PropertiesRe: Alternative Building Material (expanded Polystyrene) by abdulwastecx(m): 7:31pm On Apr 07, 2017
Teewhy2:
That is good, still expecting more response and contribution from my other ogas. spyder880 the parapet master (Lol), use to read about you talking about various types and construction of parapets,
engr. abdulwastecx i saw this your post in which you have used it, can you tell us more and do you still use it.
https://www.nairaland.com/2787541/harney-project-renovation-work-nairalanders/2
Thank you o bross. I think polystyrene is a very good material, it is a matter of time before people start using it in large quantities.

I have an ongoing job that I am the consultant and I proposed the use of the polystyrene for the slab (waffle slab) because of its light weight and cost effectiveness.

I am also working on a large scale low cost housing scheme where polystyrene will be sue for the flat roof and some interior designs at these stage we are still looking for investors to key into this initiative.

I am ready to go into detail discussion with whoever wants to use polystyrene for any type of work.
PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 8:00am On Mar 26, 2017
ceelog:
Abdul (Harney Projects). Innovative. Technically Sound. Honest. I have no regrets, not even one when I chose you guys. Keep up the good work. The sky is the starting point for you guys.
Thanks sir... My two weeks in imo state was great and all those fun we had in Enugu state, it was a really good experience... Looking forward to come back in future, you were really a good host, client and a big brother friend. Thank you sir
PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 11:21am On Mar 24, 2017
Barryton:
Wow!!! this work is extremely neat...kudos podosci & abdulwastecx..
Thanks boss
PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 11:20am On Mar 24, 2017
bplenty:
@abdulwastecx

Damn! This build is insanely sick. Good job mate and Good on ya. So contracting you for mi next build.
Thanks boss
PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 1:39am On Mar 24, 2017
More updates of block work up to lintel level

PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 1:36am On Mar 24, 2017
More updates of block work

PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 1:34am On Mar 24, 2017
More updates

PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 1:28am On Mar 24, 2017
Ground Floor block work

PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 1:26am On Mar 24, 2017
Block work

PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 1:24am On Mar 24, 2017
Dilyschigo:
I believe beam was introduced to the fence because of the water logged soil?
Yes
PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 1:24am On Mar 24, 2017
Marilo:
All 225mm?
Mostly 225mm
PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 7:47pm On Mar 23, 2017
Marilo:
So far so fascinating!

What is your projection of the number of sancrete blocks for the groundfloor?
We are looking at around 4500 blocks for the ground floor.
PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 7:12pm On Mar 23, 2017
Continuation columns for the ground floor.
Main reinforcement for columns are 4Y16
Length of main column reinforcement = 4m
Spacing of rings = 175mm
Diameter of rings =Y10

PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 7:08pm On Mar 23, 2017
Completion of the dpc level/raft slab.

PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 6:30pm On Mar 23, 2017
Aventures:
Nice Job my brother, honestly I salute your in depth knowledge of structural design and ability to transmit it to physical construction. I took time to run thru the thread page by page Good job so far.

Just few questions, did you vibrate the ground beam, form work at 1.8m and almost no bulging as far I can see, using our local planks seems a miracle to me, if vibrated then your carpenters are superb and your supervision awesome.

Please did you supervise the independent soil engineer that conducted the geophysical test, can you share the lithology of the soil just want to have the idea of what the land in that area look alike.
Thank you sir for the positive review, it is nice to hear that from a senior engineer and one of the best in the business.

Building a raft beam of six board (1.8m) is very challenging and it is the deepest casting we have done so far. One will need to do the formwork very well.
We make sure that the wood used for the formwork were very strong ( we bought the wood from ondo state), we use binding wires to bind the beam at three different point in each of the beam and we use about five vertical 2 x 4 across the beam to have a rigid formwork.
We employ the use of vibratory but we make sure that we didn't over vibrate the beam.

I didn't supervised the soil engineer but I have some one on ground during the soil investigation and as you know the results are mainly gotten from laboratory tests and calculations carried out by the engineer in his lab the lab after 2weeks or one month, this which we have no control over.

We also did our due diligence to look around the estate for similar structures in other to know the type of foundation employed and the resulting structural problem if there is any. However, all the building in estate were founded on raft foundation of similar dimensions ranging from four boards to six boards and non of these structures had experienced any form of differential settlement or structural failure. We, then concluded that the result of the soil test confirm to our little physical observation.

I will try to attached the recommendation of the Geotechnician of the type of foundation to be employed
PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 6:39am On Mar 23, 2017
phiszo:
Wastec my boss.

