You may engage the service of another supervisor and let the Architect visit to confirm they are building to his design flows and pay him for those visit and don't mind the person saying they can do it for 750 k its a 3 floor building with lot of commercial activities . For you to have another great cost reduction in supervision is determined by how many month the project will last for .. For people asking what is the work of the supervisor don't understand you are investing a huge some of money and any error may lead to collapse of building or a non aesthetic hostel which is more of a selling point to your hotel(business) Take quote from other builder Engineer and architect and compare. If he stands on the 3m and u have it employ the service of 2 or the 3 of this people A builder A structural Engineer visiting & approval An Architect more visit and approval |
megacontrol:Good morning yes. payment on delivery current price local 285,000 per tonnes TMT 335,000 per tonnes price include delivery to site lagos ' We now offer a flexible option which is more cheaper you pay directly to the company i collect the teller and load your goods directly to site. for this TMT 320, per tonnes local 270k per tonnes binding wire is 8,000 whatsapp or call contact check my signature pls |
uncleteeh:you only typed beware sir, without giving proper reason just curious to know because this reply seems to confuse me more than the original poster self |
Prices updates,,, local #280,000 TMT #335,000 NB this local is not up to gauge this time around I will call 10mm (9) and 12(11) etc |
raymondFirstborn:Following like I ve said for us not to derail this journal. How much is block and cement along that axis |
raymondFirstborn:There's nothing like hidden beam and the cantilever does not satisfy code requirements . Truly you may follow the drawing but its wrong and satisfied by a coren registered engr is not a rule. Reason he's trying to play safe with the hidden . he could have drop the beam and POP it underneath or satisfy the code requirements for the cantilever slab by returning the bar appropriately. I get he's trying to save cost by not wanting you to break the slab behind by almost 50℅ . Saying it's not load bearing is also bending the rules oo By the way clean job following |
n3xt:Sure when we see how things unfold hopefully you get from us one day. |
n3xt:10,000 naira increase today on TMT TMT 335k per tonnes Local 275k per tonnes Yesterday price TMT 325k Local 275k For tomorrow only God knows that Price include delivery to site when fuel price increases as projected both will inflate more on transportation and cost of production |
project supervision Is around 5% of total project or 5% of stages you intend to do.. this can be negotiated Price varies on scope and technicality of the said project |
Rexceedo:Labour fees depend on location. Other form of negotiations is tricky if they quote cheap you don't expect a good grade concrete etc If they quote high doesn'twarrant a good job likewise ![]() Supervision fee is always of preference to a particular person if its not a firm handling it. So look for Someone create a good business relationship. How much is okay depends on scope of work terrain and your site personal challenge's . maybe a sketch can gve d assumed cost if u have |
Rexceedo:If you pay for labour who will supervise the building and read out all drawing in relations to another and also look out for conflict. If you have the fund gve it out to an engineer Or contact a Quantity surveyor get all materials on site and pay for the supervisor service fee and negotiate labour |
abcivilengr:1.85m or so SAFETY CONSIGN Take note of all loads acting on it and if there's any partition on such slab it must be account for .. if a partition is not on the architectural drawing pls assume there's and load the edge of the cantilever because the design maybe review during construction The detailing aspect is crucial the tension bar should be return by 1.5L of the cantilever span.. Its safe and possible when design properly.. cost wise If you not really comfortable with it and wall load will be aligned to the edge use upstand beam this will reduce the depth of the slab and other sections because initially u will have a dipper beam section to counter the effect of the cantilever. |
hairbyuj:local per tonnes is 260, 000 TMT 315,000 Price include delivery to your site (LAGOS) @n3xt thanks for the Mention |
updated price for steel local 260, 000 TMT 315,000 All prices include delivery to lagos site only. |
segzyfunmi:No one will do over site conc. at that rate some practical reason . Cost of boarding the edge (carpenter will charge you) The carpenter still needs to be there should in case of unforseen event Cost of machine and operator If you settled for hand mix Manson will charge more to mix. Over site conc. Mix becomes harder heavier than just blinding When labor hear concrete forget it they will likely not take 1500 except all stages of work is guarantee for that gang. Like next said share your plan or gve this project to a Q's to quote for you |
diordaves:BLINDING COST 35K y is casting of german floor now 10k pls guide me . |
segzyfunmi:The 3 million is to what stage of work I like the idea of strip footing also.. Get the structural plan and Architectural plan and give to this thread member quantity surveyor . Let him quote in stages for you. Maybe by Friday I will relocate come Abk to handle this job for you sir according to the specification quoted ![]() My love for Abeokuta |
PrimeQuay:Good morning updated price for today including delivery to site Tmt Tiger 315,000 per tonnes Local 265,000 per tonnes |
megacontrol:Ok i will explain the 20mm for maximum aggregate size is no 6 in the general note you uploaded ..I did not use cover to determine this .you will notice the cover for your foundation , beam, column , are all different because this are major element as an example the reaction of the soil can have some great impacts on the concrete which may attack your rebar and this will lead to loss of strength, this cover is determine by ground conditions for column/beam etc weather condition and fire rating to protect the reinforcement one of the advantages of concrete building though.. i think 3/4'" down should be in the range of 3/4"' to 1/2" sieve varying . I stand to be corrected though |
