Events › Re: Extravagant Birthday Party Within The Budget Of N1.5m (event Planners Only) by joshua112: 4:16pm On Jan 24, 2018 |
where do you want as the venue assuming we are using a hall. are you on the island or mainland? |
Events › Magnates Pavilion Event Centre by joshua112(op): 6:39am On Jun 22, 2017 |
INTRODUCING MAGNATES PAVILION EVENT CENTRE,A 500 CAPACITY MARQUEE LOCATED AT 29 SEMIU TIAMIYU STREET,HILLTOP ESTATE ABORU,IYANA IPAJA LAGOS.WE ARE ALSO EVENT PLANNERS ,CATERERS AND DECORATORS CONTACT US ON 09097329143 OR 08028537298
|
Properties › Re: VERY IMPORTANT: Mistakes Architects Make And Should Be Avoided by joshua112: 4:08pm On Jun 04, 2016 |
Now tell me how the cars entered this building. The 3d is beautiful, it shows 2 Cars in the compound. I don't know the cars drove through the gate and made a perfect turn to the right.
Even if the cars where dropped with helicopter. The driver can not open the door. Because it will be obstructed by the fence.
This is what happens when the site plan isn't properly planned. you are very correct on your observation about architects and their drawing. I am also an architect with over 10yrs experience but from what I observed we have two types of architects ,the office architect then the site architect who is very much involved in construction .by the time you compare drawings done by the two types of architects, you will notice that the site architects has more accurate drawings cos from he's design he already knows what will work on site and what will not work but an office architect with no site experience will only do designs that are aesthetically ok but functionality is zero. Explaining why we also have mistakes is that some 3d are being done by visual artist not all are done by architects that's why you see those mistakes. We also have what we call anthropometrics that we learnt in school which is just a study of how human beings relate to sizes of spaces in buildings, not all architects put this into consideration while doing there design example is car park spaces,setbacks,staircase sizes for both residential and public buildings etc I have a lot on this issue to say but time wont permit me. you can contact me on 08031332857 for your quality architectural drawings.im also into construction |
Properties › Re: The Making Of A Low Budget 5 Bedroom Duplex (with Costs) by joshua112: 5:12pm On May 12, 2016 |
cadno: Hello, I just came across this tread and am so happy...thanks guys. Pls how can I verify that the approved building plan I got from Ogun state Govt, is the genuine approval. My architech handled the process. Just lik the old days drivers license that people do , but we later found out that it was not on FRSC database. Pls is there a site or method I can use to verify. Don't want Govt to come in 5years time to tell me my building plan approval is not original. kindly advise. Thanks. ITS VERY SIMPLE ,PLEASE JUST GO TO THE LOCAL GOVERNMENT PLANNING OFFICE UNDER WHICH YOU JOB FALLS SO THEY CAN VERIFY THE APPROVED DRAWINGS FOR YOU.THANKS |
Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by joshua112: 4:14pm On Apr 21, 2016 |
skimanski: # OSAPA TOWN "B CLOSE" DUPLEXES DEVELOPMENT
Closing down on Final Painting Finish then for your gate design,what sizes of pipes did you use ,then is it iron rod u used in making the circles on the gate.thanks |
Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by joshua112: 4:13pm On Apr 21, 2016 |
skimanski: # OSAPA TOWN "B CLOSE" DUPLEXES DEVELOPMENT
Closing down on Final Painting Finish wow very nice colors so oga skimanski what are the final colors cos I can see dark brown and purple or so.thanks |
Properties › Re: The Making Of A Low Budget 5 Bedroom Duplex (with Costs) by joshua112: 7:07pm On Apr 19, 2016 |
whyteboyz03: My email is whyteboyz03@yahoo.com. What info do u need to start the plan and how much will it cost? I'd also need a BOQ sorry for the late response sir,i have sent you a mail,thanks |
Properties › Re: Proper Analysis Of Design And Cost Of A Foundation Design For Bungalows by joshua112: 7:43pm On Apr 04, 2016 |
joshua112: GOOD DAY FIRST OF ALL REDUCE THE TOTAL TON OF REINFORCEMENT FOR BOTH BEAM AND SLAB TO 5TONS OR MAX 6TONS FOR TOTAL 2 BY 3 FOR BOTH BEAMS AND SLAB REDUCE TO 300 PCS .LET THE 1 BY 12 WOOD BE 450PCS. |
Properties › Re: Proper Analysis Of Design And Cost Of A Foundation Design For Bungalows by joshua112: 7:37pm On Apr 04, 2016 |
