Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. - Properties (3) - Nairaland

Nairaland Forum / Nairaland / General / Properties / Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. (34732 Views)

How To Build A Low Budget Bungalow ( 3 Bedroom Flat As Case Study) / Roofing A 3 Bedroom Block Of 4 Flat In Lagos / Building A Student Hostel : Profitability And Challenges (2) (3) (4)

(1) (2) (3) (4) (5) (6) (7) (8) (9) (Reply) (Go Down)

Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(m): 1:41pm On Aug 25, 2012
Plastering ongoing internally
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by bugmenot: 11:03pm On Aug 25, 2012
Aventures, do you mind posting picture of the burglary proof? Where will they be positioned, inside the house or outside?
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(m): 5:18am On Aug 26, 2012
The buglary will be fixed inside, i will post the pics in my next picture posting.
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by NL1960: 12:35pm On Aug 26, 2012
Aventures: The buglary will be fixed inside, i will post the pics in my next picture posting.

Will there be any mosquito nettings?. If so, i guess it will also be fixed inside. Will you mind posting that as well so as to enable us see the bulgary and mosquito nettings combination.
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(m): 1:54pm On Aug 26, 2012
Yes thereis mosquito nettings, and it comes along with the fabricated aluminium casement window. The window was instaled before plastering while the burglary was insatalled after plastering. The pix below shows some window with d window and moosquito net and d burglary fixed.

Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by maninmood(m): 7:25pm On Aug 26, 2012
Aventures, you have a mature, responsible way of answering questions, kudos.

By the way, how much was incurred on the parapet design? Could you give us the low-down of the total amount incurred till this stage? I want to see how convenient it would be for me if I start this kind of building in the nearest future? And may I have the contact of the aluminium casement installation expert? Thx in advance.

1 Like

Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(m): 9:46pm On Aug 26, 2012
@MANINMOOD I AM GIVING THIS EXPENDITURE UP TO DATE BASE ON UR REQUEST. THIS EXPENDITURE IS INCLUSIVE OF MATERIAL, LABOUR & LOGISTIC BUT IS EXCLUSIVE OF OMO ONILE'S PAYMENTS ESTATE DUES AND CHARGES AND SUPERVISION FEES. TO WHOM IT MAY CONCERN I WILL APPRECIATE A CONSTRUCTIVE CRITICISM. I AM NOT IMPOSING THIS COST ON ANY BODY NEITHER AM I ESTABLISHING THAT THIS IS WHAT YOU MUST ALSO INCURE ON UR OWN PROJECT AS WE KNOW THAT SEVERAL FACTORS MAY AFFECT PROJECT COST SUCH AS CLIENT TASTE OF QUALITY, LOCATION, SOIL CONDITION, AVAILABILITY OF MATERIAL, ETC. AS A MATTER OF FACT MY CLIENT IN THIS CASE REQUIRE A VERY HIGH INTEGRITY BUILDING AND CLASSY FINISHING AND THAT IS WHY WE EMBARK ON FRAMED STRUCTURE METHOD.
FIND BELOW:
COST BREAK DOWN FROM FOUNDATION TO DATE
FOUNDATION 2,800,000.00
GROUND FLOOR COLUMNS 450,000.00
FIRST FLOOR SLAB (Decking) 265,000.00
BLOCK WORK (GRD & UPPER FLOOR) 2,650,000.00
LINTEL, ROOF BEAMS, ROOF TANK SLAB 760,000.00
PARAPET/CONCRETE FASCIAL (PRECAST) 450,000.00
BAMBOO DOUBLE LEG SCAFOLD 150,000.00
ROOF WOOD & NOGGINS 850,000.00
ALUMINIUM ROOF COVERING (TOWER PRODUCT) 1,193,000.00
ELECTRICAL FIRST FIX & DISTRIBUTION BOARDS 550,000.00
PLUMBING FIRST FIX 450,000.00
AC CONDUITS AND GAS PIPE CONDUITS 325,000.00
ALUMINIUM WINDOWS 1,150,000.00
FENCE, PILLARS, COPING & GATE HOUSE 1,100,000.00
IRON GATES (2 NRS) 300,000.00
BURGLARY 450,000.00
ARTWORK AND DESIGNS 350,000.00
BUILDING AND FENCE PLASTERING 1,950,000.00
SEPTIC TANK AND SOAK AWAY (2NRS) 850,000.00
SUM TO DATE 17,043,000.00.

