Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 8:57am On Mar 23, 2021 |
oseiwe: Nice job. Powerful advert. I'll keep in touch Thanks bro |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 2:37pm On Mar 22, 2021 |
jeffdaniel: Noticed one thing though, your windows do not have window wood. Is it just the design, cost consideration or Any reason for that? Thanks for following us Actually it doesn’t add value to the cost of rent to this building so we add the money to the hand railing to have rugged wrought iron railings that will last the test of time. |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 10:12am On Mar 22, 2021 |
Watch out |
Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 9:20am On Mar 22, 2021 |
Pop ceiling progress update. More pics later today
|
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 9:18am On Mar 22, 2021 |
Mup4life: thnk you for just labour or with materials? Labour only You will buy material yourself |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 9:15am On Mar 22, 2021 |
More pics
Questions are welcome We never tired of that.
|
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 9:13am On Mar 22, 2021 |
kopell: lol, I don’t like when you keep us on I’m coming. His coming is slogan here, omo if you hear that odaro ni yin ooo. My OGA’s here we go with the current update of the work. -Pop done. -85pec electrical work done - 75pec tiling work done so far
|
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 10:54pm On Mar 21, 2021 |
Mup4life: Hello pls sir how much is charged for window hood? Size Location Design Determine the cost But let’s say big window range from 3-4K |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:19pm On Mar 21, 2021 |
KolaShangOne: Labour for precast Loool.
Like I always say, these baba Lati people charge x3 of what Engineers charge most times. I thought I’m the only one observing this o |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 5:43pm On Mar 21, 2021 |
kopell: lol, I don’t like when you keep us on I’m coming. His coming is slogan here, omo if you hear that odaro ni yin ooo. Lolz @“ o daro niyen”this my oga hennn. Actually I will post all the latest info update tomorrow |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 5:27pm On Mar 21, 2021 |
kopell: Coming son, coming son, on all your pages? you nerve no how many people waiting to see your finishing. Lolz, my OGA i will post the pics this new week sir |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 9:56am On Mar 21, 2021 |
All the wrought iron hand railing installation done. Pics coming soon |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 9:55am On Mar 21, 2021 |
Update coming soon |
Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 9:54am On Mar 21, 2021 |
Pop ceiling in progress |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 3:55pm On Mar 20, 2021 |
KolaShangOne: Bottom line..
1. House Design (flat roof etc)..
2. Site location (30tonnes granite in Lagos is about 200,000 plus, ibadan should be around 150k)
3. Building practices.
4. Type of finishing etc...
I know a man who spent just about 3million.
He dug sand from his site and used it to mould blocks. No columns. Cut palm tree for his roofing. Bought used pan to cover it.. etc etc.. 1-4 is the way to achieved cost in construction as you put it. We did same here. Bravo you. |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 3:53pm On Mar 20, 2021 |
EgunMogaji2: Oga KolaShangOne, our debate was based on N5M o 
We’re already not talking about average Joe home owner but it’s who wants to shelter his family for N5M and is ready to participate like our esteemed owner here.
So bottom line, one can save money in building starting from the design stages. You are right Boss. Cost of construction start from design stage. |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 3:52pm On Mar 20, 2021 |
EgunMogaji2: Okay Sir, I was just thinking that they would be vertical like in pic attached. Anyways, my way is not the only way 
A fantastic build, again thanks for sharing. Perfect, you have eagle eyes and full knowledge about welding work sir, I must say. That was the design at the beginning but the iron man did some positioning mistake then we turn it otherway. |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 6:36am On Mar 20, 2021 |
KolaShangOne: Oga Egunmogaji the village headmaster..
You have brought me here.. our ongoing debate.
Excellent cost saving but...
-He practically got the materials at a giveaway price. That's not gonna happen for everyone.
-The groundfloor is basically gallery-styled. No internal walls which means reduced cost. The building also has a width of 4m. Great for its purpose but not as a living house.
