Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 8:42am On Oct 22, 2020
More coming
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 4:33pm On Oct 21, 2020
Current situation of the country delayed today’s work ( Lagos curfew)
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op):
More clarification about the cost of this building to carcass level (2.5m )

-The block is mould here ( the Client has block industry so the block comes out cheaper )
- we are using 6” stone dust mixed block.
-The Client has a lorry, so our sharp sand do comes cheaper than regular supplier rate.
- Cement comes cheaper at the rate of 2500 per bag bcs the client buy in bulk, bcs he is a cement merchant too
-The site is a dry level firm land
And many more
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 5:04am On Oct 21, 2020
mufutau55:
Chief Kenny, the Bostonian Americana. smiley

Hajji M.
Yes o . Sir kenny is a Bostonian man ...lolz
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 6:22pm On Oct 20, 2020
twinskenny:
nice one my engr and good luck
Chief KENNY, thanks so much sir.
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 6:21pm On Oct 20, 2020
mufutau55:
Lobatan. I beg edit that thing o, before ppl started holding you responsible. Ride on sha, we dey follow.

Note: The steel stairs will be lovely.

Tell the owner to let us know this bakery when it's completed so we can patronize the shop, I love fresh hot baked bread direct from the oven. smiley

Hajji M.
Thanks for following as usual, this always motivates us sir.

Definitely the bakery will be unveiled when the time reach.
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 5:02pm On Oct 20, 2020
Gabrokpara001:
Are you sure of your quote, 2.5m won't get this to carcass
Thanks for your contribution sir.
We are not new into this, it’s been long
The said amount will take it to the said level without any additional kobo.
All materials are ready
Keep following sir
Thanks for your time here.

Some of our previous work link

https://www.nairaland.com/5377385/construction-8flats-4units-2bdrms-4

https://www.nairaland.com/5113925/finishing-osun-state-edifice-rotech77

https://www.nairaland.com/5216292/finishing-3-units-3bedrooms-holiday

https://www.nairaland.com/5113925/finishing-osun-state-edifice-rotech77
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 5:00pm On Oct 20, 2020
mufutau55:
Oga mi, 2.5m go finish this?

Hajji M.
The biggest of the OGA sir,
The 2.5m is for the carcass ONLY
From foundation to the roof.

We designed “Straight Flight STEEL stir ways” for this project

Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 3:23pm On Oct 20, 2020
More pics coming soon
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 1:53pm On Oct 20, 2020
Jumyg:
Following. Please is this land 30by 120
The land is 63*160
we carve-out the space for this structure from the total area of the land
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 1:47pm On Oct 20, 2020
Greenarrow01:
So the total build area is 54msq
So pls how big is the land.. I will be following this thread.
Pls do justice to how 2.5 million was enough for the building
This looks beautiful already sir.. great work you are doing
Thanks for your time here bro,
The 2.5m is for carcass ONLY
We peg down 1-1.5m for the top notch finishing
Properties › Re: Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op): 1:01pm On Oct 20, 2020
Prototype

More details
Mini Bakery; sales point, store,production rooms.
Office:reception,Toilet, 2 office space

Properties › Construction Of Mini Bakery/ Office Space By Rotech77 by rotecch77(op):
We gives to thanks to Almighty God for this new project we are about to start now and also, we really appreciate you people support so far, since the 1st day we registered here as a full member may God be with you all.

Simple introduction about the project

Construction of a simple narrow story building.
DETAILS
CONTRACTOR: Rotech(Arbo contractor Ltd)
STRUCTURE;A story building comprises of mini Bakery and offices space.
BUILD SPACE: 13.5m*4m
CLIENT; NL member
DURATION:55days
COST;2.5m
CONTACT; 08066619493

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:55am On Oct 19, 2020
twinskenny:
boston usa?
International work is ringing bell “ sir kenny go and dust your ”Palii “ alele” USA yaa”

When you get there you will enjoy
Good health system.
Education
Opportunities
Low crime rate
Etc

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:01pm On Oct 18, 2020
[quote author=kopell post=95070319]Hello rotecth I didn't see burglary on the windows, is it safe in the Nigerian environment?, or I did not have my glasses on to notice it?[/quote

The burglar bars are there sir, we fixed them after the plastering

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 3:38pm On Oct 18, 2020
mufutau55:
What could be the price for 4ftx4ft, 5ftx4ft, and 6ftx4ft?
That should cover the range except a custom made windows. Nice windows though. Thank you.

