Properties › Re: Construction Of D’Royal Apartments By Charisdesigns by Charisdesigns(op): 9:21pm On Nov 01, 2022 |
More
|
Properties › Re: Construction Of D’Royal Apartments By Charisdesigns by Charisdesigns(op): 9:20pm On Nov 01, 2022 |
Windows
|
Properties › Re: Construction Of D’Royal Apartments By Charisdesigns by Charisdesigns(op): 8:40pm On Oct 31, 2022 |
Windows are up
Mechanical fittings done Electrical system underway
Plastering underway
More pictures from this site tomorrow |
Properties › Re: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 8:39pm On Oct 31, 2022 |
Pad footing
|
Properties › Re: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 8:29pm On Oct 31, 2022 |
Our reinforcement are up and standing
|
Properties › Re: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 8:01pm On Oct 28, 2022 |
More
|
Properties › Re: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 7:54pm On Oct 28, 2022 |
Pics 1 : Combined footing Pics 2 : 6y16 starter bars Pics 3 : combined footing
|
Properties › Re: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 7:47pm On Oct 28, 2022 |
Reinforcement
Our foundation Mat is well spread to support the expected localized imposed load.
Reinforcement brand Tiger Tmt
|
Properties › Re: Construction Of D’Royal Apartments By Charisdesigns by Charisdesigns(op): 8:51pm On Oct 27, 2022 |
More pictures update here soon |
Properties › Re: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 8:34pm On Oct 27, 2022 |
Blinding
The purpose for blinding is to provide a clean surface for our strip foundation as well as our pad footing.
It is done with weak concrete
|
Properties › Re: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 8:29pm On Oct 27, 2022 |
The blocks we are using for this project are custom made blocks
|
Properties › Re: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 8:25pm On Oct 27, 2022 |
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Charisdesigns: 10:55pm On Oct 26, 2022 |
Hycon: I greet you all.
Please could anyone here state the cost of architectural design of a 3-4 bedroom bungalow.
What does it mean to have the electrical and mechanical drawings done separately?
Thanks in advance! Electrical drawing shows you information about power, lighting, etc While Mechanical drawing provides info about plumbing, ventilation etc and as such, it is different from Electrical drawing But then, you don’t need electrical or mechanical drawing when seeking for approval for bungalow at least in Lagos state. You can get it if you can afford it, it helps serve as a plan and guide to workmen on site. For bungalow designs and plans, you can check our thread dedicated to bungalow designs only https://www.nairaland.com/5783134/thread-bungalow-designs.we-offer-planningdesigning/3
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Charisdesigns: 10:42pm On Oct 26, 2022*. Modified: 10:59pm On Oct 26, 2022 |
Hargbo: Does anyone knows the process and cost of getting this in Lagos state Official rate is 200k plus But if you know your way you can get it way way less Meanwhile, beware some persons might want to charge you for board differently and reg number differently, don’t fall for that.
|
Properties › Re: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 10:32pm On Oct 26, 2022*. Modified: 8:13pm On Oct 27, 2022 |
It is worthy of note that the site was a borrow pit before.
|
Properties › Re: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 10:29pm On Oct 26, 2022 |
More
|
Properties › Re: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 10:11pm On Oct 26, 2022 |
Trench excavation
This involves digging and removal of sand from our strip Line and pad foundation footing
|
Properties › Re: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 4:58am On Oct 26, 2022 |
Our Building lines excavation lines Pad Foundation footing lines are up and we are ready for excavation.
|
Properties › Re: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 4:53am On Oct 26, 2022 |
We have hit the ground and running Firstly with
Setting Out
Basically, setting Out is the transferring of what we have on paper (plan) to the site. It is very important that this somewhat part of pre construction is gotten right.
