Properties › Re: The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu by spyder880(op): 1:53pm On Jun 29, 2023 |
Pictures from the roofing of this house today.............
This roofing should finish by tomorrow.
|
Properties › Re: Estimates For Construction Of A 3 Bedroom Contemporary Bungalow In Rural Enugu by spyder880(op): 9:56am On Jun 29, 2023 |
Preparing for the finish of this building............. |
Properties › Re: The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu by spyder880(op): 9:55am On Jun 29, 2023 |
The roofing tiles of this house is almost completed. More pictures from this site today. |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 9:54am On Jun 29, 2023 |
We are already preparing to lay blocks for the second floor of this house. More pictures later. |
Properties › Re: How We Built The Block Of Lock-up Shops In Enugu by spyder880(op): 9:52am On Jun 29, 2023 |
The roofing of this house has been completed, more pictures later. |
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 9:51am On Jun 29, 2023 |
We have started the decking of this house since yesterday. Decking wood works ongoing now.
More pictures later. |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:39pm On Jun 28, 2023 |
Closer on the walls..........
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:36pm On Jun 28, 2023 |
Inside the compound............
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 6:32pm On Jun 28, 2023 |
The house as seen from outside...........
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 3:05pm On Jun 28, 2023*. Modified: 6:30pm On Jun 28, 2023 |
Concrete cast of the staircase and some parts of the decking..............
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 3:22pm On Jun 27, 2023 |
We have started the full concrete cast of this decking slab................ |
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 3:20pm On Jun 27, 2023 |
As seen from the top ...........
|
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 3:18pm On Jun 27, 2023 |
Rooms being done..........
|
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 3:14pm On Jun 27, 2023 |
Inside the ongoing building..........
The main living room under construction.
|
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 3:11pm On Jun 27, 2023 |
More pictures from around the house............
|
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 3:09pm On Jun 27, 2023 |
Day 45................
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 5:27am On Jun 27, 2023 |
|
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 4:53pm On Jun 26, 2023 |
Getting ready for the decking of this house after 45 days, let's move on with more speed. |
Properties › Re: How We Built The Block Of Lock-up Shops In Enugu by spyder880(op): 4:52pm On Jun 26, 2023 |
This building is ready for a roof. |
Properties › Re: How We Built The Block Of Lock-up Shops In Enugu by spyder880(op): 4:49pm On Jun 26, 2023 |
Updates from this our site today...........
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 4:45pm On Jun 26, 2023 |
Akerewe: C/c 60mm (less then 3 inches) as how, what am seeing on this slab is more than 60mm. May b am not getting u right!
150mm thickness is the standard!
Pls can u recommend a nice local iron Rod nd it's price for me nd the brand also You were asking about slab reinforcement and the CC, in a typical slab with projected thickness of 150mm, when you remove the 12mm rods, and the possibility of some lapping in some crossed areas, you will have about 120mm of concrete left, I usually plan to have about 60mm top and 60mm bottom. The bottom part is usually easier, I can use concrete biscuits to prop up the decking mat, but the top CC is trickier as we must navigate to ensure that adequate spread is made so that the CC plan will be achieved. B/w, 3 inches you mentioned is 75mm, not 60mm.
|
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 4:01pm On Jun 26, 2023*. Modified: 5:26am On Jun 27, 2023 |
Akerewe: Pls what is the c/c spacing on this slab?? What type of iron is the best recently for slab either TMT/ LOCAL We have our CC for this slab set at 60mm. The slab is a total of 150mm thickness. As for reinforcement rods, TMT is very cool, but there are standard gauges from most local companies these days after the FG improved the standard of rods late last year.
|
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 3:56pm On Jun 26, 2023 |
val15: Oga spyder, Please is American panel door a strong door for residential or commercial housesl No, American panel doors are for low budget buildings where money is an issue, but that doesn'tmean that a lot of people are not using it now. If I have my way, I will always buy more durable doors. |
Properties › Re: The Posh 6 Flats Of 3 Bedrooms Block Of Flats In Enugu, The Construction Process by spyder880(op): 8:16am On Jun 26, 2023 |
val15: Good work Thank you. |
Properties › Re: How To build A 6 Bedrooms Duplex In 5 Months, The Fight For Timely Delivery. by spyder880(op): 8:09am On Jun 26, 2023 |
Ground floor walls almost all done, as we race for time..........
|
Properties › Re: The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu by spyder880(op): 11:58am On Jun 24, 2023 |
Ready to roof...........
|
Properties › Re: The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu by spyder880(op): 11:54am On Jun 24, 2023 |
Showing the completed roofing from other angles.............
|
Properties › Re: The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu by spyder880(op): 11:50am On Jun 24, 2023 |
Showing the pictures of the completed roofing wood works in this building..............
|
Properties › Re: The Making Of The " Asaba Block Of 6 Flats Of 2 Bedrooms" by spyder880(op): 7:54pm On Jun 23, 2023 |
Gen2men: Sir can you estimate the total bags of cement it took to complete this build including plastering. About 1200 or thereabouts. |
Properties › Re: The Making Of The "Captivating" 5 Bedrooms Duplex In Enugu by spyder880(op): 11:16am On Jun 23, 2023 |
Let's go and roof this house...........
Thunder protection equipment also to be installed today.....
|
Properties › Re: How We Built The New 3 Bedrooms Bungalow In Anambra State by spyder880(op): 3:38pm On Jun 22, 2023 |
fucc12: I don’t believe It was tough, but we managed to do it. |
Properties › Re: The Making Of The Asaba "Stepped" Block Of 6 Flats Of 2 Bedrooms by spyder880(op): 9:09am On Jun 22, 2023 |
Around the double stairs...........
|