Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 7:52pm On Aug 25, 2021 |
kopell: My brother all the tools are available in Nigeria it is our that are not investing in them, they artist-son Prefer to invest their money in pepper soup instead. Many of them are not ready to learn how to used those tool even when you make it available for them, to improve their knowledge and make life easier for them get me tools to make sanding easier. I will pay for it. Thank you |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 7:50pm On Aug 25, 2021 |
kopell: Please stop �what long way, my brother if you don’t know seek knowledge many of these things are made right here in Nigeria. We argued some of these stuffs last year. Here we go again, just like tiles, pvc pipes, pop cement, W’c ceramic, Led lights switches, electrical distribution boxes, best of its all Nigeria electric cables still one of the best in the world till date. I can go on and on guys with many many more items designs and manufacture here. Stop being deceived with those Foreign labels here's the difference between the aforementioned goods and doors, while educated and rich people with exposure handle the former, you see making of iron doors, it's still left for crude,semi literate and unexposed people. Just the other day, someone came to my shop arguing it is better to use hand saw to cut pipes instead of angle grinder. I tried to tell him otherwise and he reminded me he started this job long before I knew it existed. Having said that, there was at least ₦500 price increase in price of materials I work with yesterday. Like every individual iron increased by at least ₦500. Some were as high as ₦700. I don't know where we go from here and what happens to quotes already submitted |
Travel › Re: Four Die, Many Injured In Fatal Auto Crash In Delta by michlins(m): 7:46pm On Aug 25, 2021 |
Ilovezzor: Ah that trailer was still burning sometime this evening I saw it on my way back from. Abj
Good rest their souls o God rest their souls amen |
Travel › Re: Four Die, Many Injured In Fatal Auto Crash In Delta by michlins(m): 7:20pm On Aug 25, 2021 |
arthurwillia: Jesue
Chai I Dey fear travel always Mehn
Is it a transport company bus as you can see, the bus is thorn to shreds. Can't really see the name. It caused a gridlock on the said road |
Travel › Re: Four Die, Many Injured In Fatal Auto Crash In Delta by michlins(m): 6:52pm On Aug 25, 2021 |
erico2k2: Bad roads force people to drive on opposite sides of the road. How I wish the Fg would fix roads so we can truly ENjoy what Dual carriage was meant to do! I'm not sure it's the issue of dual carriage way. I saw this accident with my own eyes yesterday. The driver rammed into the truck and burst into flames |
Travel › Re: Four Die, Many Injured In Fatal Auto Crash In Delta by michlins(m): 6:16pm On Aug 25, 2021 |
Saw this accident yesterday. I'm not sure anyone would survive it.
I only prayed for their quick death. It will be useless for them to suffer from the injuries and still die |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 5:55pm On Aug 25, 2021 |
erico2k2: It won't be long b4 the Tech and know-how jits us in Nigeria the tools are very important. Up till now,we still do sanding manually. But with the tools available, we're doing quite well. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 5:44pm On Aug 25, 2021 |
n3xt: I know those doors will keep Turkey doors off our market if we have them in Nigeria.
Let me open discussion with the guy and see what I can come up with. it will take more than materials to keep turkey doors off our market. From the tools, to the skills and branding. We still have a long way to go but this is a step in the right direction |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 5:02pm On Aug 25, 2021 |
n3xt: Are these beautiful sturvs available in our local market yet?
Found these online by someone who’s ready to export. import these and turn millionaire in six months |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 2:49pm On Aug 25, 2021 |
diordaves: Businesses keep evolving. The business environment keeps evolving. The customers keep evolving. There is constant change. However, this change has mostly to do only with the services demanded by customers and the way to deliver the service. Product quality, identity, and functionality stay the same.
For example, 1982 Benz is the 'same' as 2021 Benz. What "changed" are the features (services) demanded by 2021 customers - padded, internet connection, sat-nav, electric engine, sleek design, eco friendly, etc. But a person born in 1982 who went into a coma and came to in 2021 will still recognize a Benz even from a distance.
Another example, Savings Account in 1982 with passbook is the same in 2021. What "changed" are computers, the internet, and app. But savings account na savings account. This is recognized as PRODUCT IDENTITY. Some call it an instrument. What have all these got to do with you and your aggrieved client? Plenty.
You need to have PRODUCT IDENTITY. You cannot supply a 3.5ft (for example) door to Mr A and call it a 3ft door and supply a 2.5ft door to Mrs B and call it a 3ft door. No identity. A 3ft door is a 3ft door. A 4ft door is a 4ft door. Period. It is not your responsibility or prerogative if it would fit. That's the customer's prerogative. You are essentially a manufacturer who manufactures to measure. If the customer says please give me 3ft door; you price your product appropriately and give them 3ft door. Shikena.
