Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 9:23am On Jan 06, 2021 |
I would like to give feedback on my transaction with mountmoriah regarding the woods i bought from him yesterday. I saw his post here on nairaland that he is into wood business, lo and behold his post came at the right time that i needed to make a final decision on who to supply me my decking woods. I contacted him via whatsapp and he responded within a seconds and we finalised the deal within 30 miunutes. I linked him with my Engr. for further discussions and both agreed to go on with supply within 5 minutes. Mountmoriah supplied my Engr with 1by12(600 pieces) and 2by3(300 pieces) the following day, the woods are very good and very complete. Mountmoriah has been one of the best supplier (if not best) in term of responds to customers and sticking to agreement. Please kindly patronize him for your wood supply |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 5:34pm On Jan 05, 2021 |
Ipaja megacontrol: Where is your site @?
Where we need it is @ Ikate. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 5:05pm On Jan 05, 2021 |
Let’s work this out, I need 8tons. megacontrol: I just did a drive round town today doing market survey on this.
Local = 250k - 260k (depending on distance)
Tiger TMT = 305k
HiTech TMT = 310k
How many tonnes are you looking to buy and where is your site? I am currently speaking to other builders around me if we could consolidate our orders and load directory from the factory in Ikorodu. I am sure we can get them to bulge with a 15T order though they normally set ~20T ish as minimum. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 6:14pm On Jan 04, 2021 |
4 bedrooms duplex with 3 bedrooms semi detached. The building size is around 330sqm. n3xt: What’s the size of the building where you use 5200 blocks?
#justasking
I recently did foundation of 6 units of 2 bedroom semidetached bungalow and we only use 7,000 blocks for all.
We use 410 bags of cement for all the building.
______ Note: we didn’t do raft foundation o |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 4:57pm On Jan 04, 2021 |
I think this is somehow high. I did block work from German floor to decking level last 2 weeks and all what your baba lati listed cost me 450k which I was even thinking it was in the high side. Note: Total number of blocks(9 inch) was 5200. BuildingProject: Someone should please help me to review this job discussion, it's like my bàbà láti is ready to build his own duplex from this labor he is just calling. Engineers in the building. Please assist in going through. Just finished the German floor last year December. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 3:11pm On Jan 02, 2021 |
It always looks simple for me. I like simple thing  spyder880: Any special reasons boss?
Cost consideration, aesthetics, heat insulation? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 3:07pm On Jan 02, 2021 |
For me flat roof. spyder880: Let's do this again, which do you prefer, and why?
The high roof, or the contemporary style? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 1:18pm On Dec 31, 2020 |
#3350 is on the high side. twinskenny: You know anybody wey need Dangote cement for.Lagos, I get 3600 bags to sell. Selling at the rate of #3350
Someone forwarded this to me in case |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 4:43pm On Dec 28, 2020 |
I seconded this, please the aggrieved party kindly accept the apology and move on. A lot of us(people) are benefiting from this thread a lot as a kobokobo project owner. Please accept our apologies CC BankeSmalls, Rexology etc Godisgreatest1: I apologize to all Igbo's for the comments made concerning the transaction that went wrong.
It may be surprising that the same trader that is called a 'thief' may be the same trader that some people are searching for the best sales and services.
Several artisans have defrauded, cheated, plagiarized, threatened and insulted clients here on this thread, but no one has heard of their tribes. Some don't even post comments here again.
We have an artisan here that sells granite that was once 'axed' by another artisan for a transaction that went wrong, to the extent that a thread was dedicated to him, yet nobody heard of his tribe, till date I haven't heard and I don't want to hear, that's not my interest.
Just went through the last 4 pages of this thread and still can't translate it into a meaningful conversation.
Please this is enough. Apologies have been tendered. I follow this thread to learn, not to read about tribe.
