superstructures: ELEMENT NR 2 GROUND FLOOR WALL, LINTEL AND COLUMNS Blockwork Superior quality hollow sandcrete blockwork bedded and jointed in cement and sand mortar 1:6 A 225mm Blockwall 3000 nr 155.00 ₦ 465,000.00 B Cement required for the mortar 60 bag 2,000.00 ₦ 120,000.00 ₦ -00 D Sand required for the mortar 2 trip 30,000.00 ₦ 60,000.00 ₦ -00 E workmanship for laying blocks 3500 nr 75.00 ₦ 262,500.00 Vibrated reinforced in - situ concrete ( 1: 3 : 6 / 19mm Aggregate ) filled into formwork and well reinforcement ( formwork and reinforcement both measured packed around separately) in : F Columns : Column type 2 : 225 x 225mm (24nr) , volume = 11.4m3 1. Cement 15 bag 2,000.00 ₦ 30,000.00 2. Sand 0.5 trip 28,000.00 ₦ 14,000.00 4. Workmanship for concreting 15 bag 800.00 ₦ 12,000.00 G Lintel ( 225 x 225mm ) of about 120m length 1. Cement 30 bag 2,000.00 ₦ 60,000.00 2. Sand 1.0 trip 28,000.00 ₦ 28,000.00 4. Workmanship for concreting 30 bag 800.00 ₦ 24,000.00 Reinforcement H High Yield steel bar to BS 4461 in straight and bent bars ( All Provisional ) I 12mm Diameter in lintel 45 nr 1,200.00 ₦ 54,000.00 J 10mm lintel in ditto as links and stirrups 25 nr 1,000.00 ₦ 25,000.00 M Workmanship for column iron work 24 nr 1,200.00 ₦ 28,800.00 N Workmanship for lintel iron work sum ₦ 50,000.00 Formwork to: P Sides of lintel sawn plank of 300 x 25mm 60 nr 900.00 ₦ 54,000.00 O 75 x 50mm for brazing wood 40 nr 250.00 ₦ 10,000.00 P Nails and other miscellaneous sum ₦ 15,000.00 Q Workmanship for formwork sum ₦ 50,000.00 GROUND FLOOR ELEMENT NR 2 To Bill ( Summary ) ₦ 1,362,300.00 |
substructures: ITEM DESCRIPTION QUANTITY UNIT RATE AMOUNT(N) ELEMENT NR 1 SUBSTRUCTURE (ALL PROVISIONAL) A Setting out of foundation using profile board sum ₦ 30,000.00 B Provision of water source (bore hole ) sum Preparation of soil for building construction E Excavating; trench for strip foundation; exceeding of 675mm in width; maximum depth not exceeding 750mm; starting from, ditto 150 m ₦ 500.00 ₦ 75,000.00 Filling G Back filling with selected materials arising from excavations, deposited and compacted in 150mm layers 12 room ₦ 4,000.00 ₦ 48,000.00 H 450mm Thick filling imported and deposited over the back filled earth, deposited and compacted in 150mm Layers 12 trip ₦ 13,000.00 ₦ 156,000.00 sum ₦ 309,000.00 Concrete work J Plain in - situ concrete ( 1:2:4/19mm Aggregate ) Vibrated reinforced in - situ concrete ( 1: 2 : 4 / 19mm Aggregate ) filled into formwork and well packed around reinforcement ( formwork and reinforcement both measured separately ) in : 1. Number of bags of cement for strip footing/column work 60 bag 2,000.00 ₦ 120,000.00 2. trip of sand for the foundation work of 10tonnage sand 2.0 trip 30,000.00 ₦ 60,000.00 3. trip of gravel of 30 tonnage gravel 1 trip 220,000.00 ₦ 220,000.00 4. workmanship for the concrete work 60 bag 800.00 ₦ 48,000.00 sum ₦ 448,000.00 K DPC oversite concrete of 150mm thick 15cubic meters ( 1:3:6/19mm Aggregate ) 1. Number of bags of cement for the oversite concrete 50 bag 2,000.00 ₦ 100,000.00 2. trip of sand for the foundation work of 10tonnage sand 2.0 trip 28,000.00 ₦ 56,000.00 3. trip of gravel of 30 tonnage gravel 0.0 trip 220,000.00 ₦ -00 4. workmanship for the concrete work 50 bag 800.00 ₦ 40,000.00 sum ₦ 196,000.00 Reinforcement for column base (basket ) and starter column High Yield steel bar to BS 4461 in strength and bent bars ( All Provisional ) L 12mm Diameter in column bases 25 nr 1,200.00 ₦ 30,000.00 M 12mm Diameter in column as starter bars 14 nr 1,200.00 ₦ 16,800.00 N 10mm Diameter ditto as links and stirrups 14 nr 1,000.00 ₦ 14,000.00 O workmanship for both column base and starter column 24 nr 2,200.00 ₦ 30,000.00 sum ₦ 90,800.00 Sawn formwork to P Four sides