Hajji M.
4*5 price range 55-60k
4*4 price range 45-50k
6*4 price range 60-65k
All with Nigeria made Aluminum( towal)

From my fabricator
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 2:53pm On Oct 18, 2020
coldcandy:
How much will a 120cm by 150cm cost? Black glass, black frames.
I’m not a window fabricator, but my fabricator said btw 55-60k due to the cost of materials now
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 12:03pm On Oct 18, 2020
coldcandy:
Any fabricator of frameless casement windows here?
It’s not frameless window, it’s called “ cutting wall window” the frame used to fabricate this type of window is more bigger than regular casement window frame only that you will not noticed the Frame from outside.

We did same here for NL member sometimes ago.

Window size determine the cost

Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 9:55am On Oct 18, 2020
Watch out
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 6:24am On Oct 17, 2020
External plastering loading
Properties › Re: The Benin Kingdom Project By Rotech77 by rotecch77(op): 6:23am On Oct 17, 2020
Watch out !
Properties › Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(op): 6:22am On Oct 17, 2020
We are affordable
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:44am On Oct 16, 2020
EgunMogaji2:
Thank you Sir. You lead we follow.

It’s getting a built in outdoor cooking area for quick access to food grin
I love this outdoor kitchen setup
Properties › Re: Post your mechanical(plumbing)problem here and get quick solution to it . by rotecch77(op):
topsy23:
Boss, weldone sir. how is work? Hope you are keeping safe
Honourable colleague sir, we give thanks to God,
How your side?
Properties › Re: Post your mechanical(plumbing)problem here and get quick solution to it . by rotecch77(op): 8:37am On Oct 15, 2020
Still on
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 6:26am On Oct 15, 2020
Badgers14:
Someone asked me, painting before tiles or tiles before painting..

I don't remember the exact order I used.

I told him, it doesn't matter grin I hope I didn't lead him astray?
You didn’t lead him to astray
but you lead him to put on SARS uniform in the present of million of End SARS protesters....lolz
I Know you are joking bro...
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:43am On Oct 14, 2020
erico2k2:
ahah Bro only the ignorant Diasporant will abuse people back in 9ja. If U remember back b4 this thread when we were still on the old property thread myself and Egunmogaji where talking about machine in our designs how we gonna do this and that in our proposed builds. when time reach and we were in the ground story change. we now appreciate local knowledge more.
This is a valid argument
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 9:31am On Oct 13, 2020
More coming soon
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 9:28am On Oct 13, 2020
Watch out
Properties › Re: Special Project For Special Man "Hajj Mufutau" by rotecch77(op): 9:28am On Oct 13, 2020
08066619493
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:15am On Oct 12, 2020
kopell:
I believe the major reason why most of those buildings are coming down in opinion, is the compromise in the integrity of the structural Iron component, for example if structural engineer recommends 16mm rods for section of the building with his calculations of weight. When going to purchase materials I’ve seen many 9mm rods label as 12mm and the cost is clear, those are sold for N 1750 each, while the right one and full size of 12 mm is sold N 2,200. The owner have to make decision on which one to buy. l bet you many of them will go for the cheap ones. I don’t understand why the engineer will put his name in line to forge ahead to continue the project when he knew is going to be disaster at the end, just because he wants to make money. In conclusion I think it better for engineers to proper advise their clients the danger of trying to save thousands and end up wasting millions with and people lives.
Word
Properties › Re: Finishing Of 3 units of 3bedrooms Holiday Cottage For Diaspora Client by rotecch77(op): 9:15pm On Oct 11, 2020
Watch out for more