Yaskin4all: Please, can any experience builder Supersede the quotes? if you do, i will really like to work with you ASAP This is what the builder managing the site gave me and i think its three much, site in isheri north
First Floor Slab (310sq.m) Cement 235 baqs 1500 352500 Granite 1/2 inch 3 20tons 55000 165000 Sharp sand 2 30tons 135000 270000 Reinforcement (10,12,16mm) 7tons 115000 805000 Binding wire 5 rolls 6000 30000 Wood 1'' x 12'' x 12'' wood 320 boards1000 320000 2'' x 3'' 420 nr 400 168000 Nail various size 7bags 7000 49000 Beams (12cu.m) Cement 55 bags 1500 82500 Granite 1/2 inch 1 10tons 45000 45000 Sharp sand 1 10tons 25000 25000 Reinforcement (10,12,16mm) 2tons 115000 230000 Binding wire 1 rolls 6000 6000 Wood 1'' x 12'' x 12'' wood 155 boards 1000 155000 2'' x 3'' 180 nr 400 72000 Bamboo 350 nr 250 87500 Nail various size 6 bags 7000 42000 FIRST FLOOR SLAB 2,904,500 Yaskin4all: Please, can any experience builder Supersede the quotes? if you do, i will really like to work with you ASAP This is what the builder managing the site gave me and i think its three much, site in isheri north First Floor Slab (310sq.m) Cement 235 baqs 1500 352500 Granite 1/2 inch 3 20tons 55000 165000 Sharp sand 2 30tons 135000 270000 Reinforcement (10,12,16mm) 7tons 115000 805000 Binding wire 5 rolls 6000 30000 Wood 1'' x 12'' x 12'' wood 320 boards1000 320000 2'' x 3'' 420 nr 400 168000 Nail various size 7bags 7000 49000 Beams (12cu.m) Cement 55 bags 1500 82500 Granite 1/2 inch 1 10tons 45000 45000 Sharp sand 1 10tons 25000 25000 Reinforcement (10,12,16mm) 2tons 115000 230000 Binding wire 1 rolls 6000 6000 Wood 1'' x 12'' x 12'' wood 155 boards 1000 155000 2'' x 3'' 180 nr 400 72000 Bamboo 350 nr 250 87500 Nail various size 6 bags 7000 42000 FIRST FLOOR SLAB 2,904,500 Yaskin4all: Please, can any experience builder Supersede the quotes? if you do, i will really like to work with you ASAP This is what the builder managing the site gave me and i think its three much, site in isheri north
First Floor Slab (310sq.m) Cement 235 baqs 1500 352500 Granite 1/2 inch 3 20tons 55000 165000 Sharp sand 2 30tons 135000 270000 Reinforcement (10,12,16mm) 7tons 115000 805000 Binding wire 5 rolls 6000 30000 Wood 1'' x 12'' x 12'' wood 320 boards1000 320000 2'' x 3'' 420 nr 400 168000 Nail various size 7bags 7000 49000 Beams (12cu.m) Cement 55 bags 1500 82500 Granite 1/2 inch 1 10tons 45000 45000 Sharp sand 1 10tons 25000 25000 Reinforcement (10,12,16mm) 2tons 115000 230000 Binding wire 1 rolls 6000 6000 Wood 1'' x 12'' x 12'' wood 155 boards 1000 155000 2'' x 3'' 180 nr 400 72000 Bamboo 350 nr 250 87500 Nail various size 6 bags 7000 42000 FIRST FLOOR SLAB 2,904,500 GOOD DAY FIRST OF ALL REDUCE THE TOTAL TON OF REINFORCEMENT FOR BOTH BEAM AND SLAB TO 5TONS OR MAX 6TONS |
Properties › Re: The Making Of A Low Budget 5 Bedroom Duplex (with Costs) by joshua112: 7:10pm On Apr 04, 2016 |
whyteboyz03: Good morning everyone. I need an architect to give me a good 8 units of 2 bedroom flats on a plot of land ( 100x50 ) mr whyte you can contact me on 08031332857 im an architect /building contractor. thanks if you send me your email add I can send to you some of my works. bb pin 2C14767C |
Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by joshua112: 3:37pm On Mar 29, 2016 |
skimanski: Current Look from and favorite Perspective View pls what colours did u paint the house outside.im seeing skyblue and grey from this pix. pls clarify thanks |
Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by joshua112: 4:28pm On Mar 25, 2016 |
skimanski: N3,700 / Sq.m THANKS OGA SKIMASNKI BUT PLS IS THIS PRICE STILL APPLICABLE NOW PUTTING INTO CONSIDERATION COST OF MATERIALS DUE TO DOLLAR RATE.THEN HOW MUCH DO U PAY FOR LABOUR ONLY FOR THE SUSPENDED CEILING(POP) |
Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by joshua112: 4:32pm On Mar 23, 2016 |
skimanski: Conclusion of First POP Design and Resumption of Second POP Design PLEASE HOW MUCH IS UR LABOUR AND MATERIAL TOGETHER PER SQMTS FOR POP SUSPENDED CEILING ON THE FIRST FLOOR.THANKS |
Properties › Re: The Making Of A Low Budget 5 Bedroom Duplex (with Costs) by joshua112: 7:33pm On Mar 21, 2016 |
Jyde81: Any idea of the cost estimates to build a twin two bedroom flats en suite. Urgent replies please you can budget like 7m depending on your finishings and type of foundation .it can still go less it all deoneds on your taste |