I bought a house in South East London that needs modernization. I need to install a footpath wrought iron (garden) gate. So I went online. See the attached photo. This will give you an idea of how these things are done. Look carefully at the photo, you will see the size (Dimensions) and even weight. This is called PRODUCT SPECIFICATION. Look carefully again, you will see where the suppliers said "Fits a post to post GAP of 762mm . So upfront, I know what I'm ordering. Now if the gate is delivered and the specification doesn't match my invoice, I will return the product for a refund at the cost of the supplier. It is not what I ordered they delivered. Any explanation that I need to knock down walls or choke any gap to make the product fit is not acceptable. This is the issue you are currently having.
I'm not expecting you to start drafting (drawing) products. This will be costly and if you pass on this cost to your customers, they will complain. But I'm expecting you to include the dimensions in your invoice and deliver exactly the dimensions so contained. And leave the rest for the customer.
So going forward, write down the PRODUCT SPECIFICATION in your invoice issued to customers and as customer service, you may add "this product will fit an opening of bla, bla, bla". Then deliver exactly the dimensions in the invoice. You will be good. thank you for this |
Properties › Re: The Making Of The "7 Bedrooms High Ceiling Bungalow" In Anambra by michlins(m): 7:05am On Aug 25, 2021 |
spyder880: Closely inspecting the local wooden doors........... saw some doors which were made locally at one site in Lagos. I don't know if you might want them to do same for you. Trust me the doors are so good |
Politics › Re: IPOB Sit-At-Home: South East Not Safe To Hold Conference – NUJ by michlins(m): 7:06pm On Aug 24, 2021 |
And here goes all the monies that would have been pumped into SE.
Let's keep hurting our economy and think we're doing Buhari whose major concern is how to create cattle colonies.
This hate against Buhari will self destruct us and the sad thing is that the mofo doesn't care sef |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 7:00pm On Aug 24, 2021 |
InvertedHammer: / We are saying the same thing. Even if it is 2500mm x 2500mm, the exact measurements of the build should be defined. "This is how it is done" is not an excuse. Unit of measurement is not an assumption. Everyone building a house does not know "how it is done". They go with the S.I units of measurement which is a globally acceptable standard. But then, we learn as we go. If the quotation is for 4ft frame, just build and deliver 4ft frame. No ifs and buts. If there is any reason(s) why it will be less or more than the size, let the owner know before...and not after the build.
Michlins shouldn't take these things as personal attacks. It will rather help him get better at his quotations and estimates. Even the best corporations in the world have a litany of complaints against them.
/ at first I got angry and that's how I lashed out at her but then she's still my customer who gave me her hard earned money. That's what some family members won't do for you. And all these are opening me up to improved ways people do things. I might say am still running business the way I learnt from my boss. Will this type of thing happen to me again where I assume the customer knows what he or she wants, absolutely not |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 1:13pm On Aug 24, 2021 |
bixton: Apologies let me ask you this question.......
I can see that from the client's post of the door sent as mounted on the provided space the mortar chalking space is about 2-3" on the left side and on the right it's lapping on the wall. Please can you help read the dimension on the tape as shown on the pix as to where the door ends on it............ Thanks that should be 33" and 3ft is 36". That leaves a difference of 3" which is 1.5" on each side. |
Foreign Affairs › Re: Trump Supporter Says She Won't Get The Covid-19 Vaccine Because She Is A Goat by michlins(m): 12:11pm On Aug 24, 2021 |
It's now obvious that there's an even distribution of stupid people. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 12:06pm On Aug 24, 2021 |
gbadexy: @ michlins, would it be possible for you to modify and add the pipes on site to give the extra dimension. that job can't be modified at all. There's no way to modify that job at all |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 12:05pm On Aug 24, 2021 |
bixton: Even at that it's a no no for a main entrance door to be of that size. And of what good use is going for custom size.....
Some years ago I did a renovation for my family house. When I removed the wooden toilet/bathroom doors and took measurement of door opening it came out full 1000mm. I had previously asked the price for a toilet door without giving out any dimension/measurement. When I later sent the exact measurement to the GMP guy there was an increase in price and I had to pay. I only to do exactly what I gave him or give an allowance of 1" clearance on both sides of the door. the same clearance is the matter here. It's 1.5" on both sides. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 11:18am On Aug 24, 2021 |
n3xt: Wow!
After watching the video, I think it’s safe to conclude that the Contractor didn’t do right.