of Columns (24 nr) 20 nr 1,200.00 ₦ 24,000.00 Q Edges of bed 150mm high 10 nr 1,200.00 ₦ 12,000.00 R 2 x 3 brazing 100 nr 250.00 ₦ 25,000.00 S Workmanship and other miscellaneous sum ₦ 20,000.00 sum ₦ 81,000.00 Blockwork Superior quality hollow sandcrete blockwork bedded and jointed in cement and sand mortar (1:6) in foundation and filled solid with weak concrete ( 1:3:6/19mm Aggregate) T 225mm thick sancrete block 1250 nr 155.00 ₦ 193,750.00 U Cement for moltar joint 40 bag 2,000.00 ₦ 80,000.00 V Sand for block mortar joint 1 trip 28,000.00 ₦ 28,000.00 W workmanship for block laying 1400 nr 50.00 ₦ 70,000.00 sum ₦ 371,750.00 To collection ₦ 1,496,550.00 SUBSTRUCTURE ELEMENT NR 1 To Bill ( Summary ) ₦ 1,496,550.00 |
ajepako:Why say we betray our brothers? |
ajepako:southerner is a political creation.... i am yoruba and i can be from anywhere in south western Nigeria and middle belt belt ( kwara and kogi). i don't hate igbos or any other south southern tribe but i hate the notion of " blaming Yorubas for campaigning and voting out GEJ |
ajepako:who is your brother? what is the similarity between Yorubas and igbos? |
collinsVP:Hugo chavez is a Venezuela president dummy and he never fired his shoe on Gorge Bush but an Iraqi dis-grunted citizen did.... |
here is the summary of the foundation work. 1. setting out = 30k 2. strip footing of 140m = 56k 3. back filling, imported laterite and compaction = 30 + 120k = 150k 4. concrete for foundation and foundation column of 20nr = 418k 5. DPC = 252k 6. iron work for the foundation = 76k 7. formwork 54.5k 8. block work = 416.5k TOTAL = N1,450,000 depending on location and the cost of materials, the above listed price vary, for example removing back filling = - 150k removing dpc =-252k removing the introduced foundation column = -(76k + 20k) ( formwork to foundation column) block work can also be reduced if the block is made by the contractor/building owner = - 50k a cheaper gravel in areas like south west and north will reduce the cost of the foundation footings =-180k Total possible reduction = 728k minimum cost of foundation (excluding dpc) = N1,450,000 - N728,000 = N725,000 |
USAutoBuy:ELEMENT NR 1 SUBSTRUCTURE (ALL PROVISIONAL) A Setting out of foundation using profile board sum ₦ 30,000.00 B Provision of water source (bore hole ) sum Preparation of soil for building construction E Excavating; trench for strip foundation; exceeding of 675mm in width; maximum depth not exceeding 750mm 140 m ₦ 400.00 ₦ 56,000.00 Filling G Back filling with selected materials arising from excavations, deposited and compacted in 150mm layers 10 room ₦ 3,000.00 ₦ 30,000.00 H 450mm Thick filling imported and deposited over the back filled earth, deposited and compacted in 150mm Layers 8 trip ₦ 15,000.00 ₦ 120,000.00 Concrete work J Plain in - situ concrete ( 1:3:6/19mm Aggregate ) Vibrated reinforced in - situ concrete ( 1:3 :6 / 19mm Aggregate ) filled into formwork and well packed around reinforcement ( formwork and reinforcement both measured separately ) in : 1. Number of bags of cement for strip footing/column work 60 bag ₦ 2,000.00 ₦ 120,000.00 2. trip of sand for the foundation work of 10tonnage sand 2.0 trip ₦ 30,000.00 ₦ 60,000.00 3. trip of gravel of 30 tonnage gravel 1 trip ₦ 190,000.00 ₦ 190,000.00 4. workmanship for the concrete work 60 bag ₦ 800.00 ₦ 48,000.00 K DPC oversite concrete of 100mm thick 15cubic meters ( 1:3:6/19mm Aggregate ) 1. Number of bags of cement for the oversite concrete 60 bag ₦ 2,000.00 ₦ 120,000.00 2. trip of sand for the foundation work of 10tonnage sand 3.0 trip ₦ 28,000.00 ₦ 84,000.00 3. trip of gravel of 30 tonnage gravel 0.0 trip ₦ 190,000.00 ₦ - 4. workmanship for the concrete work 60 bag ₦ 800.00 ₦ 48,000.00 Reinforcement