PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 8:19am On Jun 16, 2021
You did not give me the direct contact of the distributor you only said you can give me his contact which i rejected immediately because i dont have any business with any distributor as i did not negotiate and pay to any distributor and you did not made mention of any distributor during negotiation and payment. So why are you bringing in the issue of distributor when it is time for you to refund me.

Do you know the delays/setback you have caused to my project with this your attitude.

Chekitaut:
bold letters: I am expecting refund of ₦2,160,000 from the major distributor till now, I made 1st batch delivery of 300bags from a friend order to him so not to delay work. I gave him direct contact to distributor he said no that is best he pass tru me that he did not know the person he knows me.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 8:08am On Jun 16, 2021
Thanks N3xt, below are my responses to narration;



1. 600 bags of cement (Lafarge) ordered 3 weeks ago

Yes i spoke with him on Wednesday 26th MAY that i needed 600 bags of Lafarge cement to be used for the plastering of my ongoing house project, and we agreed on 3600/bag delivery to site. He requested for full payment upfront which i said no problem due to trust, I made the payment the second day Thursday 27th MAY and he promised to deliver the cement (600 BAGS) on or before Monday 31st MAY. Herecomes 31st MAY he failed to deliver the cement and he started with excuses not until Thursday 3rd June before he was able to deliver 300 bags. I asked him i can see only 300 bags here and he said yes that he will deliver the remaining 300 bags the next day. I called him 3 days after the first delivery and he keeps telling me i will deliver tomorrow everytime, INFACT HE HAS TOLD ME ON TWO DIFFERENT TIMES THAT HE IS CURRENTLY DOING TRANSLOADING THAT HE WILL SOON REACH MY SITE BUT ATLAST IT WAS ALL LIES AS NO DELIVERY WAS MADE. THERE WAS A DAY I STILL CALLED HIM ABOUT THE DELIVERY HE TOLD ME HE WILL CALL ME BACK THAT THE GUYS SHOULD BE ON THERE WAY TO MY SITE FOR DELIVERY BUT I CANT SEE ANYTHING. So when i discovered that he was just playing on my intelligent regarding the delivery then i told him to refund me which he promised he will do the following but guess what he started story again and brought the issue of one distributor or the other which he did not tell me before he collected money. HE HAS PROMISED ME SEVERALLY THAT HE WILL PAY ME ON A PARTICULAR DATE BUT ALL TURNED OUT TO BE LIE.

2. Due to accessibility issue, the cement was delivered in batches. First batch 300 bags was delivered.
NB: He didn’t tell me you had an agreement to do it this way.


There is no where he made mention/we agreed of delivering the cement in batches. Regarding the site accessibility, this is just an excuse from him, he knows my site very well because he has delivered granite for me in the past and i still remind him not to bring long truck to my site because long truck can only enter the estate but can not enter my street inside the estate. Infact the first 30tons granite he brought for me he had to dump the granite at the entrance of my street which is like six houses to my site in the street because the truck is long. He then used the HOWO 30tons for second delivery which he dump to my site directly.

3. The 2nd installment was expected from a delivery made to another distributor he joined with to lift a truck.
However, due to the cost of transloading the cement he couldn’t take the cement. The truck was charging extra N250/bag from Ewekoro.


Reason why i said he is a liar, please ask him if he tells me anything about any distributor when we are negotiating, and when he requested for upfront payment, then why bringing in distributor issue when it is time to refund me.

4. The total amount involved in this transaction is N2,160,000. Breakdown below:

- Cost per bag = N3,600
- Cost of 300 bags delivered = N1,080,000
- Cost of 300 bags undelivered = N1,080,000
- Total Amount refunded so far = N700,000
This was made in 2 installments (N500k and N200k).

- Outstanding Balance = N380,000

YES VERY TRUE

5. He’s expecting the balance from the cement distributor he’s partnering on this and promised to pay back within the week.

I’ll plead with you to allow some time to sort this out. I’m in the same business and I can tell you cement ordering these days is a huge risk.
He didn’t deny the transaction. I hope you can give him a little more time to find an amicable resolve.