The size of the door with frame is 2ft 9inches (33 inches) and not 3ft (36 inches) which was exactly what the client ordered.
For me there’s no justification for this error and I agree that the vendor should make full refund for this.
Sincere apologies @eyinne for the inconveniences this might have caused you. there was never a time I claimed the doors were completely 36". I already explained what happened and I can't go on typing it all over again. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 11:02am On Aug 24, 2021 |
bixton: There are those who see you geninuely and there are others who don't. Because there are challenges in built environments, the most important obligation of a contractor is to satisfy the needs of the client. There are times it comes to near satisfaction but in this nearness it should be something that will not disrupt the client's sleep.
Just take all that's happening to be a learning process and try to know how you deal with every client ensuring you give them what will appeal to them delighting in every detail.
I am not holding brief for you and neither for the client. Reason is that judging by the pix posted by the client your fabrication with is in order except the client wants the frames hidden in block/mortar.
Another reason is that when a door is said to be of custom made and design it meets the exact size with little or no need for adjustments.
The above is one of the reasons I do a door opening of 1000mm instead of 900mm. Even in the noise and distractions, here's what I promise my clients. If I tell you that this thing is white, that's what it is. Another thing is to do my best to satisfy the client. What I can't do however is sell my self respect and dignity to appease someone. My goal is to deliver quality service while making honest living |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 10:15am On Aug 24, 2021 |
Enyinne: Oga , I'm not interested. What am interested now is my door . Don't deviate from the discussion. You are a cheat and i wont mince words saying it . Rectify this door issue and hv peace as we are just getting started so be ready for more . you paid for five (5) which have been delivered to you. I made peace with that. I hope you find peace too. Goodbye |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 9:52am On Aug 24, 2021 |
Enyinne: Have i called u names before now ? In all our prior discussion have i called u names ? No . But yesterday when u started exhibiting those trait then i decided to call u names cos thats what fit into this attitude and all ur intent is to cheat . U think by talking down on me will make any difference. I will use those degrading words as u are about the money without considering client satisfaction. The first thing u told me is send my balance or else i wont ship the doors without asking or trying to find solution. And i quickly sent u 50k balance owe to u , to let u know ur balance is no issue but the door u made is not Good . you loose counts of when you call someone degenerative names. I remember you were scolded here about such a week or two ago |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 8:47am On Aug 24, 2021 |
Enyinne: Bring chat where i insulted u and let me bring chat where u was practically talking down on me cos u hv collected money . I was specific of my demand and u issued invoice to that effect. Tellin me about choking the door hence u reduced the door . Did u discuss that with me ? Hv u seen the place where the door will be installed before? U made a one face design on ur own accord without sharing the information with me and same u are shorting the door size too ? What exactly did i pay 60k for if not to serve ur greediness . Come and pick up the doors and refund me . I'm not having this slide too . I bought 4Ft turkish door and 3 ft turkish doors all fit perfectly to my space and when measured it's exactly 3ft and plus . Oga i demand u pick up this door and refund me to whoever it pleases . What i paid for was 3ft door and no less you have continually called me a thief,cheat and other degenerative words without cause and yet you don't feel it's wrong. Wow |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 8:38am On Aug 24, 2021 |
Godisgreatest1: I'm still trying to understand how a 3ft door will fit exactly in a 3 feet space. I think either the space is broken above 3 feet or the size of the door is reduced 'slightly'.
I won't be expecting an exact 3ft door that will make me break walls just to accommodate a door. Also, I don't think 1.5" reduction is an obstruction to passage of furnitures. I had to read over and over again to be sure I saw the 1.5" clearly and other reasons for the complain. May God save us all. sir you won't understand. It wasn't that long that an engineer gave a client a measurement and I did same. Did the job to site and it couldn't fit. The engineer said I should have known better to reduce the sizes. In his words, "I should know better"
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 8:26am On Aug 24, 2021 |
megacontrol: When you are fabricating a steel or wooden door from scratch then it can and should be made to order. Simples. I don't about wooden doors but right now with the sizes of iron reducing daily with 12mm looking like 10mm, 3" pipes now 2.8", you can't make exactly 3ft doors without joining. Ask any welder around you. Rails, windows, standing tank and others are the jobs you can determine the sizes. Even H beans that used to be 40ft are now 37ft 10". You take it to site and you're scrutinized as if you are the one who cut off the rest. 18ft pipes are barely 17ft 6" now. I don't make these things, I just buy them just like everyone else 12 by 12 planks are now 9" and they're still called 12". T |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 8:17am On Aug 24, 2021 |
Eyinne, you said I defrauded and cheated you, the whole materials used on the job you haven't said they were inferior materials. If any fraud should happen, that's where |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 8:14am On Aug 24, 2021 |
Here's another reason doors are getting smaller in size, the whole pan aren't even in size, so we trim off areas thereby reducing the already small size.
