aghaibiam:You are very good to go with the said amount. Use Nigeria made Tiles for the project. - Use Nigeria made tiles size 60*60 for the sittingroom, dining/ any open lobby to the mentioned area. - Use Nigeria wall tiles for all the toilets wall from ground to the door level area ... size 25*40. -Also do same for the kitchen wall size 25*40 -Also Nigeria good floor tiles for all the toilet floor ( mom slippery type) size 30*30 - All rooms should be 40*40 floor tiles good grade also. Mixed plaster sand with cement at ratio 1:3 for the wall tiling. - |
Jumyg:Thank so much sir |
BIGGIE121:Thanks so much and well noted |
n3xt:Thanks bro, I really appreciate. |
Nero2424:I’m not a tiler but in our firm (Rotech building concept / Arbo Contractor Ltd ). We handle construction work/finishing work such as tiling, painting etc. Our charges are moderate. Few of our finishing work pics below You can also check the link below for more pics . https://www.nairaland.com/4269104/showcasing-finishings-work-i.etilingkitchen-setup 08066619493 call and whatzap
|
More coming |
The link to the new tread mentioned above. https://www.nairaland.com/6105469/construction-finishings-abeokuta-country-home |
Door fabrication in progress.....16doors entrance and exist only.
|
Work is in progress here |
Plastering loading... |
n3xt:Naa so bro |
EgunMogaji2:Yes those are the tools. Some of Nigeria artisan are too lazy |
EgunMogaji2:Same here. I have plan for this in my next project. I did something similar before, actually it’s very simple but there is a special tools for it Here is the tools
|
mufutau55:Thanks sir, more pics and cost will be uploaded |
Sample of master and madam bathroom feature appliances Pics
|
Master bedroom features are -Jacuzzi with steamer -shower glass enclosure -vanity basin -executive water closet - heater All piping work in progress
|
Watch out |
freezyprinzy:You are welcome |
More update coming |
mufutau55:You are highly welcome sir. The pillar is totally naa waaaah |
freezyprinzy:Budget btw 120-150k |
JustCryptos:Yes I have used more than 30pcs for project That i handled/ sales Mainly for toilet. Very durable. Made in Turkey
|
Plumbing, electrical, roof wood work, amendments all going on at the same time
|
mrsteel:Yes the client want something close to the 3D, reason why we are removing only one column from side A and B the remaining 2 columns is enough to carry the straight beam at the approach view. Then we will work on the others finishings area to looks close to the 3D ( tiling, painting, land scaping etc.
|
The 3D of the project. But the approach view is totally different to what is on Ground but we need to do some amendments To bring back something close to the 3D.
|
We gives thanks to Almighty God for this new project. Client ;Non Nairalander. Location; Ogun-state capital, Abeokuta. Duration:3months Cost; Client budget Contractor/ Builder: Rotech Building concept.aka (Arbo contractor Ltd). Contact; 08066619493. The listed below are the work to be carried out. 1.construction of gym house 2. Roofing 3. Remodeling of the frontage area. 4.Remodeling of the interior part such as master bedroom and toilet, kitchen, madam room 5. Electrical work 6.mechanical work (plumbing) Compound finishings (landscaping) 7. Plastering 9.pop 10. Others finishings to turn key stage(final stage). Note: The formal contractor didn’t follow the drawings in details, that is the reason of doing some amendments as I mentioned earlier *One of the frontage columns needs to be removed then the second one need to be in square shape. And many more. Follow us to see how we are going to perform the magic. Here are the past and present work. https://www.nairaland.com/5113925/finishing-osun-state-edifice-rotech77 https://www.nairaland.com/5613560/benin-kingdom-project-rotech77 https://www.nairaland.com/5377385/construction-4units-2bdrms-4-units https://www.nairaland.com/3851900/general-finishings-5bdrs-luxury-duplex https://www.nairaland.com/5216292/finishing-3-units-3bedrooms-holiday https://www.nairaland.com/4269104/showcasing-finishings-work-i.etilingkitchen-setup
|
n3xt:You are much more correct Actually it’s not compulsory to tiled all the wall both the wet and the dry area but at times when client want it tiled all round nothing you can do than to do so. I did this halve tiled about 5-6yrs ago for a member here and it’s looks nice. Not only him I have done many like that too. But this doesn’t fit some building o truly.
|
More coming |
wildchild1:Thanks Gadget guru |
DrGreen119:You are legit you just sold this for me |
freezyprinzy:Door size or opening size will determine the cost |
freezyprinzy:The cutting wall window then was 55k while the regular casement window was done for 32k then |