Granite: crushed aggregate from the quarry.
Gravel: uncrushed aggregate (weathering of rocks)
My oga long time?

How your master program for ilorin, we missed you guys o
PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 6:36am On Mar 23, 2017
Shawls:
@abdulwastec

I'm watching this project with eagle eyes shocked and will reserve my comments for later.You know what I mean, right?
I know what you mean ma.... I hope you will give a positive comment later?. Thanks ma
PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 2:47am On Mar 23, 2017
olumide4christ:
Sorry....but the 1st picture is granite while the 2nd is gravel...take note.
sorry... you are wrong, the first picture is gravel while the second picture is "all in one coarse aggregates'' ...take note
PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 11:46pm On Mar 22, 2017
Marilo:
A little bit of confusion....I have always known the first picture to be granite and the second one gravel.....Thanks all the same
The first one is a gravel which is a coarse aggregate with a uniform sizes of not more than 19.5mm (3/4). The second type is a all in one aggregates ( a combination of coarse, fine aggregates and dust) this may occur naturally or from a rock
PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 10:49pm On Mar 22, 2017
oyb:
actually, it is doable with wheel barrows as you said. mark your 300mm levels, pour the sand and spread .your challenge would be the actual compaction - but that can be achieved with a plate compactor or even the local wood compactor. the roller was overkill for the foundation [imho].
Oga that is your opinion. Thanks all thesame
PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 10:40pm On Mar 22, 2017
oyb:
my understanding is that for best results, your compaction should be done in 300mm layers; as in fill to 300mm ; compact fill to another 300mm; compact again


whats the distance between the fence and the building? i am trying to remember LASPAA requirements/guidelines. for commercial buildings gap is supposed to be 3 metres between fence and building - or maybe even six metres. i do not recall the standard for residential
The distance between the fence and the building is 3m and that is the local requirements.

The best results will be to compact the soil in layers but that will be impossible to achieve considering the fact that the filling was done manually, you will need and excavator to to lift the soil into the rooms to compact in layovers of 300mm.

The method use involved filling the out room first, then sand are moved to the inner rooms using wheel barrow.
PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 10:17pm On Mar 22, 2017
Casting of raft slab /dpc/German floor

PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 10:15pm On Mar 22, 2017
Marilo:
1. I would expect a project of this magnitude would require granite instead of gravel.Can you explain why you chose gravel instead?

2.I want to believe Portland Dangote cement is a mistake or is there an hybrid of portland and dangote cement in the market?
What people in the south called granite is what I called gravel. I mean coarse aggregates.

All the cement we use for concrete batching are called ordinary Portland cement. So, ordinary Portland dangote cement is the cement we buy commonly around which comes in a bag of 50kg
PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 10:07pm On Mar 22, 2017
Placement of raft slab reinforcement :
A brief description of the reinforcement pattern.
Since, most of the slabs are two - ways spanning slab, the support reinforcement are placed at the bottom in accordance to the structural details while the span reinforcement are placed on top.

The spacing of the slab is 250mm center to center and the still employed are 10mm high yield bars and 12mm high yield bars.

We have a spacer to separate the bottom reinforcement from the top reinforcement.

PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 10:00pm On Mar 22, 2017
Application of damp proof membrane and a screed of 50mm to 75mm before placement of raft slab reinforcement

PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 9:57pm On Mar 22, 2017
After the foundation filling was completed, the filling was wet several time and allowed to consolidate for ten days before a large hand held compactor was used to compact the foundation for two days.

PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 9:54pm On Mar 22, 2017
More foundation filling

PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 9:51pm On Mar 22, 2017
Filling and compaction of foundation: the filling was done using '' yoyo'' a sand with considerable sharp.

PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 9:48pm On Mar 22, 2017
AngelicBeing:
Following, so far so good, excellent foundational work going on here, when you see competent Engineers, you dont need a soothsayer to tell you because the work speak for itself & my latin friends will say >> "res ipsa loquitur" , if l will be recommending an Engineer from Nairaland to my friends & family members in my base currently outside Nigeria and who wants to have a home of theirs in Nigeria, this guys will definitely be on my list l will present to them, l can only wish the owner of this project and the team of Engineers all the best as they construct this edifice. wink cool
Thanks sir
PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 9:48pm On Mar 22, 2017
Striking of formwork after 24 hours

PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 9:37pm On Mar 22, 2017
Casting of the raft beams.

PropertiesRe: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by abdulwastecx(op): 9:34pm On Mar 22, 2017
On the day of casting : arrival of materials.
We have two trip of 30 tonnage gravel, three trips of 20 tonnage sand, 500bags of Portland dangote cement and 1 trips of stone dust.