₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,329,868 members, 8,442,678 topics. Date: Friday, 10 July 2026 at 01:28 PM

Toggle theme

Charisdesigns's Posts

Nairaland ForumCharisdesigns's ProfileCharisdesigns's Posts

1 2 3 4 5 6 7 8 ... 14 15 16 17 18 19 20 21 22 (of 40 pages)

PropertiesRe: Construction Of D’Royal Apartments By Charisdesigns by Charisdesigns(op): 9:21pm On Nov 01, 2022
More

PropertiesRe: Construction Of D’Royal Apartments By Charisdesigns by Charisdesigns(op): 9:20pm On Nov 01, 2022
Windows

PropertiesRe: Construction Of D’Royal Apartments By Charisdesigns by Charisdesigns(op): 8:40pm On Oct 31, 2022
Windows are up

Mechanical fittings done
Electrical system underway

Plastering underway

More pictures from this site tomorrow
PropertiesRe: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 8:39pm On Oct 31, 2022
Pad footing

PropertiesRe: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 8:29pm On Oct 31, 2022
Our reinforcement are up and standing

PropertiesRe: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 8:01pm On Oct 28, 2022
More

PropertiesRe: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 7:54pm On Oct 28, 2022
Pics 1 : Combined footing
Pics 2 : 6y16 starter bars
Pics 3 : combined footing

PropertiesRe: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 7:47pm On Oct 28, 2022
Reinforcement

Our foundation Mat is well spread to support the expected localized imposed load.

Reinforcement brand
Tiger Tmt

PropertiesRe: Construction Of D’Royal Apartments By Charisdesigns by Charisdesigns(op): 8:51pm On Oct 27, 2022
More pictures update here soon
PropertiesRe: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 8:34pm On Oct 27, 2022
Blinding

The purpose for blinding is to provide a clean surface for our strip foundation as well as our pad footing.

It is done with weak concrete

PropertiesRe: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 8:29pm On Oct 27, 2022
The blocks we are using for this project are custom made blocks

PropertiesRe: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 8:25pm On Oct 27, 2022
luvlyoracle:
Nice..following
Thanks for following
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Charisdesigns: 10:55pm On Oct 26, 2022
Hycon:
I greet you all.

Please could anyone here state the cost of architectural design of a 3-4 bedroom bungalow.

What does it mean to have the electrical and mechanical drawings done separately?

Thanks in advance!
Electrical drawing shows you information about power, lighting, etc
While
Mechanical drawing provides info about plumbing, ventilation etc and as such, it is different from Electrical drawing

But then, you don’t need electrical or mechanical drawing when seeking for approval for bungalow at least in Lagos state.

You can get it if you can afford it, it helps serve as a plan and guide to workmen on site.


For bungalow designs and plans, you can check our thread dedicated to bungalow designs only

https://www.nairaland.com/5783134/thread-bungalow-designs.we-offer-planningdesigning/3

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Charisdesigns:
Hargbo:
Does anyone knows the process and cost of getting this in Lagos state
Official rate is 200k plus

But if you know your way you can get it way way less

Meanwhile, beware some persons might want to charge you for board differently and reg number differently, don’t fall for that.

PropertiesRe: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op):
It is worthy of note that the site was a borrow pit before.

PropertiesRe: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 10:29pm On Oct 26, 2022
More

PropertiesRe: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 10:11pm On Oct 26, 2022
Trench excavation

This involves digging and removal of sand from our strip Line and pad foundation footing

PropertiesRe: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 4:58am On Oct 26, 2022
Our
Building lines
excavation lines
Pad Foundation footing lines are up and we are ready for excavation.

PropertiesRe: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 4:53am On Oct 26, 2022
We have hit the ground and running
Firstly with

Setting Out

Basically, setting Out is the transferring of what we have on paper (plan) to the site. It is very important that this somewhat part of pre construction is gotten right.