3 Likes

Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by maninmood(m): 8:20am On Aug 27, 2012
Aventures: @MANINMOOD I AM GIVING THIS EXPENDITURE UP TO DATE BASE ON UR REQUEST. THIS EXPENDITURE IS INCLUSIVE OF MATERIAL, LABOUR & LOGISTIC BUT IS EXCLUSIVE OF OMO ONILE'S PAYMENTS ESTATE DUES AND CHARGES AND SUPERVISION FEES. TO WHOM IT MAY CONCERN I WILL APPRECIATE A CONSTRUCTIVE CRITICISM. I AM NOT IMPOSING THIS COST ON ANY BODY NEITHER AM I ESTABLISHING THAT THIS IS WHAT YOU MUST ALSO INCURE ON UR OWN PROJECT AS WE KNOW THAT SEVERAL FACTORS MAY AFFECT PROJECT COST SUCH AS CLIENT TASTE OF QUALITY, LOCATION, SOIL CONDITION, AVAILABILITY OF MATERIAL, ETC. AS A MATTER OF FACT MY CLIENT IN THIS CASE REQUIRE A VERY HIGH INTEGRITY BUILDING AND CLASSY FINISHING AND THAT IS WHY WE EMBARK ON FRAMED STRUCTURE METHOD.
FIND BELOW:
COST BREAK DOWN FROM FOUNDATION TO DATE
FOUNDATION 2,800,000.00
GROUND FLOOR COLUMNS 450,000.00
FIRST FLOOR SLAB (Decking) 265,000.00
BLOCK WORK (GRD & UPPER FLOOR) 2,650,000.00
LINTEL, ROOF BEAMS, ROOF TANK SLAB 760,000.00
PARAPET/CONCRETE FASCIAL (PRECAST) 450,000.00
BAMBOO DOUBLE LEG SCAFOLD 150,000.00
ROOF WOOD & NOGGINS 850,000.00
ALUMINIUM ROOF COVERING (TOWER PRODUCT) 1,193,000.00
ELECTRICAL FIRST FIX & DISTRIBUTION BOARDS 550,000.00
PLUMBING FIRST FIX 450,000.00
AC CONDUITS AND GAS PIPE CONDUITS 325,000.00
ALUMINIUM WINDOWS 1,150,000.00
FENCE, PILLARS, COPING & GATE HOUSE 1,100,000.00
IRON GATES (2 NRS) 300,000.00
BURGLARY 450,000.00
ARTWORK AND DESIGNS 350,000.00
BUILDING AND FENCE PLASTERING 1,950,000.00
SEPTIC TANK AND SOAK AWAY (2NRS) 850,000.00
SUM TO DATE 17,043,000.00.


You're a man that knows his onions, I duff my hat. This is the type of detailed explanation we want. At least I personally have the idea of how much it will cost me to get this kind of building erected up to this level. You are well done my man. I would contact you when I need your assistance. By the way, could you give me your casement window guy number? I need it for my duplex. Thx
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(m): 11:37am On Aug 27, 2012
08053383877 Mr Sunday. Just tell him frm Engr. Niyi.
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(m): 7:01pm On Aug 27, 2012
pics of some plastered area in the interior

Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by yndig: 7:29pm On Aug 27, 2012
[/b][b][b][/b]
Aventures: @MANINMOOD I AM GIVING THIS EXPENDITURE UP TO DATE BASE ON UR REQUEST. THIS EXPENDITURE IS INCLUSIVE OF MATERIAL, LABOUR & LOGISTIC BUT IS EXCLUSIVE OF OMO ONILE'S PAYMENTS ESTATE DUES AND CHARGES AND SUPERVISION FEES. TO WHOM IT MAY CONCERN I WILL APPRECIATE A CONSTRUCTIVE CRITICISM. I AM NOT IMPOSING THIS COST ON ANY BODY NEITHER AM I ESTABLISHING THAT THIS IS WHAT YOU MUST ALSO INCURE ON UR OWN PROJECT AS WE KNOW THAT SEVERAL FACTORS MAY AFFECT PROJECT COST SUCH AS CLIENT TASTE OF QUALITY, LOCATION, SOIL CONDITION, AVAILABILITY OF MATERIAL, ETC. AS A MATTER OF FACT MY CLIENT IN THIS CASE REQUIRE A VERY HIGH INTEGRITY BUILDING AND CLASSY FINISHING AND THAT IS WHY WE EMBARK ON FRAMED STRUCTURE METHOD.
FIND BELOW:
COST BREAK DOWN FROM FOUNDATION TO DATE
FOUNDATION 2,800,000.00
GROUND FLOOR COLUMNS 450,000.00
FIRST FLOOR SLAB (Decking) 265,000.00
BLOCK WORK (GRD & UPPER FLOOR) 2,650,000.00
LINTEL, ROOF BEAMS, ROOF TANK SLAB 760,000.00
PARAPET/CONCRETE FASCIAL (PRECAST) 450,000.00
BAMBOO DOUBLE LEG SCAFOLD 150,000.00
ROOF WOOD & NOGGINS 850,000.00
ALUMINIUM ROOF COVERING (TOWER PRODUCT) 1,193,000.00
ELECTRICAL FIRST FIX & DISTRIBUTION BOARDS 550,000.00
PLUMBING FIRST FIX 450,000.00
AC CONDUITS AND GAS PIPE CONDUITS 325,000.00
ALUMINIUM WINDOWS 1,150,000.00
FENCE, PILLARS, COPING & GATE HOUSE 1,100,000.00
IRON GATES (2 NRS) 300,000.00
BURGLARY 450,000.00
ARTWORK AND DESIGNS 350,000.00
BUILDING AND FENCE PLASTERING 1,950,000.00
SEPTIC TANK AND SOAK AWAY (2NRS) 850,000.00
SUM TO DATE 17,043,000.00.

@Aventure are you sure of the amount spent on slab 265k or is it just a typo ? If it is not a mistake pls explian
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by segcymoor(m): 7:36pm On Aug 27, 2012
FIRST FLOOR SLAB (Decking) 265,000.00.........Weldone Engr Niyi. I will like u to defend how u do ur decking for this amount.
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by spyder880(m): 7:45pm On Aug 27, 2012
yndig: [/b][b][b][/b]

@Aventure are you sure of the amount spent on slab 265k or is it just a typo ? If it is not a mistake pls explian

I saw this and I know there was a mistake somewhere, maybe the decking took N2,650,000 and the block work with that amount may be mistakenly swapped with the deck cost. It might be a small typo error, nothing to worry about. I am sure Aventures will correct this soon.

segcy.moor:
FIRST FLOOR SLAB (Decking) 265,000.00.........Weldone Engr Niyi. I will like u to defend how u do ur decking for this amount.
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(m): 10:35pm On Aug 27, 2012
I really appreciate u all 4 dis wonderfull observation. It was a typographical error, the 265K was meant for the first floor columns. While d decking actually gulp 3.4m. I will correct the post by 2moro. @ segcy more tanx 4 pulling my legs LOL as a matter of fact u assisted me in vetting dis decking wrk in question and u we were also 2gether on d casting and so u kno d fact abt dis figure tanx so much any way.
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by maninmood(m): 11:35pm On Aug 27, 2012
Aventures: 08053383877 Mr Sunday. Just tell him frm Engr. Niyi.

Thank you Engr Niyi. I got the number
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(m): 9:53am On Aug 28, 2012
U are welcome!
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(m): 7:04pm On Aug 29, 2012
Due to the typographycal erro in the cost breakdown i posted previously,i deemed it fit to correct the error and repost.
COST BREAK DOWN FROM FOUNDATION TO DATE
FOUNDATION 2,800,000.00
GROUND FLOOR COLUMNS 450,000.00
FIRST FLOOR SLAB (Decking) 3,400,000.00
FIRST FLOOR COLUMN 265,000.00
BLOCK WORK (GRD & UPPER FLOOR) 2,650,000.00
LINTEL, ROOF BEAMS, ROOF TANK SLAB 760,000.00
PARAPET/CONCRETE FASCIAL (PRECAST) 450,000.00
BAMBOO DOUBLE LEG SCAFOLD 150,000.00
ROOF WOOD & NOGGINS 850,000.00
ALUMINIUM ROOF COVERING (TOWER PRODUCT) 1,193,000.00
ELECTRICAL FIRST FIX & DISTRIBUTION BOARDS 550,000.00
PLUMBING FIRST FIX 450,000.00
AC CONDUITS AND GAS PIPE CONDUITS 325,000.00
ALUMINIUM WINDOWS 1,150,000.00
FENCE, PILLARS, COPING & GATE HOUSE 1,100,000.00
IRON GATES (2 NRS) 300,000.00
BURGLARY 450,000.00
ARTWORK AND DESIGNS 350,000.00
BUILDING AND FENCE PLASTERING 1,950,000.00
SEPTIC TANK AND SOAK AWAY (2NRS) 850,000.00
SUM TO DATE 20,443,000

