Pictures from The Chateau POP...
|
Pictures from The Chateau POP Ceiling and Wall Screeding Materials
|
Pictures from The Chateau THE GRAVE SITE
|
Pictures from The Chateau
|
Open Heavens 25th Sept "For those who are over selective concerning matters that God has spoke about, please heed this warning. There are small jobs whose assignment in your life is not to give you your desired haven of rest and comfort, but to link you with that choice job or assignment! Do you know that you will be accessed on how you handle smaller jobs or tasks to determine whether you qualify for the big? If you fail in the little, you may be truncated from the big ones." |
Fhemmmy: Never seen pix sharper than this on NL . . .You are the Champ!Thank you. You inspired us to do more. |
oladele007: a good plastering and bricklayer needed in ogijo near ikorodu.We can handle your job for you sir but we can only be available in two weeks time. Hope that is not too long time to wait! |
babatosan: What advantage does full conduit have over half conduitI'll revert shortly. |
Picture Updates 3. More Parapet Pics
|
Picture Updates 2. Electrical Works
|
Picture Updates 1. Parapet Formwork Fully Removed. You remember the little kid in the picture. He was among the team that built the Chateau in Ile-Oluji
|
Project Update I hit the site very late yesternight because I was busy picking up materials to complete the roofing work. The main building is fully covered and we're already covering the grave site. Picture updates later today as soon as I tidy up all the loose ends. Meanwhile, POP ceiling works are ongoing. Good Morning! |
From the construction site...
|
POP and Tiles coming in... Picture updates to follow later today |
Parapet and Decking planks removal ongoing. The electrician is busy tubing the pipes. The plumber moves in today. |
and more electrical works (full conduit installation)
|
More progress pictures...
|
Pre-Finish Works Underway Finally the project has begun with preliminary and enabling works been done prior to the rendering of the house. At the moment, the removal of the decking planks, erecting the scaffolds, electrical pipe works, plumbing works and other works are ongoing.
|
I have not blogged about this project before, however it is one that we have been working on for over a month now. When we were first approached, the project was well underway with another contractor so I can not take credit for all of the works done so far. However we have been working with the client to make tweaks and alterations to achieve a luxury finish without breaking the banks. With the client, we are now turning our attention to the detailed interior design work. Follow us as we finish the semi-detached duplex in Isheri, Lagos.
|
Brabus, Where Have You Been? 1. Proposed Development of a Petrol Station at a very developed area off the Lagos/Badagry Expressway. 2. The Tiles Market in Orile, Lagos 3. Ongoing Development at Isheri, Lagos. (New Thread)
|
And there comes a roof...
|
More Edging Pictures - Paying attention to the details Check, Check, Check..
|
Edging and Detailing Works
|
Project Update Tiling of the roof have commenced as is the external rendering. By the end of today, all internal rendering should also be complete and we will begin adding the exterior architectural detailing to the Chateau. At the moment, I'm picking up materials for the installation the POP ceiling and the bathroom tiling. Happy Weekend! |
Roofing Woodwork ongoing |
Breakfast Update The roofing tiles are here. Roof tiles installation starts soon. |
I love the 2nd fence. |
Fhemmmy: Chairman, i cant remember if i have seen the figures on this homeOf course not, I'll update the blog in due time. |
[size=15pt]The Chateau[/size] 5 July - 19 September 2013
|
The Home We Built
|
Internal Wall Rendering of the Chateau nearing 90% completion...
|
A whole lot of them coming in...
|