₦airaland Forum

Welcome, Guest: Register • Login • With Google • Trending • Recent • New

Stats: 3,345,472 members, 8,517,688 topics. Date: Thursday, 12 November 2026 at 08:40 PM

Toggle theme

Topsy23's Posts

Nairaland Forum › Topsy23's Profile › Topsy23's Posts

1 2 3 4 5 6 7 8 ... 60 61 62 63 64 65 66 67 68 (of 212 pages)

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 6:05pm On Oct 16, 2021
ApolitiCal:
Please, experts in the building construction, what is the quantity of the metcopo aluminium required to roof a house of area 187.043msq?
Thanks.
CC money121
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 2:17pm On Oct 16, 2021
Happy weekend
Properties › Re: Importance Of Proper Earthing And Bonding System In Electrical Installation by topsy23(op): 2:17pm On Oct 16, 2021
Call us ....
Properties › Re: Importance Of Proper Earthing And Bonding System In Electrical Installation by topsy23(op): 11:28pm On Oct 15, 2021
Call us today
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 11:05pm On Oct 15, 2021
Call us today
Properties › Re: ABB Distribution Board And Schneider Distribution Board Our Choice by topsy23(op): 11:04pm On Oct 15, 2021
Call us today
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 11:03pm On Oct 15, 2021
Nice weekend ahead
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 11:00pm On Oct 15, 2021
Properties › Re: Electrical Piping Both Surface And Conduit by topsy23(op): 12:02pm On Oct 15, 2021
Enyinne:
Good day sir
Whats the latest price for coleman 1.5mm ,2.5mm ,4mm and 10mm .
Thanks sir
1.5mm 9980
2.5mm 16600
4mm 27000
10mm 65000
Properties › Re: Cost Of Building A 4/5 Bedroom Duplex From Fuondation Level by topsy23(m): 3:25pm On Oct 13, 2021
Imma4real:
Please someone should help me , how much will it cost to build 4 bedrooms duplex with two palour . Is very urgent contact me talktochidinma47@gmail.com
Budget between 45 to 50m
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 3:13pm On Oct 13, 2021
QSFemi:
Good evening all.

I want to write some notes on two terms that are not clearly understood in the context of construction contracts. I've said it here, times without number, that construction job is a contract either an expressly written contract was entered into or word of mouth agreement. As long as there is an offer to execute a job and a consideration (renumeration) for such job, a contract has already been established.

Construction job is very complex and complicated processes, as such there are bound to be issues during the construction stage. One of such prevalent issues is VARIATION. I've heard people use this word loosely, even in wrong context. So, I've make it my duty to define the word this night and differentiate it from another term that's confused for variation which is know as FLUCTUATION.

What's Variation?

According to Joint Contract Tribunal (JCT) 2011 with quantities, the term Variation means:

1) the alteration or modification of the design, quality or quantity of the works including:

(i) the addition, omission or substitution of any
work;
(ii) the alteration of the kind or standard of any of
the materials or goods to be used in the works;
(iii) the removal from site of any work executed or
site materials other than work, materials or
goods which are not in accordance with this
contract.
These are most recurring scenarios on site.

Fluctuation on the other hand refers to change in price of materials during the period of the construction contract.

Typical examples.

A change of window opening in the design to built up block work is an example of variation while the increase in the price of block from 250 during the contract bill preparation to 300 during the construction phase is an example of fluctuations.

NB: Variations in construction projects do not necessarily lead to increase in the construction cost.

These terms are very important in contract administration.

Let me stop here tonight.

Have a pleasant night rest to everybody here.
Thanks for sharing this.

If the contract is a fixed contract that means there would be no variation and 70-80% of the contract value must be paid so that contractor can get all the materials ready to avoid price increase.

But what of additional work added on site and the client is still claiming that the contract is a FIXED contract. What can someone do in this situation?
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 3:06pm On Oct 13, 2021
coldcandy:
My oga, how much should one pay for electrical fittings installation of a 5 bedrooms duplex (2 sitting rooms)?

Cc
twinskenny
Boss it depends on the type of fittings you are buying, Quantity and other factors

Also, remember the fittings you mentioned may include the underlisted items

-Light fittings (internal)
-Light fittings(External)
-Rope r strip light
-
-Switches
-Sockets
-Changeover
-Gear switch
-Cut out
-Termination of final sub circuit
-Termination water heaters

But you can budget between the range of 150-200k
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 11:34am On Oct 11, 2021
More pictures

Properties › Re: Please Help In Correcting Any Errors In This Plan by topsy23(m): 8:46am On Oct 11, 2021
Mikeeytools:
Please help In correcting any errors in this plan
It's a nice design. The architect did well.

We are available for MEP design.

WhatsApp 08033643191
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 8:39am On Oct 11, 2021
n3xt:
Yes.

