Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 2:28pm On Jun 13, 2020 |
abbeyboy2o15: ok should I call you or how would I set up delivery. Ok you can call |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 12:21pm On Jun 13, 2020 |
abbeyboy2o15: I need 3 like that in Ibadan. How would it be delivered. And is there any other accessories to buy with it. It only the shower head plus the short pole. 10k Delivery to Ibadan is btw 3-4K throughout public transport |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:22am On Jun 13, 2020 |
lastpage: Okay, there have been a few people in the last one week who have stated they need wood for deckings and the price is visibly high. My suggestion is: why cant you guys band together and contribute money to buy enough wood and then use it, one after the other?
Lets say each persons need of wood will cost 500K. Contribute #250K each (totalling 750K) and buy EXCESS WOOD of 600K. Keep #150K as "Float" Money, to be returned if there is no use for it You can even decide to buy Marine Plywood, instead of 1 x 12 Planks
Mr A will start and use with minimal damage but whatever is not useable after his use, will be replenished with the excess from the #100K. Then the Woods are removed and Mr. B uses it and the process is repeated? If there is need to buy more wood, the FLOAT money will be used to buy it. Finally, Mr. C will also go through the same process. If Money is left, you all share it equally. At the end of the day, all of you have achieved your desires and saved #250K each, minimum. It can be done if everyone is honest and not greedy, not selfish.
Its just an idea that l think may work.
Lastpage! This is a GOOD idea to save cost ONLY if. Mr A,B,C sites are close to each other if not -Cost of logistic. -Cost or removing it. -Time wasted ; the time Mr A will take to Setup the wood ( formwork) this will take like 2weeks plus the time the plank will stayed for the concrete to dry 28days Total 1month 2 weeks for only Mr A, same to Mr B to mr C this will take much time and the wood will weak before it will reach Mr C. Only if the last person will use it as lintel work or others non heavy work like decking -Mishandling;Diff carpenters to handle the installation and removal this will also reduced the number of the woods like 5/10pec off. Size of the slab: users size of the slab will also contribute to the loose of some plank bcs some plank length will be cut to fit some area in Mr A site which will a shortage length in Mr B site. At the end some of completing Mr B site some plank will be wasted |
Properties › Re: Best Of Price On Tiles,water Closet,pipes And Fitting Free Home Delivery by rotecch77(m): 6:22pm On Jun 12, 2020 |
Still available |
Properties › Re: Free Leakage Test On Any Building Both Old And Ongoing Project By Rotecch77 by rotecch77(op): 5:47pm On Jun 12, 2020 |
Dennis3D: Nice one. E be like say I go apply for my project at Lakowe o o. What do you think Yes it’s good so that you will know if there is any leakage before tiling and others finishings comes up |
Properties › Re: Biogas/bio Toilet And Bio-digester Toilet System By Rotech77 by rotecch77(op): 5:46pm On Jun 12, 2020 |
Dennis3D: Why does one need Biogas System then. For FREE Cooking GAS |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 10:01pm On Jun 11, 2020 |
Watch out for our new thread ! BASICALLY ONLY ON FABULOUS BUILDING DESIGNS AND LIKELY FRIENDLY CONSTRUCTION COST OF EACH DESIGN POSTED |
Properties › Re: Finishing Of 3 units of 3bedrooms Holiday Cottage For Diaspora Client by rotecch77(op): 9:55pm On Jun 11, 2020 |
More coming |
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 9:55pm On Jun 11, 2020 |
Loading |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:40pm On Jun 11, 2020 |
gabbytabby: If they let you see the wood you are renting before hand for 100k all well and good otherwise they will collect 100k from you and spend the next 4plus weeks trying to gather the wood together.
Most times me I do not have 4-6 weeks to spare and I spend about 300k sell some for 60-80k and use the others for Iintel and what not. You and Hajji mufutau are very correct ma, To get that number of wood to rent YOU MUST make sure the person bring the plank to the site before payment oo ,based on diff experience I get on this work if not what happened in 1888 will repeated itself o. What i do mostly now is that i do buy wood and sell it off immediately after the decking,but i will leave little quantities for the lintels. O parri o , this usually safe me from unnecessary argument with some fellas in the name of renting wood this days. Unless if its just small woods for urgent work. |
Properties › Re: Construction Of 3bdrs Cottage structure By Rotecch. by rotecch77(op): 9:13pm On Jun 10, 2020 |
We are much available to handle yours |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:09pm On Jun 10, 2020 |
omanzo02: This electric water heater has been in use in Europe about 2013, it's portable, flat and very efficient, I wonder if it's already available in Nigeria? The water heater is available here in Nigeria for some yrs back ..YES It’s called INSTANT WATER HEATER, I supplied some members and also installed some for members here too. The issue with the heater here mostly is non availability of light bcs ones their is NO light it’s means NO hot water. The heater doesn’t retain water (tankless)
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 9:02pm On Jun 10, 2020 |
|
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 8:56pm On Jun 09, 2020 |
Coming soon |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 8:54pm On Jun 09, 2020 |
Muyi002: No vex say i fall your hand. But you know that the one who seeks the road usually doesnt get lost.
He is the carpenter that has been handling the work from the beginning and at a point when i wanted to do the Parapet, his bill for woods and workmanship was almost 380k and i had to change to another whose cost was 200k.