Since on Saturday there are questions I want to ask about septic tank and block sizes, but I have been holding it because I am fully aware that in a sane community this sort of argument discourages intelligent minds!! Please let's embrace peace. when all this is cleared I will proceed. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 7:37pm On Dec 04, 2020 |
This stealing of a thing is in a typical Nigerian man(the one close to us are artisans), everybody are looking for shortcut to live big. That’s why I stick to my Engineer, his service charge and that of his work craft( Bricklayer, carpenter, iron bender etc) is higher than what I see on nairaland but belief me my engineer will drop your last kobo for you. He will use best practice to reduce cost. So I don’t experience all this stealing of a thing. I sleep well when am home and I concentrate on my job at office while job is ongoing at my site. This is the second house my Engineer is building for me and his honest and trust is second to none. |
Car Talk › Re: Frequent Fan Belt Cut by Thenext(op): 8:39pm On Nov 28, 2020 |
Thanks appreciate 9icetoo: It could be any of the accessories that the belt turns such as the compressor, alternator, water pump, idler pulley roller etc. All these will have to be examined. Any with unusual noise may have to be replaced. I had an issue like this on a skoda but it was the alternator that was the culprit. Merely spinning it didn't indicate any problem. The mechanic however had seen something similar recently and his guess worked.
As for the original belt, you will get it in trinity close to ladipo or go to radautoworks at lekki. She is on Nairaland as well. Gazzuzz seems to be going the German way so might take a look at the car. I do not think your problem is a fake belt. Even the fake belts last a long time. Something is creating so much resistance to the rolling motion of the belt causing it to collapse or cut. |
Car Talk › Re: Frequent Fan Belt Cut by Thenext(op): 9:09am On Nov 28, 2020 |
Those mechanics said it’s tokunbo belt and collected 5k for the purchase of the belt. Who knows may be it’s inferior belt. Please how can I get original belt Thanks Midoda: What quality of belt are you replacing with? Examine the engine pulley and or rollers/adjuster. |
Car Talk › Re: Frequent Fan Belt Cut by Thenext(op): 9:07am On Nov 28, 2020 |
I did not change anything. Thank you
quote author=Mottomata post=96518962]Did you change any component in the path of the fan belt? Like compressor etc.
Do you hear any unusual sound/noise?
You should conduct a visual inspection too or get someone qualified to check for you[/quote] |
Car Talk › Frequent Fan Belt Cut by Thenext(op): 7:18am On Nov 28, 2020 |
Please house what can be the cause of frequent fan belt cut? My Mercedes Benz (GLK350) fan belt has been cutting to pieces this days, within a week I have changed 2 different fan belt which I think is unusual. The belts got collapsed while driving. I have been using the car for over 3 years now and I have not experienced such before. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 5:33pm On Nov 01, 2020 |
I have read alots about him on this thread but I decided to give a trial which for now he has performed up to my expectations. I will surely give feedbacks for every delivery from him. Stay tuned One4me: He used to do very well before he went Rogue! Some years back (up to around 2014) he was the numero uno of Granite and Stone Dust supply on this thread. He supplied me five 30Tons and four 20tons granite (and lots of Stone Dust) some years back and they were okay, except the last one when he started telling me stories.
I want to think and hope that he is begining to realise the importance of keeping it honest and simple. I wish him well |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 9:09pm On Oct 30, 2020 |
Just to give my feedback on the granite I bought from Chekitaut, I can confirm to the house that he made the delivery of the granite on time as promised and the quantity of the granite is confirmed by my Engr. compared to the one we bought before. Keep it up bro and warm up for granite supply for the decking. Attached is the picture of the 30 tons he supplied for me.
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 6:25pm On Oct 27, 2020 |
Thanks for your contribution. The project will run between 12-15 months due to funds. n3xt: - 7.5 - 8% of the total contract sum should be fine regardless of his expertise and the complexity of the project.
- Make installmental payments based on milestones achieved.
- Retain 20% holdback for 30 days after completion of work.
______
The build can’t be more than a duplex. N4m supervision fee for a duplex ain’t too bad.
The project can be completed within 90 days at average of 40k per day  |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 12:14pm On Oct 27, 2020 |
My Engr. said the least he can collect from me is 10%. He is highly experienced and very good in the field, he built my home country house for me around 2016 and the building is fantastic. In short he is very good and has many projects(private and government) he is handling currently. micgray100: As a registered Engineer, we use total sum and source of project to determine Engineer's cost..