[
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(m): 6:05pm On Aug 30, 2012
More pix of plastering to come.
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(m): 3:25pm On Aug 31, 2012
plastering pix

Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(m): 8:26pm On Sep 01, 2012
smiley
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by kkonsults: 9:16am On Sep 02, 2012
Good job engr.
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Nobody: 12:42pm On Sep 02, 2012
Dear Eng,
Thank you 4 d good job done.Pls what are d advantage of using granite over gravel on the pillars and german floor and is there any problem if we mix both gravel+granite for the pillars?.Thanx again.
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(m): 8:11pm On Sep 02, 2012
sir in all ways granite is far better than gravel. Washed gravel is better but granite is still d best because it gives your concrete good snd desirable crush strength required for you structural members such as beam, pillars and slabs. The earth particles in the gravel attacks the reinforcement and corrodes it, but gravel can be used in some cases such as blinding, german floor, lean concrete (to fill the hollow of blocks) compound flooring etc. Washed gravel can as well give us a desireable strength but the truth is that it is not economical, the process is tedious and cumbersome. No company producess washed grave this day you processed by your self. first and foremost you will buy the gravel prepare a surface concrete tank fill it with water then get a sieve load it with gravel lower it into d water and start shaking it so that the water can washed away the earth attached to the gravel stones away. To get a 30 Tons of washed gravel you may need to buy 4 to 5 trips of 10 tons gravel ( in my area now 10 tons grave cost 40,000) so buying 4 of 10 tons of gravel will cost 160k less labour to wash it. While you can get a 30 tons load of granite for 135K or less. So the choice is yours. Granite or gravel?
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by segcymoor(m): 10:23pm On Sep 02, 2012
Correct! Oga don said it all!
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by maninmood(m): 10:48pm On Sep 02, 2012
well done!
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(m): 12:56pm On Sep 03, 2012
@KKonsult, segcymore and mannimood. Tanx i am so grateful
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(m): 7:34pm On Sep 05, 2012
POP work ongoing internally. pix below shows the material on site for the job.

Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by greenlilly(m): 10:18am On Sep 06, 2012
Aventures pls i want to know if the house u are constructing is 3bedroom 4 flat and also want is the dimension. To the whole house pls i want to know the current price of 4*6, 4*4 sub frame casement window.Thank you all and God bless.
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by greenlilly(m): 10:20am On Sep 06, 2012
Aventures pls i want to know if the house u are constructing is 3bedroom 4 flat and also what is the dimension of the house? To the whole house pls i want to know the current price of 4*6, 4*4 sub frame casement window.Thank you all and God bless.
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(m): 8:25pm On Sep 06, 2012
greenlilly: Aventures pls i want to know if the house u are constructing is 3bedroom 4 flat and also what is the dimension of the house? To the whole house pls i want to know the current price of 4*6, 4*4 sub frame casement window.Thank you all and God bless.
THis house is 3 bedroom four flats. The overall dimension is 25m x 15m. As per the price of sub frame i will ask my aluminium fabricator and get back to you.
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by greenlilly(m): 8:55pm On Sep 07, 2012
Aventures I'm very very grateful
Re: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by greenlilly(m): 9:06pm On Sep 07, 2012
One more question pls.what is the dimension of the land pls?.I want to see if the plan will enter my client land. Tx

(1) (2) (3) (4) (5) (6) (7) (8) (9) (Reply)

Properties With C Of O For Sale in Ibadan, Lagos & Other Parts of Nigeria / Three-storey Building, Prison Wall Collapse In Onitsha / Lagos Issues Stop Work Order To A Developer In Lekki (Photos)

(Go Up)

Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health
religion celebs tv-movies music-radio literature webmasters programming techmarket

Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)