Properties › Re: The Making Of A Low Budget 5 Bedroom Duplex (with Costs) by joshua112: 7:18pm On Mar 04, 2016 |
|
Properties › Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by joshua112: 7:24pm On Feb 22, 2016 |
CASTOSVILLA: Everybody here is my pal and we've not met either. lol castovilla anyways thanks for the compliment.God bless u sir |
Properties › Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by joshua112: 5:45pm On Feb 20, 2016 |
CASTOSVILLA: You're a good man. Oga larry, this is my beloved pal, listen to him. thanks oga castovilla but I cant remember who you are maybe we might have met before but I cant just remember pls can u remind me.thanks |
Properties › Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by joshua112: 5:43pm On Feb 20, 2016 |
[quote author=allen0000 post=42981846][/quote]for this duplex design you sent me,pls budget between 15 to 20 million depending on the type of finishing you want to use.thanks |
Properties › Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by joshua112: 5:50pm On Feb 16, 2016 |
iamlarry99: Overview PLS MR LARRY ALTHOUGH EVERBODY IS TRYIGN TO HELP YOU OUT PROFESSIONALLY BUT I WOULD ADVISE YOU TO BEWARE OF PEOPLE THAT TELL YOU IT WILL BE CHEAPER BUILDING THE 3 BEDROOM BUNGALOW COS MOST PPLE ARE DESPERATE TO GET JOBS .I MUST TELL U CONSTRUCTION IS COSTLY NOW PUTTING INTO CONSIDERATION THE DOLLAR RATE NOW.MY BUNGALOW OF 4BEDROOMS ON A HALF PLOT BUILT 2013 COS ME 6 TO 7MILLION THEN AND I DID NOT EVEN DO A CONCRETE FASCIA OR EVEN USE EXPENSIVE FINISHINGS,ALTHOUGH ITS A LONG BUILDING ITS A 7M BY 26M HOUSE SO THINK OF THE COST OF A BUNGALOW NOW THAT WE ARE IN 2016. PLS LISTEN TO THE PROFESSIONALS CAREFULLY I WOULD ADVISE YOU DO THE PROJECT GRADUALLY STOP WHERE UR 3MILLION REACHES AND CONTINUE LATER .IM ALSO A PROFESSIONAL IN THE FIELD SO PLS TAKE TO MY ADVISE.THANKS SIR |
Properties › Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by joshua112: 5:40pm On Feb 16, 2016 |
allen0000: This is the plan PLEASE GIVE ME THE LENGHT AND BREADTH OF THE BULDING EITHER IN FEET OR METRES SO I CAN GIVE U AN ESTIMATE |
Properties › Re: How Much Would It Cost Me To Complete This 3Bedroom Bungalow? by joshua112: 6:50pm On Feb 15, 2016 |
iamlarry99: Builders Pls! How Much Would It Cost Me To Complete This 3bedroom Bungalow
How much would it cost me to complete this 3bedroom bungalow without the car park room, in areas such as mowe, ikorodu etc? please budget 6m upwards ,max 8 million depending on the kind of finishing you need, im an architect/ contractor by profession .you can call me on 08023327879 for further enquiries |
Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by joshua112: 7:56pm On Jan 19, 2016 |
skimanski: Arrival of Hard Wood for Roofing Works nice work sir,please can u help me with the price of your hardwood and what type of hardwood did you buy.thanks |
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by joshua112: 5:49pm On Dec 01, 2015 |
Drmola: How many blocks will be enough for a 4,bedroom bungalow I can help you calculate the number of blocks you will need if you have the design ready. If you have not done a design I can do that for you if u need my services.im an architect/building contractor by profession. you can call me on 08031332857 |
Properties › Re: Ask All Your Questions On Building Foundations/structural Issues -expert by joshua112: 12:16pm On Nov 30, 2015 |
Eragablessen: Bless you op for a demanding thread like this. I've bought a land but plans to start my building by Feb. 2016. The structures i hope should include 3 bedrooms, 2bathrooms and toilet each, 1 living room/kitchen, 1 dining room, small utility room and a gym room. I also want a "p.o.p" bent on the living room. Please do you have any idea on how i should go with the plans so as not to avoid architectural errors Thanks. Modified, its going to be a flat pls... im an architect ,I can do the designs for you if you need my services .you can call me on 08031332857. my company name is archcrete limited if you also send my your email address I can send you a profile of some of the house s I have designed and built for clients. thank you |
Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by joshua112: 9:12am On Nov 02, 2015 |
skimanski: The Guy that does my Wall Screeding Brings in His Brothers (According to him) to do POP and Precast Window designs. He is incharge of POP, Screeding and Precast Window Designs. HIs Name is Peter. 07062160256.