Seriously i didnt expect him to attach my payment to any distributor as no any distributor was made mention during negotiation and payment, it is when it is time for refund that he brought in distributor. Therefore, I have no business with any distributor. Since he has promised to pay within the week no problem the week is coming to an end, but he has promised me severally but still default. Hopefully this time he will fulfil his promise.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 9:50pm On Jun 15, 2021
Yes bros, I don’t like calling out people on public forum like this one because it’s not part of me but I have been patient enough with Chekitaut. And I think the only language he understands now is to call him out.

[quote author=n3xt post=102764492][/quote]
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 9:15pm On Jun 15, 2021
Better you right your wrong now before I start with details here and every other places (online &offline) which I have been trying to avoid. I still give you till tomorrow else?
NOTE: Mediators (Egunmogaji, N3xt etc) in the house please talk to Chekitaut before I start the matter from here, he understands the matter. Thanks


Chekitaut:
30tons Sharp Sand
Lagos, Nigeria.
@₦120,000(Odo Ogun)
@₦110,000(Lagos Sand)
Lekki Ajah @₦90,000

30tons Granite
Lagos, Nigeria
@₦230,000
PropertiesRe: POP DESIGN & TV WALL INSTALLATION by Thenext: 7:21am On Jun 14, 2021
Nice one, do you charge per sqm or how is your charge like? And which is more costly between pop ceiling and plasterboard ceiling?

bolu1986:
More more plaster board
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 8:02pm On Jun 13, 2021
[quote author=BiigTee post=102690796][/quote]My Engr. charge is 10%(cost of materials and labour) and I am always glad to pay it him as he is up to the task. I don’t go for cheap, I will rather wait till I have money that will be enough to get each stage of my project done than to engage cheap Engr. and labour.
PropertiesRe: Interior Design Project by Thenext: 6:39pm On Jun 13, 2021
Do you do plasterboard ceiling? If yes please can you post your previous ceiling here? And how do you charge for it?
PropertiesRe: POP DESIGN & TV WALL INSTALLATION by Thenext: 6:35pm On Jun 13, 2021
Do you do plasterboard ceiling? And if yes please can you post any of your previous plasterboard ceiling here?
PropertiesRe: Roofing Sheets: The Cost Of Various Types Of Roofing Sheet In Nigeria by Thenext: 5:13pm On Jun 07, 2021
How much is your longspan 0.55mm now?
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 6:11pm On Jun 05, 2021
Please how much is 30tons of plastering sand in Lagos(mainland)?
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 7:49am On Jun 03, 2021
KolaShangOne:
Alot of factors are involved though. Size of buildings, the "quantity of walls", quantity of concrete to chisel etc..

For this job, any competent work man will charge at least 1 million. Most likely more than that.
Alright sir, thank you.

All contributions appreciated, at least I have the idea now of what to expect
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 7:48am On Jun 03, 2021
UC92:
Your workmen must be big guys.
I think 600-700k can comfortably do the job.
Thank you sir.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 7:48am On Jun 03, 2021
n3xt:
I really can’t say as this depends largely on many factors but I’d set aside 800k - N1m as labour charge for it.

I pay my guys something within that range.

_____

Edit:

Thank you sir
Sorry I’m just seeing the 4 bedroom duplex part. I think you should be prepared to pay more but not more than 1.5m though.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 9:39am On Jun 02, 2021
n3xt:
This is laughable though!

We ain’t struggling to win over mega-deals within our first 6 month of existence and you think this would.

It might be a good time to roll out some of the amazing projects happening lately on that platform - kobocity.


@n3xt please leave all this people alone, we are your follower both on nairaland and kobocity. Me personally I have benefited alots from your posts. Thanks

_________
My name is Brabus.

I build systems, link people and guide execution. I hate dramas.

