Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:28pm On Aug 21, 2020 |
n3xt: Though I do not intend to share my project pics on Nairaland but I’ll be glad to do so.
Sometimes it’s important to compare Apple with Apple.
I’ve never done roofing woodwork of any project on Nairaland with over 1 million naira. Wetin we dey build or buy �
Most times, it’s greed of the contractors that always drive up project cost.
Here’s something done with less 1 million naira. Let’s see any 1.5 million naira roofing woodwork and see if there’s any difference. Wetin the contractor wan buy � Good one from you but never say never oo Size of building determine the roof wood work cost which I believed you know that. I spent 1.3m for only wood on this project both cost of wood nail and logistic Capenter 200k Total 1.5m Although it’s bigger than your About 690 meters Stone quoted roof installation going on right now
|
Properties › Re: Please Nairalanders, Help Me Check This Quotation By An Engineer by rotecch77(m): 4:34pm On Aug 21, 2020*. Modified: 5:23pm On Aug 21, 2020 |
SEGLIZ: that this is on the high side I would repeat. his supervision fee might be responsible but truth he has placed the real cost as hiding changes that has being embedded in all other workmanship fee. this the more reason you see some people supervise their projects themselves. get a reasonable quantity surveyor to quantify the structural plan. after doing this run your price check of every material needed to know where to get the best at reasonable price. if the quantifier or valuer say, you'll be needing 6000 bricks, even if it is on the high you know you'll buy bit by bit, same goes for sand and other materials that would be given in quotation but would never be brought to site. you'll have supervise yourself. look for a good bricklayer with experience negotiate charges, don't negotiate daily payment with same but place him on contract. negotiating daily pay would only make things worse. he might charge 3000-3500 for himself and between 1500-2500 for his labours, this way they reap you off by wasting time (days) on the project as result of them extending their work days which would keep costing you more. but if on contract they don't waste time for they are running at lost spending more time on your project. if your material and finance can take you to lintel or roofing level you agree on what amount he would charge to finish up. the number of day they spent in working isn't your business any longer. you pay them in part (probably twice) then balance them on delivering. You spoke well, he can get another quotation or to negotiate how much he can pay But you get it TOTALLY WRONG by advising him to look for bricklayer to handle the job If problem occurred in nearest future or while construction is ongoing you will be the one to ask him to run down here to seek for professional advice. He knows the quality of structure he want before he engage the service of professional to handle the job. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:14am On Aug 21, 2020 |
ceelog: This is the most recent pic i could get. I think this is when it was fully installed about 2 years ago.
Nb: Only this side has the issue Casement window are fabricated to lap with the vertical, bottom and top frame, and I can see the it was done that way. Unlike sliding window which are fabricated to move inside the bottom and top railings which always have a gap in between the railing frame and the window leave, this always have hole to drain water away. Now since you have casement window the chance of water to drain into the inner part to the building is slim unless the window is not well fabricated. Likely causes of the problem (dampness) in that part of the building is the HOLES on the wall. Solution: go and patch up all the holes then let’s see the outcome result. |
Properties › Re: General Finishings Of 5bdrs luxury Duplex At Ajah Area For Nl Member By Rotech by rotecch77(op): 9:00am On Aug 21, 2020 |
EgunMogaji2: Oga mi, are you hands on or a coordinator? Nothing wrong with either but I need to know for future consideration. You did well here. I’m a builder by profession, i handle all my project with all my Workers I.e plumber, tiler, Capenter etc . Not only me I also have few professionals staff also in my firm. Thank so much sir, we are ready to handle your project at your convenient time sir. We have a registered name with CAC 1. Rotech building concept 2. Arbo contractor Ltd |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:52am On Aug 21, 2020 |
Abolarin91: Good morning sir, pls how do I get link for my thread, I am unable to get it right. Thanks Once you log in it will link you direct to your thread. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 6:24am On Aug 21, 2020 |
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 6:21am On Aug 21, 2020 |
Biztech05: Good innovation boss ! This nice and unique. Thanks bros |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 6:19am On Aug 21, 2020 |
n3xt: Very nice innovation. I used the same for my ongoing project.