The Concept are been created by me and executed under Thorough Supervision. Supervisors are been paid extra to supervise each and every phase, hence the outcome. We have had cases where out clients weren't happy with the outcome even though the concept was there, as a result, we have seen the need to get a supervisor for every stage so as to improve the outcome of our Jobs. So in a nutshell I cannot guarantee the quality of their work if you eventually seek their service. thanks oga skimanski,i just wanted there number incase I start my own jobs soon im an architect and im into construction too so supervising them wont be an issue .I will also be asking for your electrician,iron bender etc numbers as I intend starting a construction on the lekki axis soon.thanks for the help God bless |
Properties › Re: Architectural Masterpieces From Black Lake House by joshua112: 9:05am On Nov 02, 2015 |
guttentag: No, the soil is hard and located in edo state, Please can you help me with breakdown on the cost of building a three bedroom thanks You since its in edo for a 3 bedroom bungalow you can budget like 5 to 6 million but if its for say a 4 bedroom you can budget like 7m cos I know there is scarcity of water in edo.i still worked on a renovation somewhere in epoma early this year (ogagbo village precisely)its off opoji junction.you can call me on 08031332857 for further enquiries on your building but hope the drawing has been done. |
Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by joshua112: 7:35pm On Oct 31, 2015 |
skimanski: More POP Ceiling Works.
When we Build Your House, You don't have to worry About Thinking. Lets do the Thinking and Execution for You.
Dezyns and Structures nice POP work mr skimanski pls can you give me the number of ur pop guy.thanks |
Properties › Re: New Dimension To Nigerian Architecture (construction Of 4 Bedroom Twin Duplex) by joshua112: 6:54am On Oct 08, 2015 |
skimanski: Internal Plastering works Still ongoing PLS OGA SKIMANSKI I NOTICED THE SOFFIT OF THE DECKING WAS NOT PLASTERED FIRST BEFORE THE WALL OR DO U INTEND SCREEDING IT DIRECTLY INSTEAD OF PLASTERING |
Properties › Re: Architecture: Construction Of Duplex In Lekki & Akwa-Ibom State. by joshua112: 6:57pm On Oct 03, 2015 |
skimanski: PROGRESSING GOOD DAY AND NICE JOB ,PLS HOW DID U ACHIEVE THE CIRCLES ON THE EXTERNAL WALL AND WHATS INSIDE THE CIRLCE ,IS IT GLASS THANK YOU |
Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by joshua112: 12:28pm On Sep 21, 2015 |
skimanski: Nothing really. Just to avoid the Iron Bars dancing around the place, hence holding the reinforcement in one place. you can choose to leave yours if you wish. thanks keep up the good job.hope to meet you someday im an architect myself but most of my jobs are in abuja |
Properties › Re: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by joshua112: 3:12pm On Sep 19, 2015 |
skimanski: Standing our Pillar Irons and Wood oga skimanski weldone good job but I always wonder .whats the main reason why u tie ur reinforcement at the top of the pillars. |
Properties › Re: Lekki Gardens Finishings. by joshua112: 4:16pm On Sep 15, 2015 |
skimanski: FINAL TOILET TILING WORKS pls oga skimanski did u cut those small red square tiles out from a big tile or u bought them in small squares like that. |