PropertiesRe: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 12:05pm On Oct 23, 2022
Materials arrives site

PropertiesRe: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 8:02am On Oct 23, 2022
Pool side

PropertiesRe: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 7:56am On Oct 23, 2022
Detailed 3D’s

This will be an interesting building

PropertiesRe: Construction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 7:49am On Oct 23, 2022
Here are some 2D / construction drawings

PropertiesConstruction Of A Signature Private Residence With A Pool @ New Opic by Charisdesigns(op): 7:44am On Oct 23, 2022
Good day great people of nairaland

To the glory of God we will be starting a new Residential development (#Empire)

The Proposed building is a 4 bedrooms duplex and a bq of 2 bedrooms apartment

Main building features

Ground floor

Living Room
Visitors toilet
Guests bedroom en-suite
Dinning
Stairwell
Store
Kitchen
Gym

First floor

Private Living area
Children bedroom en-suite
Madam bedroom with walk-in closet
Master bedroom with private sitting and walkin in closet
Terrace

Boys quarters features

Living room area
Visitors toilet
Dinning area
Kitchen
2 bedrooms en-suite

Site feature

Swimming pool
Lots of landscaping

Land size : 500 sqr meters
Budget: To be discolosed later

We welcome everyone to this construction dairy.
PropertiesRe: Construction Of D’Royal Apartments By Charisdesigns by Charisdesigns(op): 5:28pm On Oct 12, 2022
More

PropertiesRe: Construction Of D’Royal Apartments By Charisdesigns by Charisdesigns(op): 5:26pm On Oct 12, 2022
MEP Underway

PropertiesRe: Construction Of D’Royal Apartments By Charisdesigns by Charisdesigns(op): 5:21pm On Oct 12, 2022
Roof covering

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Charisdesigns: 3:52pm On Oct 07, 2022
Rapunzel403:
Hello gurus on this educating thread, i want to seize this opportunity to thank you all for the well seasoned information I've gathered from here. We started our kobokobo project 2months ago and below are the pics of how far we have gone. It's a 5 room bungalow with penthouse as the current economy won't permit us own a duplex yet. �.
PS: the height of the foundation is 6coaches of blocks + the beam all round which makes it about 7coaches before German flooring. Please what is the pros and cons of this type of foundation. It's on a dry table and solid ground.
Oga Spyder
Oga Hajj
Oga twinskenny
Oga feigk
All other gurus
Please come Chuck mouth for this matter. Thanks
This kind of floor beam is usually introduced in a sloppy terrain, or where the foundation height needs to be high

The perceived advantage are

1) It connects all the column and make them act monolithically

2) Consider building a tall fence without providing an intermediate beam, it will crumble because of it unsupported height

3) when settlement occurs in the building, the connected beam makes the structure settle in unionism instead of settling differentially

4) with your already 6 foundation block and 10 extra going up, we will have a column height greater than 15ft, hence it (foundation /tie beam) will serve as a column breaker.

5) Also remember that tall foundation will mean more backfilling, hence more load acting on both the internal and external walls, therefore introducing the ground beam will provide more strength to the foundation.

See how we applied it in this project of ours

https://www.nairaland.com/6781323/construction-droyal-apartments-charisdesigns/1

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Charisdesigns: 3:34pm On Oct 07, 2022
back2sender:
When Govt said integrity test will be carried on suspected buildings, How is the integrity test carried out? is it using hammer to strike the pillars? or what.

How is this carried out in simple layman terms

Thank you
It other name is Non destructive test (NDT)

Mr kola have explained the process
PropertiesRe: Beautiful Bungalow Floor Plans and Designs in Nigeria (2, 3 & 4 Bedroom) by Charisdesigns(op): 7:07pm On Oct 02, 2022
...

PropertiesRe: Construction Of D’Royal Apartments By Charisdesigns by Charisdesigns(op): 7:05pm On Oct 02, 2022
Next update
Roofing
PropertiesRe: Construction Of D’Royal Apartments By Charisdesigns by Charisdesigns(op): 1:20pm On Oct 02, 2022
Meanwhile coming soon

ProjectEmpire

4 bedrooms contemporary duplex by Charisdesigns

1 2 3 4 5 6 7 8 ... 14 15 16 17 18 19 20 21 22 (of 40 pages)