It’s very cheap, fast and easy. It eliminates unnecessary wastage. Good,you a very correct. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:40pm On Aug 20, 2020 |
erico2k2: ahahahah how much/square metre do you charge including installation bro Western region we charge btw 3500-4000 Easter region btw 4200-4500 North central 4500-5000 Per linear meter, this cost covered below list. * Example 3-4 bedroom bungalow * -transport of the formwork to the site to and fro -installation -casting of the concrete - finishings dressing of the joints. Materials are as follows (separate cost) 7tns of sand 10tns of granite 30-35 bags of cement. 35 length of 12mm reinforcement 10 length of 8mm. “ Used 5ltrs of engine oil. 20 planks 1*12 ( for beam) 10 plank 2*3 |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 7:10pm On Aug 20, 2020 |
Our stone quoted roof material is now ready for installation
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:02pm On Aug 20, 2020 |
erico2k2: We might do business soon if U cover rivers as Im on that stage We cover that area too, except Sambisa forest |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 5:21pm On Aug 20, 2020 |
Mup4life: do you have a mould for this? No for now |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:03pm On Aug 20, 2020 |
Jalofun: I will call you sir
We give quotation for the materials and the installation separate Final cost is far cheaper as I said Ok sir |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 3:52pm On Aug 20, 2020 |
Jalofun: How much do you charge for this STEEL MOULD type of concrete facial  We give quotation for the materials and the installation separate Final cost is far cheaper as I said |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 3:49pm On Aug 20, 2020 |
Nettuno: And where are you located? Lagos but we work everywhere 08066619493 call and whatzap |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 1:07pm On Aug 20, 2020 |
Nettuno: Please experts in the house, help me look at this quotation for a parapet. The house is a bungalow of 66.5 meters: The quotation is a bit higher but not too much. But at rotech building concept We have another way of making this cast -in-situ Concrete facial VERY CHEAP now by using Already made STEEL MOULD this will eliminate the PLANK by 90pec bcs we will still use few plank for the round top BEAM. This will reduce your quotation by HALVE, YES and at the time taking to do it is also lesser To cap it all you don’t need to plaster the parapet again bcs the final process will comes out neat. Pics attached are the one we did for some Member here in diff location. We did it for the mini flat at the back of the duplex here in the pics
|
Properties › Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(op): 9:05pm On Aug 19, 2020 |
omanzo02: Rotecch77, Are different types of chippings/granites used for each of the methods described above? 1/2 granite is well suitable for the cast -in -situ and the semi cast -in -situ system |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 9:59pm On Aug 18, 2020 |
Stone coated roof loading ..... |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:45pm On Aug 17, 2020 |
JustCryptos: Please what's the roofing sheet used here? The chocolate roof is regular long span aluminum but of grade A” 0.45mm The second building is stone coated roof
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 3:52pm On Aug 17, 2020 |
davodyguy: Good afternoon all.
I need clarification on the attached image.
My supplier says this plaster sand is 'White' plaster sand and not red, hence demanding from me the price of 'white' plaster sand
Can someone please help to clarify this? The sand your posted can’t give you grey/white finishing as the one we did here. I got the supply from ogun state then for these two project. Check the pics of the one I got then.
|
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 8:59am On Aug 16, 2020 |
Dennis3D: Good work. Well done Thanks honorable colleague, how your side |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 7:31am On Aug 16, 2020 |
Still on |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 7:03am On Aug 16, 2020 |
Watch out for more update |
Properties › Re: The Benin Kingdom Project By Rotech77 by rotecch77(op): 7:03am On Aug 16, 2020 |
Why going far, we are here for you |
Properties › Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(op): 7:02am On Aug 16, 2020 |
We are affordable |
Properties › Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(op): 9:12pm On Aug 15, 2020 |
More coming |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 8:52pm On Aug 15, 2020*. Modified: 6:59am On Aug 16, 2020 |
chimexdnice1: Nice work. please what is the name of the type of wood you use for the roofing? Parapuru/Itara |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 8:50pm On Aug 15, 2020 |
kopell: Hello Rotec. I like to take you back a bit, if you don't mind can you share information like this from earth work to DPM and slab casting too Ok my lord, I will do that when time permit sir, Watch out for that and many more expenses so far |
Technology Market › Re: The Xiaomi Thread Store by rotecch77(m): 1:28pm On Aug 15, 2020 |
jboixxx: [color=#0000ff] Igemburg Repairpalng [/color] Thanks so much, I have called him |
Technology Market › Re: The Xiaomi Thread Store by rotecch77(m): 1:03pm On Aug 15, 2020 |
Hello Any redmi technician here, I need to do some repair. Urgently Check my signature for contact |
Properties › Re: The Benin Kingdom Project By Rotech77 by rotecch77(op): 8:35am On Aug 15, 2020 |
08066619493 |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 8:35am On Aug 15, 2020 |
More coming |