I have a section of my building that wasn’t plastered nor painted, it was only cladded with aluminum sheet and I’ve never had any issues with it.
That's external wall right? But to me I would have love the to plaster the wall and leave the paint out
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 10:18pm On Oct 10, 2021
Liper LED light. Quality and Its German product

Call us today

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 10:06pm On Oct 10, 2021
Our recently final sub circuit termination. We pay attention Installation details and quality

Properties › Re: ABB Distribution Board And Schneider Distribution Board Our Choice by topsy23(op): 10:00pm On Oct 10, 2021
Let us handle your installation

Properties › Re: Importance Of Proper Earthing And Bonding System In Electrical Installation by topsy23(op): 9:56pm On Oct 10, 2021
Contact s us today
Properties › Re: Electrical Piping Both Surface And Conduit by topsy23(op): 9:53pm On Oct 10, 2021
Decking pipe work

Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 9:50pm On Oct 10, 2021
Call us for your original cables. Quality is our watchword

Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 9:26pm On Oct 10, 2021
Dallas court Ibeju Lekki

Completed today

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 9:05pm On Oct 10, 2021
somehow:
Addition to my dynasty.

Wifey just blessed me with a baby boy today.

The dynasty is swelling.

All to the glory of God.
Congrats boss
Properties › Re: ABB Distribution Board And Schneider Distribution Board Our Choice by topsy23(op): 8:49pm On Oct 10, 2021
Tsuccesssquare:
Good afternoon,

Kindly assist review the two quotation below for electrical piping for three bedroom bungalow. I noticed there is huge difference in their pipe price and DB price.

Electrician 1.
U box 3pack 2000 6k

Looking box 5pack 2000 10k

3by3 box 5pack 1500 7500

3by6 box 5pack 2000 10k

Cooker unit 5k

Coupler 4pack 2000 8k

Pipe 7bundle 11,000 77,000

Nail 500

Adaptable box 1500

DB 30,000

Workmanship 40,000

Electrician 2 quotation is below
What electrician 1 quoted for are all original but he can still buy 3x3 and 3*6 box a bit cheaper
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 8:28pm On Oct 10, 2021
Update Pictures of Wawa Arepo area project

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 10:09am On Oct 10, 2021
Rexology:
Finally I have parked into my house.What a feelings!.
I sincerely appreciate everyone here whom have been helpful in the process...you people are doing the Lord's work here.
Congrats sir
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 7:05am On Oct 10, 2021
rotecch77:
Some pics from the opening ceremony of our company branch (Arbo contractor Ltd) and Sula bakery today in Lagos

The kabiyesi, imam and others well wishers
Congrats boss. You sis not invite us to come and chop rice ooo
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 6:13pm On Oct 09, 2021
Omonjoe:
Hello my people, Please I need recommendations on good brand of paint I can easily get to buy in Edo state. Thank you for your help!
Cc: Gbadexy
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 8:50am On Oct 09, 2021
More pictures update later

Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 8:47am On Oct 09, 2021
We are here once again at citiview wstate, Wawa Arepo area

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 6:41am On Oct 09, 2021
n3xt:
I can’t find the link I promised to share but I think this should guide you:

1. Sandfilling
1. Electrical and Mechanical final fix
2. Electrical Wiring
2. Septic Tank /Soakaway installation
3. Aluminium Windows / Frames
3. Doors / Installation of subframes
3. Fence construction
4. Plastering
4. POP (Ceiling and Wall Screeding)
5. Ornamentals / Architectural Decos
6. Kitchen Cabinet / Wardrobes / Furnitures (should commence)
6. Balustrades and Railings
6. Tank Stand
6. Pressure Test (plumbing)
7. Tile Works
8. Painting (first coat)
9. Bath Fittings and Faucets (Bath, Toilets, Water Heater, Basins, Vanity Mirrors etc) (Quality range such as Kohler, Grohe, Delta, Moen, Rohl, Sigma preferred)
9. Electrical Fittings (lights, switches, sockets, spotlights, chandeliers etc)
10. Installation of Doors
11. Installation of Wardrobes / Furnitures
12. Cleaning
12 Painting (Internal/External)
13. Electrical Service Connection
14. Installation of electrical fittings
14. Post Construction Cleaning
15. Gate / Fence Rail
16. Electrical Fence Wire
17. HVAC/Generator Supply and Installation
18. Water Treatment Plant / Solar Water Heater etc
19. Automation /Smarthome integration
20. Flooring
21. Furnishing

I’ll do my best to explain this schedule in details on my personal thread on kobocity.com for easy referencing and to serve as a guide for DIYers and self-builders.

To many people everything is a big deal. To me, there’s always an ideal order.
Correct
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 10:33pm On Oct 08, 2021
Thanks for your patronage

1 2 3 4 5 6 7 8 ... 60 61 62 63 64 65 66 67 68 (of 212 pages)