₦airaland Forum

Welcome, Guest: Register • Login • With Google • Trending • Recent • New

Stats: 3,345,472 members, 8,517,688 topics. Date: Thursday, 12 November 2026 at 08:41 PM

Toggle theme

Topsy23's Posts

Nairaland Forum › Topsy23's Profile › Topsy23's Posts

1 2 3 4 5 6 7 8 ... 58 59 60 61 62 63 64 65 66 (of 212 pages)

Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 9:15pm On Nov 17, 2021
Thanks for patronizing us
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 10:27pm On Nov 16, 2021
Good evening to everyone
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 11:46am On Nov 15, 2021
Temi1:
Hello, please what are your current prices for these?
Pls can you drop your mail or WhatsApp numb r
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 4:01pm On Nov 14, 2021
bukolo:
Good afternoon and Happy Sunday.

Please is flow switch good for overhead tank on a building? If not, any suggestion?

Thank you.
cc topsy
n3xt
Float switch is good ONLY if your voltage is normal and stable. If your area is normally experience low voltage Pls do not use float switch or else you will burn your pump.
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 3:51pm On Nov 14, 2021
Thanks

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 3:28pm On Nov 14, 2021
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 4:05pm On Nov 13, 2021
kopell:
Oga@ micgray100 can you please break things down for us how 1.5million will be average cost to build 3 bedrooms bungalow on dry land, when cement is currently sold @ 3, 950 - 4,200 depending on location. I saw woods and roofing @ close to 1,7 million for something similar on kobocity web, with self supervise project. Please sir we need it, may be many of us are doing something wrong ni sir. We need that eyes � opening awareness. For the gentleman that ask for help. Please don’t be scared away go and start even if it is 100k start something put your mind to it you can do it. Stay blessed.
1.5m can not build 3bwdroom bungalow now oooo... Building materials are expensive these days
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 10:19am On Nov 13, 2021
n3xt:
May God remember us all. How are you coping with “Change”?

I’ve been buying cement 4100 - 4300 since 2 weeks ago.
Price of dollar is coming down but price of materials keep on increasing . Coleman increase their price this Monday. Now nigerchin is cheaper than Coleman and because Coleman increased their price Nigerchin is planning to increase again. Things are not going normal in this country. Imported duty is increasing as well.

It is well with Nigeria
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 10:11am On Nov 13, 2021
somehow:
Most of them are leaking/broken.
Some were installed wrongly too.

The most affected of the conduit pipes are those for electrical wires.
The best is to re-run all the pipes and carry out hydrostatic test in them
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 7:23pm On Nov 11, 2021
Call us today
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 9:59am On Nov 08, 2021
Good morning my people

Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 9:58am On Nov 08, 2021
Good morning
Properties › Re: Current Prices Of Building Materials In Nigeria by topsy23(m): 5:14pm On Nov 07, 2021

Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 5:08pm On Nov 07, 2021
25mm 4-core armoured cable delivered to Lekki

Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 4:11pm On Nov 07, 2021
Finally Coleman Increase price of cable
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 8:26pm On Nov 06, 2021
Born2conquer:
This is also subjected to the Client’s taste, some WC costs as high as 200k
Yes you are right. Some chandelier light are not less than 450k. Client should not expect an electrician to install it at a cheaper price. Risk is involve and if anything happen Engr or technician would be ask for replacement
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 9:12am On Nov 04, 2021
Delivered to Aboru yesterday.

Thanks for your patronage.

Properties › Re: ABB Distribution Board And Schneider Distribution Board Our Choice by topsy23(op): 6:29am On Nov 04, 2021
Good morning
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 9:17pm On Nov 03, 2021
damola311:
Good morning to the house!

Please I need an idea of how much it cost (workmanship) for the installation of sanitary wares and plumbing fittings in a 4bd?


