₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,331,281 members, 8,449,566 topics. Date: Wednesday, 22 July 2026 at 01:59 AM

Toggle theme

Aventures's Posts

Nairaland ForumAventures's ProfileAventures's Posts

1 2 3 4 5 6 7 8 ... 18 19 20 21 22 23 24 25 26 (of 60 pages)

PropertiesRe: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Aventures(m): 7:36am On Nov 12, 2014
blink182:
All wall screeding jobs I have seen are very distasteful. Eventually the screeding peels off with the paint on it. Is this how it always is?
With good plastering with brush finishing you do not need POP wall screeding except for washable satin paint which requires POP screeding by manufacturers standard. I have succesfully convinced some of our clients on this and they never have any regret as they have the same satisfaction they were envisaging while proposing the screeding, after we painted without the POP screeding. This is one of the recent painting we did without POP screeding underneath.

In any case if you are not too satisfied with your plastering finishing you can do some surface preparation for the critical areas. Apply screeding with the combination of portland cement and top bond then sand paper it thoroughly.

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 6:13am On Oct 29, 2014
twinskenny:
weldone boss... are we to expect any invitation on this one? grin grin
I wish we should invite you but this project is for commercial purpose
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 10:14pm On Oct 28, 2014
more

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 9:02pm On Oct 28, 2014
eaves finishing
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 6:46pm On Oct 28, 2014
still on

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 6:32pm On Oct 28, 2014
more

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op):
external plastering ongoing
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:48pm On Oct 27, 2014
update
pics

PropertiesRe: Construction Diary: Building a Duplex on the Rocks. by Aventures(m): 6:58pm On Oct 19, 2014
bros congrats on this new project. you just dey rock ib shaaaa nice one anyway. meanwhile I'll report you to govt except u settle me asbu settle dos boiz lol, I am reporting you to for using a track wheel excavator on a tar road, if na lagos we get eru iku guys that will bring this down in a jiffy they just pull down 3 storey building down for us some where though not too advisable ur method is far better
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 9:09pm On Oct 18, 2014
this is Daniella

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:29pm On Oct 18, 2014
POP work also in progress

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 12:13pm On Oct 18, 2014
paragon PVC ceiling frim Amoula Ventures Ltd installation in progress

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 10:11pm On Oct 17, 2014
more

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 10:07pm On Oct 17, 2014
work updates

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 7:57pm On Oct 16, 2014
pop, pvc ceilings and electrical cabling all going on simultaneously.

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 7:53pm On Oct 16, 2014
kopell:
@Aventures, answer fastshipping question now. I have similar question and who make them.
sure I will I am trying to give him something comprehensive that would help him budget properly

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 3:16pm On Oct 16, 2014
plastering pics

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:46pm On Oct 14, 2014
allen0000:
Normal foundation as the land is dry, not a water logged area, I need cost for the carcass, materials, labor, Paraphet, roof cost ( aluminum and stone coated) including plastering in and out
sir u may need a QS for this ur request. I may not be able to do this. Tx
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 3:19pm On Oct 14, 2014
door sample

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 3:08pm On Oct 14, 2014
allen0000:
Adventures, please am about to start this project, so soon, please can you help me out with the total cost of this plan, i will appreciate if you will list it out stage by stage and materials, like how many blocks, iron road, cement and cost to roof, deck only, windows and doors if possible
the first is ground floor and second upper floor, is a duplex and a wing of 2 bed room flat. the drawing is not out but this is how the building plan will look like and measurements
what type of fdn are u proposing fir this structure, knowing that I can only give u a budget fir the carcass.
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 3:54pm On Oct 12, 2014
Thanks Hajj for your prompt response and clarification.
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 3:28pm On Oct 12, 2014
FastShipping:
ATTENTION!!
Hajj and other moderator should immediately delete the above post and ban the poster. The poster has been spamming threads after thread with his nonsense
.
hello are you really sure you mean this post or it is just a mistake, if you mean this can you please shed more light on how i have been spamming threads after thread with nonsense please this will help me a lot cos i am lost i don't understand how that could be happening. Thanks
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 1:14pm On Oct 12, 2014
our steel doors sample
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 9:18pm On Oct 11, 2014
FastShipping:
Great job by you.
What is the size of the roof in sq.mt?
Step tiles long span Aluminium roofing sheet 590

Flat Sheet aluminium for Ridge Caps, Gutter
Eave angle 75
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 9:10pm On Oct 11, 2014
allen0000:
Oga weldone if I may ask what is the size of the rooms, sitting, toilet and kitchen. How much do you think it will cost to deck a building of 9.901 x17.700
Thanks
Our room sizes are 10ft x 12ft, 12ft x 12ft, sitting room is on average of 15ft x 18 ft.

Concerning the decking you ask budget between 2.5m to 2.8m
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 5:39pm On Oct 11, 2014
window burglary delivered

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 12:48pm On Oct 11, 2014
FastShipping:
Great job by you.
What is the size of the roof in sq.mt?
aluminium is measured in meters I will check my record and revert.

Thank u all for appreciation
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 9:13am On Oct 11, 2014
Dear all,
i promised to give out the summary of stages expenditure on this project, kindly find this below:

A. Foundation (strip and Pad fdn with some special attention) = N= 2,907,100: 00 K

B. Ground floor pillars, suspended floor slab and beams = N= 4,0006,500 : 00 K

C. First floor pillars, first floor and grd floor block work, roof
beam, roof tank slab and wall (2Nrs) Grd and first floor
lintel work = N= 3,276,400 : 00K

Total sum for the structure Carcass (excluding roofing) = N= 10,190,000: 00K

Initial Budget at the inception of the project = N= 11, 147,500:00K

Several other works as taken place and still ongoing, such as roofing and its covering, window fabrication, burglary fabrication, Procurement of paragon PVC ceiling from Amoula ventures, POP casting ongoing, plastering ongoing, wardrobe frame and steel doors fabrication ongoing.

For the benefit of those that has been asking for the cost of roofing in particular pls find it below:

Roof wood carcass and Noggins (Melina wood) procurement and labour = N= 853,500:00 K

Roof covering 0.55 gauge Aluminium long span step tiles
(Qualitec Product) = N= 1,072.936.56 K

Total =N= 1,926,436.56 K

Total Sum for Carcass of this structure (roof inclusive) = N= 12,116,436.56 K
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 10:36pm On Oct 10, 2014
segcymoor:
Bros It seems we wan do Xmas here. ....
see neat plastering
bros na so we want to"warm" this house by November ending LOL. May God help us.
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 4:55pm On Oct 10, 2014
FastShipping:
Yet no details of the roofing as you promised few weeks ago......
I once sent you an email after someone recommended you here but you acknowledged it but didn't reply as promised. Luckily I found someone else on this forum.
shai! poor me I am very sorry for that I never wish to loose such opportunity probably I was engrossed in some activities that made me to forget. pls pardon me. I will post the cost update today it is a promised at least to roof level.
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 3:26pm On Oct 10, 2014
more pics

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 3:20pm On Oct 10, 2014
pics

1 2 3 4 5 6 7 8 ... 18 19 20 21 22 23 24 25 26 (of 60 pages)