for column base (basket ) and starter column High Yield steel bar to BS 4461 in strength and bent bars ( All Provisional ) L 12mm Diameter in column bases 20 nr ₦ 1,200.00 ₦ 24,000.00 M 12mm Diameter in column as starter bars 10 nr ₦ 1,200.00 ₦ 12,000.00 N 10mm Diameter ditto as links and stirrups 10 nr ₦ 1,000.00 ₦ 10,000.00 O workmanship for both column base and starter column 20 nr ₦ 2,200.00 ₦ 30,000.00 Sawn formwork to P Four sides of Columns (24 nr) 20 nr ₦ 900.00 ₦ 18,000.00 Q Edges of bed 150mm high 10 nr ₦ 900.00 ₦ 9,000.00 R 2 x 3 brazing 50 nr ₦ 250.00 ₦ 12,500.00 S Workmanship and other miscellaneous sum ₦ 15,000.00 Blockwork Superior quality hollow sandcrete blockwork bedded and jointed in cement and sand mortar (1:6) in foundation and filled solid with weak concrete ( 1:3:6/19mm Aggregate) T 225mm thick sancrete block 1500 nr ₦ 155.00 ₦ 232,500.00 U Cement for moltar joint 30 bag ₦ 2,000.00 ₦ 60,000.00 V Sand for block mortar joint 1 trip ₦ 28,000.00 ₦ 28,000.00 W workmanship for block laying 1600 nr ₦ 60.00 ₦ 96,000.00 To collection ₦ 1,453,000.00 SUBSTRUCTURE ELEMENT NR 1 To Bill ( Summary ) ₦ 1,453,000.00 |
USAutoBuy:i will soon bring down detail breakdown but in summary 1.5m for foundation including dpc 150mm thick, 3 course above ground level, wire mesh, 15 foundation columns etc. 2. superstructure to roof level = N1.5m for a wall of 3m high, 225mm thick, ring lintel, 15.super structure column and head course 3. roofing and nogging = 1.5m with well treated hard roof truss timber, long span roofing sheet, pvc 4. finishes such as plumbing, electrical, plastering, tiling, windows doors, burglary proof etc. 2m. |
13.2m x 12.2m |
Ahmed0336:FUTMX...in the house |
Idrismusty97:lol....i like this open minded guy |
FastShipping:you are absolutely right sir... |
FastShipping:I will disagree with you sir. The single windows in those room have a dimension of 1500mm x 1200mm which is big enough to allow flow of air. cross ventilation is good but in situation where its not possible to get a wider window will do. Ventilation also depend on the vegetation cover, movement of earth round the sun and the wind direction. Check out this design of a building in USA
|
FastShipping:Nigerians love to separate their living room from the dinning area. the kitchen can be moved from its current location to the laundry location, that i will do i think the visitor's toilet is important and will stay the veranda in the front is an important because of its unique functionality and aesthetic look The master's bedroom is ok and will stay |
snakebeat:i have completed my task there sir....our job description is to get the building up to roof level. |
snakebeat:blinding : blinding should be done before main concrete footing, its made of weaker concrete to protect the main foundation footing from adverse soil condition like moisture. It's commonly used on reinforced concrete foundation like pad footings, reinforced wide strip, raft foundation etc. For a strip foundation without reinforcement ( iron bar) no blinding is really needed |
Mgbadike80:you are welcome sir |
sukkot:That is is stupidity....Buhari is a Nigeria president and should appoint competent Nigerians irrespective of tribe and religion. You don't developed a nation been a bigot that is the reason we send jona back to otueke |
Mgbadike80:I love the criticism and i think they are all positive. with regards to the laundry position, i think i will change it to make the kitchen closer to the dining area. Introduction of additional wall to make solve that problem will render the living small small and will make that area very dark since natural light will hardly come in due to lack of window |