megacontrol:size of aggregate use is always determine by the clear cover of your structural member , check your general note you will notice the size of aggregate for each structural member.. in most cases we use 20mm coarse aggregate after factoring the cover after placing your rebar(iron) for you not to high have pores which leads to weaker members at times... contractor then prefer to go for lesser size for some reason clean job because of workability problem with higher size of granite, when they use this granite size it makes them save in labor cost due to time and more job recommendation because you see everything when the formwork is removed comes clean .. in your own case for now any structural discussion one have to have a clear scope of work before giving advise do you have beams you want to cast together with this slab and what size is the width and how many number of reinforcement do u have at top and btm . how close are you to a fire station ? ![]() purpose of structure? for you to have a 175mm slab we may likely say deflection plays a major role in your build also .. in any ways pay attention to workability and don't go and cast grade 15 in the name of making concrete workable. |
stevemims:Local is 260k per tonnes including cost of transportation to site Lagos Axis only for the transportation cost included @n3xt thanks |
TMT as at this morning (09/01/2021)is 325k per tonne Local is 265k tonne Price include delivery to site |
kingzsoul:Sorry for the late response TMT as at this morning is 325k Local is 265k Price include delivery to site (Lagos) |
michlins:Current price Good morning to you Sir, TMT as at this morning is 325k Local is 265k Price include delivery to site Previous price TMT/HITECH N 320,000 per tonnes LOCAL N 275,00 per tonnes. |
aji2000:i can recommend one for you send the measurement yusuf 09030324890, 08120050803 |
Good morning , I made contact with one of our major reinforcements (steel ) suppliers, we had the following agreement to supply adequate sizes and result. For the local we will request from the company or probably take it to LSMTL . current price TODAY TMT/HITECH N 320,000 per tonnes LOCAL N 275,00 per tonnes. Price inclusive of delivery to anywhere in lagos. WHATSAPP/CALL 08103776089 https://www.nairaland.com/6351429/buy-reinforcement-iron-rod-us
|
Good day we sell and deliver reinforcement direct to your site anywhere in Lagos Reinforcement are of full gauge current price TODAY TMT/HITECH N 320,000 per tonnes LOCAL N 275,00 per tonnes WHATSAPP/CALL 08103776089 PRICE INCLUSIVE OFF LOGISTIC TO LAGOS SITE ONLY note thread will be updated when there's an increase in price generally
|
folmus:Some distributor's already carried out this test from where they pick from and you may request for such result . if you are not satisfy take it to any available lab yourself. |
Good morning all, On the issue of reinforcements using local bar , TMT et all., and the cost implications ,strength.. The designer of any structures choose the grade of steel he/she intends to design with, this grade will be clearly written at the 2nd page (general notes) or on each page footer of the S.Drawing, the implications of this grade choose for your project will determine robustness , number of required required reinforcements in each structural member Lay example below. If I use 410n/mm2 say column of (230x230mm) for a duplex it may requires 6 nos of T16mm and use grade 460 for same column it will require 4 no of T16mm (assumption), the implications of this is that if baba lati supervise for u he will do the following 1)Tell you he built same thing at honourable place @ lekki they use 4 No's of 16mm and the structure is still standing till today. 2)This Engr is not considerate 3) charge you for same 6nos and put 4 No's inside, And cast forgetting or lack d knowledge of variables and notes in the Drawing. To the main discussion we have various kind of steel in the market , which most are very bad and good only known brand can easily be passed , most of all this local steel of unknown origin are having same properties as plain bar(unthreaded bar (that iron we use for burglary then)) .. How do you recognise all this in d open market? Its difficult for small project since u will b procuring ur steel in batches and from cheapest source available ,u will likely not run a tensile strength. Large projects and mindful owner (contractor) make use of standard and mostly consultant is always on site contractor will b mindful else he will waste money when ask to break concrete and re do and he looses credibility gradually because during next meeting on a job and such contractor name is mention we strike such out without d company knowing self. Summary Buy iron brand that's traceable with clear identification on it Never reduce or propose what's not in ur drawing without ur designer consent Quantity surveyor should always quote reinforcements using quality brands price because contractor will not buy TMT when u quote local to make thing's cheaper TMT is good , local is likewise good if you are running a test or buying good one |
michlins:You made mention of the foundation, how do you calculate this load and transfer to the said foundation ? Wind is a major factor too. Reason same materials may not work is because of wind I will gve a brief lay example below.. If you build close to sea or open up area or hill where no winding breaking occurs at much such section may likely not work except for proper bracing compared to building such stand at Ikeja where its relatively developed or behind ur building.. The base plate, stiffeners, bolt ,welding even painting are all recommended. The reinforcements in the foundation how do you go about it? Do u know which is the main direction, do you know where to splice your section or how to connect back such. From your believe what engineer does is use same section change the wind pressure to see if it works and check the load against the Soil bearing capacity of same area Sir it work's u r good to go if it doesn't adjustment comes in and modification Sir. I will provide you with your next 3 project on this tank stand drawing free since I notice this is what most people want to contract your service for here.. You will make a good fabricator since you are technological inclined , https://www.nairaland.com/3522155/iron-tank-collapses-secondary-school
|

and you translate that to granite sizes, it appears to me like both 3/4 and 3/4 down qualify since that's 0.75" when converted. 