|
Properties › Re: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 12:05pm On Oct 23, 2022 |
Materials arrives site
|
Properties › Re: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 8:02am On Oct 23, 2022 |
Pool side
|
Properties › Re: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 7:56am On Oct 23, 2022 |
Detailed 3D’s
This will be an interesting building
|
Properties › Re: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 7:49am On Oct 23, 2022 |
Here are some 2D / construction drawings
|
Properties › Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 7:44am On Oct 23, 2022 |
Good day great people of nairaland
To the glory of God we will be starting a new Residential development (#Empire)
The Proposed building is a 4 bedrooms duplex and a bq of 2 bedrooms apartment
Main building features
Ground floor
Living Room Visitors toilet Guests bedroom en-suite Dinning Stairwell Store Kitchen Gym
First floor
Private Living area Children bedroom en-suite Madam bedroom with walk-in closet Master bedroom with private sitting and walkin in closet Terrace
Boys quarters features
Living room area Visitors toilet Dinning area Kitchen 2 bedrooms en-suite
Site feature
Swimming pool Lots of landscaping
Land size : 500 sqr meters Budget: To be discolosed later
We welcome everyone to this construction dairy. |
Properties › Re: Construction Of D’Royal Apartments By Charisdesigns by Charisdesigns(op): 5:28pm On Oct 12, 2022 |
More
|
Properties › Re: Construction Of D’Royal Apartments By Charisdesigns by Charisdesigns(op): 5:26pm On Oct 12, 2022 |
MEP Underway
|
Properties › Re: Construction Of D’Royal Apartments By Charisdesigns by Charisdesigns(op): 5:21pm On Oct 12, 2022 |
Roof covering
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Charisdesigns: 3:52pm On Oct 07, 2022 |
Rapunzel403: Hello gurus on this educating thread, i want to seize this opportunity to thank you all for the well seasoned information I've gathered from here. We started our kobokobo project 2months ago and below are the pics of how far we have gone. It's a 5 room bungalow with penthouse as the current economy won't permit us own a duplex yet. �. PS: the height of the foundation is 6coaches of blocks + the beam all round which makes it about 7coaches before German flooring. Please what is the pros and cons of this type of foundation. It's on a dry table and solid ground. Oga Spyder Oga Hajj Oga twinskenny Oga feigk All other gurus Please come Chuck mouth for this matter. Thanks This kind of floor beam is usually introduced in a sloppy terrain, or where the foundation height needs to be high The perceived advantage are 1) It connects all the column and make them act monolithically 2) Consider building a tall fence without providing an intermediate beam, it will crumble because of it unsupported height 3) when settlement occurs in the building, the connected beam makes the structure settle in unionism instead of settling differentially 4) with your already 6 foundation block and 10 extra going up, we will have a column height greater than 15ft, hence it (foundation /tie beam) will serve as a column breaker. 5) Also remember that tall foundation will mean more backfilling, hence more load acting on both the internal and external walls, therefore introducing the ground beam will provide more strength to the foundation. See how we applied it in this project of ours https://www.nairaland.com/6781323/construction-droyal-apartments-charisdesigns/1
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Charisdesigns: 3:34pm On Oct 07, 2022 |
back2sender: When Govt said integrity test will be carried on suspected buildings, How is the integrity test carried out? is it using hammer to strike the pillars? or what.
How is this carried out in simple layman terms
Thank you It other name is Non destructive test (NDT) Mr kola have explained the process |
Properties › Re: Beautiful Bungalow Floor Plans and Designs in Nigeria (2, 3 & 4 Bedroom) by Charisdesigns(op): 7:07pm On Oct 02, 2022 |
...
|
Properties › Re: Construction Of D’Royal Apartments By Charisdesigns by Charisdesigns(op): 7:05pm On Oct 02, 2022 |
Next update Roofing |
Properties › Re: Construction Of D’Royal Apartments By Charisdesigns by Charisdesigns(op): 1:20pm On Oct 02, 2022 |
Meanwhile coming soon
ProjectEmpire
4 bedrooms contemporary duplex by Charisdesigns
|