Without doing it, the job will be uneven and welding becomes a problem
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 8:06am On Aug 24, 2021 |
Enyinne: I was very specific about my request. What price is 3ft door was my question and request and remember when u was sounding Rude to me on chat , i warned u about insulting me see attached screenshots You will never have peace in this forum until u sort out this door issue . U short the pan and still make a one side design and charged 60k . Maybe u think i dont know whats called value for money for u to cheat to this great extent. you're still my customer and you gave me your money. I don't want to bring chats here. It's ok to skip what you said to me over the phone and stuff. Measure that pan, it's 2ft which is the size of pan. Everything about the job I did according to our agreement. Say I cut off 3", what will it amount to? Am I going to make another door with 3". Say that the size of materials are reducing from the producers whilst price keeps increasing. I have been very detailed to you and asked you to get another anonymous welder to verify my claims. Go to your local market and measure the pans, they're 23.5". The manufacturers are creating all these issues while we the artisans answer the questions. To increase the size beyond what it currently is, I will add pipes in-between the doors and you won't like it. That's not alone, if I measure a job and it's 3ft,if I bring exactly same size to the place,it will never enter freely. You must break wall. 2-3" will never stop your household appliances. This is why I advise people to make all entry and exit points 4ft doors to avoid the issue of moving properties |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 11:45pm On Aug 23, 2021 |
Horlardorjah: Like u ought to add an inch or two to your windows or doors openings instead of reduction except confirmed on site otherwise.
Even for my Kobo Kobo interior works that I don't post here due to the drama with nairaland clients as I don't post even my architectural n construction here. Michlin, u r good no doubt. But u need to be more detailed and u need more wisdom in client management n relationship. Please I will say again, easy does it. The misfortune of one mostly leads to upgrade of another competitive n serious minded one as majority believes. I cum in peace oga mi I have tried my possible best to appease this woman. But she made it her ultimate goal to frustrate me. Someone who couldn't stop me from waking up now wants me stop me from getting my goals. Are you my God or what exactly are you |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 10:05pm On Aug 23, 2021 |
Ggee: It is wrong to say it is market standard. If in doubt ask the customer, you do not assume for the person.
What you two discussed is hidden from me and any potential customer. What we see is what we read here. Sir here's what I can assure you,if I tell you that this thing is white,go anywhere else, it's white. I didn't deceive her or anyone else |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 9:41pm On Aug 23, 2021 |
somehow: Did you tell her when you decided to deduct from the measurements she gave you?
Did she ask you to do any deduction?
Why are you giving yourself problems by assuming for people? please sir, that's how doors are made. Even the prefabricated doors are smaller. Here's how it goes. A sheet of pan is 8ft and when divided by four gives you 2ft plus 3" of the pipes. That's 30" then you add frames which is usually 1.5" on both sides. That's a total of 33". This is the way it works. If you want to expand the size, you will have to add pipes in-between to increase it. These things are like this anywhere and everywhere |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 9:23pm On Aug 23, 2021 |
Ggee: This is the second time this is coming up against you. The other time it has to do with windows not actual size quoted for. People are watching. It will do you good to resolve your issues with this client. The manner and tone of your response is very bad. sir I am a vendor here and still I am human who deserves a respect. If you take offense with my response and feel ok with her statement, I don't know what to say about it. She gave me a measurement saying she wants 7ft by 3ft. I deducted 3" from the measurements for the plastering. How on earth is this fraud? Go anywhere, this is the industrial standard. It has been discussed extensively here. She's quick to bring screenshots here. Do you know what she has said to me over the phone and how she has insulted me. Even a slave deserve a better treatment |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by michlins(m): 8:04pm On Aug 23, 2021 |
Enyinne: Michlin, what audacity ? The nonchalant and your carefree attitude is what baffles me . You said u cant help me ? I dont need help , what i demand is what rightfully belongs to me . Contracting u to do 3ft door is what i paid for and should be delivered but u chosed to shortchange me .You think coming to Nairaland to seek for jobs and pretend to know what ur doing but now it becoming clearer on ur intent to cheat ur client and fill up ur pocket. U don enter one chance cos i wont allow u rest on Nairaland until u sort me out as i wont allow any intending client fall for ur gimmicks so be ready like I said, I can't help you. You think you can stop my shine? |