mufutau55:the tiny space adjacent to the visitor's toilet is 600mm that is where the window is located |
nduline:i will get back to you sir |
mufutau55:about 13.2m x 10.3m |
Mgbadike80:225mm head course, means a 9" concrete beam place ontop of the building serving as the final course to receive the roofing truss ( tie beam and rafter). Light reinforcement means Nominal reinforcement ( a minimum reinforcement of say 2Y10 down and 2Y12 up), though you need the 1/8 iron tie rods spaced @ 4ft (1.2m) center to tie the roof truss to the building. Concrete foundation footing is what people commonly or mistakenly called blinding. Blinding is a weak concrete no necessarily of the strength of the main structural member intended to protect, which help protect such member from the surface of the soil below. Concrete strip footing can be define as a type of shallow foundation ( shallow foundation <= width or with depth < = 1.5m) which carries uniformly distributed load ( load from load bearing partition walls). we have normal strip and wide strip ( due too poorer soil and low bearing capacity),, wide strip requires reinforcement against shear stress. |
here is the floor plan
|
Mgbadike80:Since the gravel is a bit expensive, only 15 tonne is use for the foundation footings while the remaining 15tonnes is used for the german floor but all other materials will only be for the concrete footings |
Mgbadike80:Thank you sir for your observation Low cost building is a building that can built comfortably by middle income class with a minimal budget of say 4 - 7million in a city like port harcourt with all the structural features like strong concrete footings, adequate building level of sau 1.2m from the foundation, well compacted laterite filling, well laid DPM and oversite concrete, well vibrated, hollow sancrete block wall, adequate mortar mix of ( 1:6), well chain lintel with minimum reinforcement of Y10mm and concrete of mix (1:3:6), adequate headroom of 3m, adequate concrete head course of 225mm high with mild reiinforcement and with moderate finishing |
foundation block work perimeter of work = 120m No of course = 5 courses ( 1.2m) No of blocks = 120/0.45 x 5 = 1300 blocks (1,500blocks) 225mm (9") block @ N155/nr = N232,500 number of bag of cement required to lay the blocks, assuming 50blocks /bag of cement = 30bags = N60,00 workmanship @ N60/nr = N 120,000 Total = N 412,500 |
ELEMENT 3: Foundation concrete work perimeter of foundation = 120m width of strip footings = 0.675m depth of foundation footing = 0.225m Volume of concrete = 120 x 0.675 x 0.225 = 18.225m3 using a mix ratio of 1:3:6 part of cement = 1/9 x 18.225 x 1506/50 = 61bags ( 75bags) = N150,000 part sand = 3/9 x 18.225 x 1.6/10 = 0.972 ( 1 trip of four bucket sharp sand) = N30,000 part of gravel = 6/9 x 18.225 x 2.4/30 = 1 trip of 30tonnes 3/4 gravel = N220,000 workmanship = N60,000 Total = N460,000 |
carting away of excavated material: this involve the removal of the excavated earth away from foundation area up to 50m away to allow for easy movement of man and materials. this can be done with less than N30,000 |
Excavation work Length of excavation = 130m ( addition of all the partition walls) depth of excavation = 750mm Rate of excavation @ N500/m = N65,00 some other miscellaneous = N10,000 Total = N 75,000 |
Element 2: Setting out of the foundation using profile board Area of building = 13.2m x 10.2m perimeter = (2 x 13.2) + (10.2 x 2) = 46.8m Number of pegs assuming spacing of 1.2m c/c = 46.8/1.2 = 39pegs ( use 45pegs) since 1 bundle has 24pegs, you need 2 bundle of peg @ N1,000/peg = N2,000 Profile board using a profile of 2" x 2" x 11' ( soft 2 x 2 wood) = 47/3 =17nr @ N200 = N3,400 Others miscellaneous = N5,000 Workmanship of one carpenter and one labor = N 6,000 Total = N16,400 |