You see @rotech said 3.2million for the carcass now.. even with the factors listed above..
A hip roof will drag the budget to almost 4 million 
But not to discourage anyone wanting to build. Anything is possible so far as you cut your coat according to your cloth.
We finished a 3 bedroom carcass WITH PARAPET and 15FT HIP ROOF for about 3.6million last week. I won't post the pictures here.
Oga @rotech sorry for coming on the thread. Oga @Egunmogaji let's go rumble somewhere else..
I'm glad the 3m conversation is shifting to just carcass alone. Bear in mind you'd spend more for finishing.
That overruled our 3m for a standard bungalow debate  Good analysis from you sir. You got it all, cost of materials covered about 60-70 pec of construction cost once you have your way with this coupled with good construction methodology you are good to go. Let’s the conversation continue I want to gain more knowledge here |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 6:34am On Mar 20, 2021 |
EgunMogaji2: At those looking to build. Here’s a perfect example of what is possible. You don’t need no bloody N15M to build a 3 bedroom bungalow, a standard one.
I think that two of these can easily fit on a 50X100 plot or maybe 60X120. About N5M a piece or little more?
At a minimum 2 bedrooms can be cut out of this, maybe even 3 bedrooms though not all ensuite. Live in one and rent the other.
The steel staircase can be made from wood much cheaper. Bonus is that the space underneath could be visitors toilet or storage.
Congratulations to Oga Rotecch77 Yes,rightly said sir, when you get your materials at good rate coupled with moderate Labour cost then nothing more you will definitely arrived at low cost at the end. |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 6:28am On Mar 20, 2021 |
EgunMogaji2: Did the welder screw up the uprights or that’s what the owner wanted? The uprights are not at the correct angle.
In my opinion, a blemish on an otherwise fantastic project. OGA mi sir, thanks for your observation. The uprights is welded to the down H beam and again it’s also anchored in 2 places to the wall up there, I will post more pics late to see the anchored area. In addition , the top flat bar hand railing will be cover with furniture wood. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:27pm On Mar 19, 2021 |
twinskenny: nice one my oga...
smart home will fit this building o  Chief sir kenny You are right, I will see to it sir |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:59pm On Mar 19, 2021 |
topsy23: Nice one Engr Topsy Thanks so much |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:58pm On Mar 19, 2021 |
n3xt: Nice one @rotecch77
More wins to you! Amen Thanks chief |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 6:08pm On Mar 19, 2021 |
Let’s build this update/ cost.
A contemporary eatery design with pent. A story building consists of 6 flats.
What to expect - day to day activities pics update - cost per each stage - questions and answer about the project
Duration 180day ( for the eatery)
Arbo contractor Ltd ( rotech77)
Watch out for new thread for the project
|
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 4:31pm On Mar 19, 2021 |
Switch and socket fixed
|
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 11:00am On Mar 19, 2021 |
More update on the bakery
|
Properties › Re: Handlings Of Anambra Edifice By Rotech77 by rotecch77(op): 10:43am On Mar 19, 2021 |
Compound interlocking stone also in progress
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 10:26am On Mar 19, 2021 |
Clearing of site and site hoarding done New thread for the project coming soon
|
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 10:00am On Mar 19, 2021*. Modified: 10:21am On Mar 19, 2021 |
More Update will surface soon about this new project, Watch out for the new thread. |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 9:55pm On Mar 18, 2021 |
Update Coming soon |
Properties › Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(op): 9:21am On Mar 18, 2021 |
Let’s known your budget ... we have moderate building that can match your budget. For your massive construction work we are ready to give you mouth watering structure with good deal.
Team.. Arbo contractor Ltd.
Watch out for new project from us. |
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 6:59am On Mar 18, 2021 |
rotecch77: Preliminary work is in progress about this work Watch out! Clearing of the site / 150mm top soil remover done ) A thread will be created for this project soon Watch out !
|