UPDATE OK guys is long I made an update. Schedules has been really tight and lazy to update. Blockwork for foundation completed. We proceeded to hollow cast the blockholes with weak concrete mix of 1:8:8. Am actually using half inches granites. These affords me good workability as well as increase my concrete volumes thereby using less cement bags. Laterite filling also proceeded simultaneously. Then wetting before compaction. Pics attached
|
U also smash the relationship on the wall |
UPDATE We rounded up the casting of the foundation concrete today. We also begin setting out of the block work in foundation. Am using two masons for the forming and to Jack it up tomorrow God willing
|
Wait no this girl be that |
UPDATE We started the work proper with concrete footing, concrete in foundation using 1:2:4 mix. Although we used abridge site mix solid enough for the work.
|
To stay humble when someone suddenly hit money and stardom is difficult. And to cope with such person by the partner is same. |
UPDATE We started digging yesterday for the 8 plots and hoping to round up tomorrow God willing We are using manual diggers to reduce cost of digging, give back to the locals whom we are engaging as well as reduce cost of concrete work as manual digging dig to precision Picture attached
|
UPDATE After all back and front trying the best way the building can fit in perfectly, we finally got workable site plan attached and setting out commenced immediately
|
Life will through u everything to pull u down. U just have to strong and wither all |
mamagee3:Someone cannot jab u small again...? U probably smallish is status and she is just been funny |
So all the license miners had left cuz of insecurity. Who are now the Investors you are seeking their understanding. Oh, the illegal boys.? |
UPDATE OK guys. Bellow is the screenshot of the floor plan and Section of the proposed building Site clearing, leveling and removal of top soil also completed and picture attached. The site plan is not fitting in to the available land. Design was done without site visit. Setting out will be done as soon as we reconcile that with the project consultant
|
WilliamsChelster:U gat permission of those who are touching ba? |
Hi guys For the next few months I will be taking u guys through details process of construction of the above named project My details Name: moses Qualifications: ND building technology Auchi poly, BTech building FutmMinna, MSc Construction management ABU, Zaria Project Location: Kaduna Contract duration: 90days This thread is open to constructive criticism. Am geographically mobile and ready to avail my services and expertise to those who may need it. Am competent in the following areas ***General building and civil engineering Construction. (residential, commercial, industrial) ***drainage and culvert and mini damn constructions ***road maintenance, reconstruction and new constructions ***surveying, valuation of work and prep of estimates *** design and general consultancy Pls avoid quoting whole write ups while asking questions or commenting. Once more. Make ur criticism constructive and professionally Leggo guys Whatsapp +234-813-110-9592 U can also follow my other project through this link https://www.nairaland.com/5232258/construction-modern-mami-market#79120446 |
Chop of his dick or castrate him simple |
fairfora:Kwarans eye will soon clear. Lets see what abdulrahman will achieve. State with no viable opportunity and resources |
SageMK:Thunder kiss u there |
Once I ever asked. Told her point blank I want to Bleep her and if she won't allow me, she shouldn't allow me romance her. That was first time. Others, we play till the paint off and zoom into it |
thatigboman:That will be her graduation year OK. |
Make sure u fully get over her before u allow friendship otherwise, u will get insecure and hurt. |
Davash222:That dude cut his shirt to get that tag |
mysteriousman:That video will forever b in internet. Her unborn generation will even watch it. Life prison sentence is better |
Rural electrification is what they are achieving no matter how rural is the place. This ur country haven't achieve |
So 15 soldiers died Monday and not in any news. In otherwise, they will be buried like a dead dog. Nigeria their country |
First lesson will be how design are made or interpreted Some contract will specify the total drain length, total cubic meter of concrete and allow u to design for the drain sectional area. This is done when site condition will impact the construction and end product. While others you will be given the cross sectional area and u are allowed to determine the depth and width of the drain while maintaining a minimum thickness of the wall. In this case. A total cubic meter was given, total drain length and cross sectional area. The drain was agreed with the consultant team. Take for example you are given a drain length of 800m and cubic meter of 288m3 with a cross sectional area of 0.36m2 What this means is that for every 1 meter of drain there should be 0.36m3 of concrete when u multiply the cross section by 1m length. This means total cubic meter divide by total length will give u concrete requirement per length both for base and wall. Now we need thickness we can add together to give exactly 0.36m3 so as to exhaust all the quantities otherwise u won't be paid full. Now let's do the sharing let's assume a base of 1m and thickness of 0.15m including blinding and wall of 0.7m and thickness of 0.15m also. This will give Base (1*1*0.15) = 0.15m3 Wall (0.7*1*0.15)*2 = 0.21m3 Total. = 0.36m3 This is perfect design. With this we are sure of exhausting all cubic meter of concrete in the contract. Anything other than this will either mean under or over performance and u all know what that mean Pls not this doesn't correspond with the design shown. Like I said, the presence work have some privileged information I wouldn't shared cuz of privacy issues. With this I guess u guys can design when faced with similar challenges |
Like I earlier said. It is a RCC line drain of over half a kilometer. Proposed design is attached. I intentionally omit the exact location of work and other details cuz they are privileged information
|
Hi guys. Am a young man into construction works. Will be taking u guys along as I try finishing up the work. Before I go into details. Lemme introduce myself. Am by name Moses, a graduate of Building Auchi polytechnic and Futminna and recently rounded up my MSc in construction management from Ahmadu Bello university, Zaria. Am single and in my early 30s. Hope the young lads can learn one or two things from this. This thread is open to constructive criticism. Am geographically mobile and ready to avail my services and expertise to those who may need it. Am competent in the following areas ***General building and civil engineering Construction. (residential, commercial, industrial) ***drainage and culvert and mini damn constructions ***road maintenance, reconstruction and new constructions ***surveying, valuation of work and prep of estimates *** design and general consultancy Pls avoid quoting whole write ups while asking questions or commenting. Once more. Make ur criticism constructive and professionally Leggo guys |