I actually wanted to compensate him with this job and that was why i called him. the other guy had charged 120k for the wood work and roof with almost same quotations of materials but i was thinking he will charge less but he wan mess up. Ok I get the reason why now |
Properties › Re: Finishing Of 3 units of 3bedrooms Holiday Cottage For Diaspora Client by rotecch77(op): 8:40pm On Jun 09, 2020 |
chimexdnice1: I admire this type of your iron burglary  Thanks chief |
Properties › Re: Finishing Of 3 units of 3bedrooms Holiday Cottage For Diaspora Client by rotecch77(op): 8:40pm On Jun 09, 2020 |
chimexdnice1: Hello, pls this window units shown in the pics,was it made with the burglarproof or without it? what do you recommend? It’s separate windows with separate burglar bars |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:27am On Jun 09, 2020 |
Muyi002: Please how is good to plaster a 4 bedroom flat in and out all ensuite.
My bricklayer is saying 480k. I think this is too much or what do you think. OGA muyi002, you are old member here nna, But you fall my hand o, when you have member here that can handle this for you at reasonable price. Me as builder( contractor) with 300-350k I will get this done, no crime in this if I advertised my work to you and to others member( Almighty coca-cola, Pepsi etc still do advert) No money or work is too small o Seriously some mason do charge more than some professionals this days , this for plastering of 4bedrooms flats ? it just too much no matter the location and the size of the 4bedroom ( I knew it’s not 4bedroom king palace design). The roof charges is much also something in region of 120-180 is enough for all |
Properties › Re: The Finishing Of Osun State Edifice By Rotech77 by rotecch77(op): 7:51pm On Jun 07, 2020 |
More coming soon |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:15pm On Jun 07, 2020 |
fabulous85: hello guys pls what quantity of solignum, kerosine and black oil is needed to treat about 1000 pieces of 2 by 4 wood thanks The best practice and advise is to use only original Solignum endorsed by NIOB. (The Nigerian Institute of Building) To get good result DON’T mixed it with any other substances like kerosene, water, black oil etc. Then use praying apparatus/equipment to do the application, this will safe you a lot. With this,4 gallons will be enough for the job. I usually undergo same procedure in most of my projects
|
Properties › Re: Construction Of 8flats, 4units Of 2bdrms /4 Units Of Mini Flats By Rotecch77 by rotecch77(op): 6:50pm On Jun 07, 2020 |
Concrete facia loading Watch out! |
Properties › Re: The Benin Kingdom Project By Rotech77 by rotecch77(op): 6:49pm On Jun 07, 2020 |
We are here for you |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 6:47pm On Jun 07, 2020 |
We are affordable when it’s comes to charges, you don’t need to break bank before you can get all these finishings/construction from Rotech Building Concept Call on us and see the diff” 08066619493 call and whatzap |
Properties › Re: Complete Package Design Drawing For Mech, Elect & Plumbing(MEP) with COREN Seal by rotecch77(m): 11:31am On Jun 06, 2020 |
topsy23: I thank God for another successful 365days in my life.
I wish myself happy birthday. Happy birthday, I wish you long life and prosperity |
Properties › Re: How Good Is MDF Wood For.making Wardrobe? by rotecch77(m): 8:50pm On Jun 05, 2020 |
kenazuu: Dear professionals, please am.thinking of making wardrobe but considering the kind of wood to be used.
How good is MDF for making wardrobe.
Though I am not a fan of MDF or HDF. I love good wood but the carpinter might not get it well.with wood.
Thanks. Boss longest time sir, thanks for your patronages Now to your question Real wood is the best for the person that loves real natural finishings feelings, but most of our furniture man are just too lazy to work with wood to bring out the best of natural God gift to the mankind from the wood now. Now artificial wood finishings has taken over I.e MDF, HDF ,Particleboard etc. MDF; medium density fiberboard: / particle board: this is cheaper than HDF sold around 6k-7k per board of 4*8ft it comes in various colors but ITS NOT STRONG like HDF It’s good for office furniture and few house furnitures like table, wardrobe where water and heavy usage are not required due to its Nature. HDF; High Density fiberboard, this type of board sold around 11-12k per board 4*8ft, this type is very strong than others type of modern board due to its nature. It’s good for both indoor and outdoor furniture work such as. Doors, Kitchen cabinet Wardrobe Chairs Table Tv shelves Dining table set Etc. |
Properties › Re: General Finishings Of 5bdrs luxury Duplex At Ajah Area For Nl Member By Rotech by rotecch77(op): 6:14pm On Jun 05, 2020 |
Spend your hard earn money wisely, let’s handle your project, while you only just needs to relaxed and watch how your money is working for you with rest of mind. |
Properties › Re: General Finishings Of 5bdrs luxury Duplex At Ajah Area For Nl Member By Rotech by rotecch77(op): 8:42am On Jun 04, 2020 |
|
Properties › Re: General Finishings Of 5bdrs luxury Duplex At Ajah Area For Nl Member By Rotech by rotecch77(op): 12:23pm On Jun 03, 2020 |
Victornezzar: What's the cost region of this wonderful edifice Location and soil conditions determine But this type of building will cost you around 14-18m for the carcass only Finishings will depends on client financial capability |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 11:41am On Jun 03, 2020 |
|
Properties › Re: General Finishings Of 5bdrs luxury Duplex At Ajah Area For Nl Member By Rotech by rotecch77(op): 8:56pm On Jun 02, 2020 |
Victornezzar: Nice one boss 
This is a masterpiece Thanks man, I really appreciate |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 8:54pm On Jun 02, 2020 |
9africa: I sent you an email regarding shower cubicle,yet to get a response I have checked my mail I can’t find the main body of the message |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 6:27pm On Jun 02, 2020 |
we care for our client |