_________
Pic - The Nonuplets by NextHome
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 9:34am On Jun 02, 2021
spyder880:
When you get to the plastering of a house, many things are involved. The plastering charge is usually skill based, the more the skills, the more the charge. Another thing to consider is the scope of the plastering work planned. Is is the plastering of walls only or plastering with dressing of all corners, window dressing, door dressing, designs on walls, belts etc?
Just wall plastering and windows dressing only. For the skill, the bricklayer is highly skilled. I just want to have idea so as to help me in negotiation. Thank you sir
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 9:23am On Jun 02, 2021
Ogas in the house, please like how much is considered a fair price for the bricklayer charge for plastering of 4bedroom duplex(all en-suite) with 2 units of semi detached 3 bedroom flat(all en-suite)here in Lagos.
CC n3xt, Kolashangone, Spyder880, Egunmogaji etc
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 9:36am On May 30, 2021
Thanks @money121

money121:
Note price not stable
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 7:53am On May 30, 2021
House please whats the current price of a long span aluminium roofing sheet?

CC Money121, Nx3t etc
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 8:11am On May 28, 2021
Yes it has been sorted out since Rockofagesaluminium said he can do it for 3m which means 3.09m is not too high, so I decided to give it to the person that gave the qoute.

Thank you and appreciate

hslbroker2:
@thenext have u sorted these, if not let us know
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 3:23pm On May 23, 2021
Alright baba thanks
n3xt:
I really can’t say much on this baba.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 3:21pm On May 23, 2021
Thanks brotherly

RockOfAgesAlumi:
Good afternoon boss with quotation am looking at the person is till on the line but if you don't mind I can receive that with BUGLARY at the rate of 3m
While without BUGLARY is 2.450
Please where is the location of the site and if you need sample of work done chart with me on whatsAPP to discuss better 08069609983
Thanks
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 1:28pm On May 23, 2021
Oga’s in the house, please can you help me review the quotation below for my windows both with burglary embedded and without burglary.
CC n3xt,michilins, hslbroker etc

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 7:59am On May 21, 2021
But how about reptiles entering the house via the gate.

EgunMogaji2:
I love my see through gate. I’ll personally never have another non see through gate again.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 6:28pm On May 19, 2021
Lol � thank you sir.

n3xt:
Mushin. grin
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 6:13pm On May 19, 2021
@n3xt, please aside from mushin where can one get affordable and durable doors in Lagos?
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 6:09pm On May 19, 2021
Ok, thanks. 1, 2 & 3 above are they wooden or hdf doors?

n3xt:
Call Alade +234 802 301 9008

You can equally ask him to make a custom design for you.

There are several guys there making good doors in Mushin.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 5:48pm On May 19, 2021
Ok, please how can I get the address of the market in Mushin. Thanks

n3xt:
They’re locally made doors from Mushin. Take a visit to the market and get some more beautiful designs.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 5:35pm On May 19, 2021
Please were these doors made in Mushin or they were imported and sold in Mushin?

n3xt:
1 & 2 = 55,000
3 = 45,000
4 = 58,000

Cost excludes key/lock, hinges and installation.


________
I’m not a seller though
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 9:06pm On May 04, 2021
Thank you Oga spyder.

spyder880:
It's the very sa6m amount, BUT

You will have to pay those lifting blocks to take the blocks upstairs and drop for the masons and their boys to use and work upstairs. So the extra charge you will pay is just for block lifting.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 3:25pm On May 04, 2021
Ogas in the house, please is it the same amount bricklayers used to charge for blockwork for ground floor and first floor? Or the first floor is a little higher than ground floor?
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 9:28pm On Feb 16, 2021
Are you into installation of sachet water (pure water) purification set up?


rotecch77:
If your water salinity is <750 electrical conductivity test) mean it’s class 2 which is medium salinity.

Reverse osmosis (ozone) with 4-6 membrane with full set of fiber plant will solve the problem
This will cost you btw 1.5- 2.5m
Full setup
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 8:36pm On Jan 12, 2021
How about Ipaja sir?


n3xt:
Are you ready as in right now?

If yes, it can be delivered to you between 2900 - 3000 around sango otta area direct from a Lafarge distributor.


_________
Anyone in need of cement direct from Lafarge around Ijebu Ode/Sagamu/Ogijo can get in touch with me.