Total Sum of project Less than 50million and Private owned, can be percentaged at 2.5%
Total Sum of project Less than 50million and govt own /big multinational company, can be percentaged at 5%
Total Sum of project more than 50million and Private owned, can be percentaged at 5%
Total Sum of project more than 50million and govt own/ private big multinational company owned, can be percentaged at 7.5%..
lastly.. kobokobo stages supervision... 1 to 2% |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 12:10pm On Oct 27, 2020 |
I need one firstly because I belief they are knowledgeable/experienced in the field and would be able to deliver a standard project. I don’t want to build a house and be seing cracks etc due to some errors which would have been captured by the Engr. during construction. Secondly my work won’t permit me to be around all the time to monitor the mason(Baba Lati in your case �). EgunMogaji2: I’ve never required the service of one because I serve as my own General Contractor.
Why do you need one? Or at least on a full time basis. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 12:05pm On Oct 27, 2020 |
Please the stage you are talking about, are you referring to some like to DPC level, lintel level, decking level etc raymondFirstborn: Ok you can agree on a flat rate. Between 150 - 400k for each stage. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 7:09am On Oct 27, 2020 |
Thanks for your response. It’s a project of 45m according to the BOQ prepared for me by quantity surveyor. raymondFirstborn: Depends on the size of the project & engineers experience. 5% - 8% of the project cost. Or the client and engineer can agree on a flat rate. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 5:30am On Oct 27, 2020 |
Please what’s the standard/normal pay for Engr. supervising a site. Note: it’s a kobokobo project oooo CC: Nx3t Egunmogaji Raymondfirstborn QSfemi Hajj M |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 7:37pm On Oct 14, 2020 |
Thanks baba, I appreciate. n3xt:
Baba spend this thing na!
You can get 10KVA Japanese Engine for 850k (Soundproof)
You can reach Ikenna for that on 0706 210 3238 |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 5:08pm On Oct 14, 2020 |
Thanks for your response, but this ones are for big boys ooo not kobokobo like us. n3xt: I always patronize JMG Generators (FG Wilson Perkins UK Brands). Not sure they have 7.5 - 10KVA but sure of 12.5KVA. That’s around #3.2m
www.jmglimited.com |
Technology Market › Re: Professor On Any Type Of Generator. by Thenext: 3:49pm On Oct 14, 2020 |
Please I want to buy brand new Diesel engine generator within the range of 7.5-10kva, please which brand can I go for and the likely price that I can get it. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 3:32pm On Oct 14, 2020 |
My good people here, please I need Diesel engine generator in the range of 7.5-10kva. Please who can recommend a good brand for me with price as well. CC Egunmogaji Nx3t Kiekie Etc |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 6:03pm On Oct 07, 2020 |
Just exactly what someone told me. You are a blessing to this forum. n3xt: I hope this helps.
Pros and Cons of 0.5hp and 1hp Submersible Pump
1. Power Requirement: 0.5hp submersible pump will work even in situation where there’s low voltage. 1hp requires full current. You can also power 0.5hp pump with a medium size generators. If you try using same generator for 1hp pump, it might burn the pump.
2. Borehole Depth: 1hp submersible pump is an overkill where the borehole depth is not more than 20m. 0.5hp will work fine in most Lagos sites. But if your depth is over 50m or even more, you’ll require a bigger pump.
3. Usage
#personalopinion #notabibeli |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 11:56am On Oct 07, 2020 |
Thank you sir, I appreciate. n3xt: Best? I can’t really tell but I use Interdab submersible pump and it’s kinda reliable. Just ensure it is Copper type.
You can get between 0.5hp and 1.5hp but I think you should be fine with 0.5hp.
InterDab Pump Price (as at the time I’m typing this reply) 0.5hp Copper Coil - #52,500 1hp Copper Coil - #63,000 |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 9:34am On Oct 07, 2020 |
Please who can recommend a good/best submersible pumping machine and price as well.
CC Rotech77 n3xt Egunmogaji |
|
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Thenext: 6:24pm On Sep 26, 2020 |
These one are not for kobo kobo project ooo���� rotecch77: Oh BABA agbalagba have spoken I will post some here sir.
For those that have plan to become King in there domain like my OGA EGUN these is for you. |