace.
PropertiesRe: Isheri Construction - 4 Bedroom Luxury Duplex with 2 Bed BQ by BiigTee: 8:50pm On May 12, 2022
Thank you sir.
Dennis3D:
Normally before or immediately after roofing.
The Conduit piping of the ground and upper floor (Duplex) ought to have been done before windows.

However, either of the two stages of work doesn't interfere with each other so they can be done at separate times.

Like this particular project now. We are just about to commence the upper floor piping while the window work is ongoing too.