Also, workmanship for light fittings (pop, wall etc)
Saying 4 bedroom means 5 toilets
It means 4 of the toilet will have the below listed items ;
Water closet (WC)
Wash hand basin
Bathtub/shower cubicle
Water heater
Mirror
Soap dish
Towel rail

The 5th toilet we have these;
Water closet
Wash hand basin
Soap dispenser

Kitchen
Water heater
Kitchen sink
Budget between 100k and 150k

Electrical
Installation of fittings with the following listed items
Room 1
Spotlight 4
Wall light 2
Socket 3
AC switch 1
TV socket

Sitting room
Spotlight 4
Rope light
Wall light 3
Socket 4/5
TV. 1
AC switch 1

KITCHEN
Ceiling light 4
Socket 5
Water heater 1
Cooker socket 1

Passage light

External light
Termination of DB
Installation of gear switch and changeover
Cut-out fuse
Etc .......


Budget between 150k and m200k
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 8:56am On Nov 03, 2021
EnuanwaKelly:
Hello nairalanders, please which one is advisable between moulding and buying blocks if time and money is not the problem.

Engineers in the house, which of the two do you suggest is better ??. . And reason for your choice ..
Also how many blocks will finish a four-bedroom flat on a 50by50 plot of land from start to finish..

Thanks .
To me i will advice you mould your blocks if you are not rush or haste to complete the project within shortest periods.

Advantage is going to be strong compare to what you will buy outside there.
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 6:32pm On Nov 02, 2021
n3xt:
I know that building and I don’t know why it’s taking them long time to demolish it.
Own by someone close to Aso rock
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 6:30pm On Nov 02, 2021
EgunMogaji2:
Tilt?

Measured via sensitive instruments or naked eye?
Naked eyes. You will see it from distance
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 3:19pm On Nov 02, 2021
n3xt:
A 21 floor building on Gerrard road should have nothing less than 40 - 50m deep pile.

I’ll start from the company that did the pile. Did they actually achieve the recommended depth?

Those who know knows.
There is another building inside the Osborne Estate, about 6 storey building. The house is already Tilt on one side but they are trying to do another pile to support the building.
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 12:00pm On Nov 02, 2021
We are here to serve you better
Properties › Re: ABB Distribution Board And Schneider Distribution Board Our Choice by topsy23(op): 11:41am On Nov 02, 2021
Good afternoon
Properties › Re: ABB Distribution Board And Schneider Distribution Board Our Choice by topsy23(op): 12:06pm On Nov 01, 2021
God will help us ooo... Prices are going up again
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 12:00pm On Nov 01, 2021
Next project... Watch out

Alverton Estate Ajah..
12units of 4bedroom duplex for phase 1

Foundation on going .. gate house pipe work is 70% completed

Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 11:58am On Nov 01, 2021
Note, today is the last day
Properties › Re: Importance Of Proper Earthing And Bonding System In Electrical Installation by topsy23(op): 10:14am On Nov 01, 2021
CubixNG:
Indelec prevectron 3
Good morning
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 11:39am On Oct 29, 2021
megacontrol:
So what are the current prices for 1.5mm, 2.5mm and 4mm R/B/G?
They are yet to give us the new price .. we are using the old price
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 9:57am On Oct 29, 2021
Zzyzxt:
Pls I need the contact of a good architect to draw a building plan for me. Must be in Ibadan.
+234 706 295 1838 Call this Architect
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 6:23pm On Oct 28, 2021
Message from Coleman Cables


To Our Dear Distributors,

We are now giving official notice to all that Coleman Prices will Increase within the next week Tuesday. Please do not hold us to specific as we will stop when we have filled our orders.

All orders paid for, must be collect between now and the notice date of the increase which would be communicated only on short notice.

All orders paid for, will be honoured at the current price till the end of the day we give the new price.

We will communicate to all the new discount next week.

We thank you for your understanding

Management

1 2 3 4 5 6 7 8 ... 58 59 60 61 62 63 64 65 66 (of 212 pages)