Thank you bro, unfortunately my internet service has been intermittent for some days now, so I cannot upload pics. I promise to update as soon as service is restored. @Fidelo726, the foundation is not shallow, you need to see the pics again. I'll upload some pretty soon. |
Today is the foundation laying. Pic updates to follow later |
@Am Alone, I understand your point and we are keeping records. I just need approval from my client. This is not my house. |
Today is another beautiful day. All is set for monday. Pic update to follow soon |
@Olaisrich, thanks for yr message. I understand yr point and I know we wont be through with digging in 1 day but Id earlier mentioned there are times we will have to shift the goalpost in order to deal with oddities. |
and this
|
more pics
|
Today in pictures
|
Live from the project site. Digging has commenced and much to our advantage, it drizzled over night and as a result the ground is wet and the weather is cool. 8 men are on site and we are hoping that we should be half way done by today, all things being equal. |
caseymoney:Thanks , I'll make necessary adjustment by talking the guest bdrm door to the space where we have the guest bed toilet and the toilet in the space where you have the door. How about that? The guest bdrm door now face the staircase |
More
|
Pic updates from the site
|
Well now, more than 70% of materials for the foundation stage are in. I anticipate that there will be a lot of progress over the next few days, as we are working overtime to ensure that we finish on schedule. I obviously hope that the next few days will give you an appreciation for the attention to detail and build quality that we care about so much at NextHome Builder.
|
Urgent Request - Quotation needed for Boreholes. Send mail to NextHome@live.com |
By the way, where's KUNTASH? |
Today, the following materials itemized below are ready the site. 30 tons Granite 20 tons Sharp sand 30 tons Soft sand Peg & Tie rods The block and cement will be delivered as at when needed since the block maker's shop is just 3 minutes walk away from the site. We are now ready to break ground tomorrow. @Fidelo726, thank you. Too bad and a pity for the thief, cos I've sent remote lock code to the phone. It is a useless toy now |
Forgot to mention that my Nokia N97 mobile phone was stolen yesterday. So pic updates will be delayed till I gt a new phone or camera. |
As for me, I want to start producing ready-made lintels (2ft, 4ft, 6ft) So as to lower the cost of construction. remember you dont need carpenters, planks, welders anymore. Just buy it like you buy blocks ![]() |
The following materials have been paid for and are been expected at the site from today, I'll be taking deliveries from this morning. 30 ton Granite 20 ton Sharp sand 20 ton soft sand (Dagbolu) 1,000 litre GP tank 1,000 blocks 50 bags of cement |
They are 1 in thick. The supporting pole can be 2in galvanized or thick pipe. I'll send you the pic of the pole as well. Lemme check my files!
|
^^^ Thanks for your post and you are 101% right. As per yr request above, I'll need to get approval from my client. @love-tosin, nairalanders want to see yr costs updated on this thread! Should I go ahead? |
spyder880:This is how we do it! See your dream in reality. Its possible. The plywood can be reused 25 times. spyder880:I think we need to understand that I was not commissioned or paid to do the floor plan. Its a free design so doing the Ground floor is not my headache. If 3ppleT wants a redesign of his house plan, he will send me a mail as requested and I will do both floors. As for the study, give me a little time. But before then, 3ppleT you can assist by letting me know yr preference via email. Fhemmmy:Supported
|
@Fhemmy, kindly disregard the label. Wat do you think of the design? |
Let's take off the label "Madam's Bedroom". The couple can share "Old Trafford" Its big enough, bigger than wat's on the old plan. bugmenot:ConceptDraw or any other CAD software for draft designs like the one above, but I use Revit for do the main drawing. |
You can have free consultation from me on NextHome Builder on all aspects and anything related to house construction. Having designed, built and directly supervised more scores of houses, my knowledge and experience can be used by you to get a better house by design and professional work during construction Write to me to personally and you will get reply within 48 hours. OUR SERVICES 1. Architectural Services We can design, supervise and build your dream houses by providing you effective and relative guidance for: a) Preparation of Plan of the building b) Elevations both 2D and 3D c) Submission drawings to the local authority d) Engineering Estimate specifying cost for each item of work e) Structural Engineering drawings for execution of the work f) Detailed architectural drawings for the work g) Interior design h) Landscape and exterior work details i) Site visits as and when required for guidance and supervision 2. Real Estate Assistance For purchase of land or building, we can provide you the following services: a) Locating land or building for purchase with the assistance of our Real Estate division ( in and around Lagos, Ogun, Ibadan only). b) Architectural, Structural and Legal evaluation of the property to be purchased c) Verification of title documents of the property by legal experts d) Documentation of the property purchase e) Assistance for registration of the property and after registration formalities f) Periodic maintenance of the property 3. Construction of the building We can take up construction of the building with complete professional care and guidance anywhere(on case to case basis) subject to acceptance of terms and conditions of our construction division directly by using our trained work force, with complete supervision and guidance by our architects and engineers. 4. Interior design We have a team of experienced and qualified Interior designers with complete man power and infrastructure to implement interior work with all the goodness of traditional NextHome Architecture and with modern technology and innovations. 5. Remodeling, Interior and furnishing of your existing building Your existing old building can be made new(renovated) with remodeling, interior modifications and furnishings by our experts 6. Land scaping and other services Our experts can convert your vacant space into more useful space and enhance its appearance and utility. Land around your house can be converted into more useful space with better appearance and aesthetic look. . Any other services related to your building also can be referred to us. We have qualified experts with experience in building hundreds of houses in different parts of the country. Mail your enquiries to us.
|
Off to site |
3ppleT, check out this new design for your first floor.
|
^^^ Thanks man. Still arranging materials. Hope to start taking deliveries from this afternoon. B4 then, I'll be meeting with other builders in the neighbourhood to see how we can benefit from each other. No man is an island. One site adjacent to mine is building three units of 3 bedroom duplex and they are already at decking stage. Lets see how I can benefit from them. |
I'm using the phone to browse right now. But if in doubt, I'm prepared to spend whatever it will cost if I have anyone who can guarantee that the touch screen can be fixed or replaced. i know the battery is possible. I just hate the phone for being useless. The touch screen cannot stop calls when I made calls. I need to tell the other party to cut off the phone from the other side. |
@all interested party, my prob with the phone starts from the day i bought it. I have used 3 iphones (2g, 3g and 3gs) and I thought N97 would or could provide better functionality then. I bought it for N90k or something higher, cant remember, in PromoTower Abeokuta beside Slot. So its not a China phone. The problems: 1. Touch Screen ( not very responsive) 2. Battery I just cant say I want to dash it out, otherwise I would have. Its not MINI, minis were released maybe 3 months after I bought this. If you want to have a real time display of the phone, I can do so right away. Its working but the touch is crazy. +2348023429122 |
@Cinzo, I never know how close we are until I saw yr floor plan and the location of yr project. |
Pukkah:Usually, a rainy day mean a lost working day to building projects. Planning ahead will ensure that project construction is executed without unexpected costs or delays. Well-planned projects cost less than projects that are implemented in a crisis situation, so get ready before the rain is forecasted and be prepared. Do the following: 1. Get timely collection of meteorological information! 2. Get adequate materials or supplies on site. It will do absolutely no good to merely have materials ordered when the rainstorm comes. Although, there are times when you may need to shift goalpost. Anything is possible if you do it right! |