PropertiesRe: Construction Of Six Unit Of 2 Bedroom Flat At Lekki Ajah Lagos State. by Aventures(m): 7:56pm On Mar 16, 2015
lafolabi:
Concrete slab and beams are coming on it. Is a weast of materials to introduce the lintel round the building when beam and concrete slab is coming on it.
That is true a ring lintel beam isn't necessary in a framed structured storey buildings, but very ideal in a bungalows. Though in the early building system whereby storeys building are built without beam but just slabs alone then ring lintel beam is a must (definitely not a structure built in swampy area or where settlement may be uneven) such structure is called load bearing wall structure, in this case the wall (either sandcrete blocks or bricks) must be a very strong and meet structural standard required.
As a matter of fact about 7 yrs ago I supervised a storey building guest house of about 56m x 12 m built with this method on a very very firm ground with a special made block produced almost a year in advance beforvthe commencement of the project
PropertiesRe: Construction Of Six Unit Of 2 Bedroom Flat At Lekki Ajah Lagos State. by Aventures(m): 5:09pm On Feb 20, 2015
Nice job
PropertiesRe: Construction Of 2 Storey Building At Osapa-lekki Ajah. by Aventures(op): 8:30pm On Feb 19, 2015
Adewunmismith:
Good Job sir,i would really love to work with you.
Thanks bro. Hope to talk to you soon most if our work are still in pipeline.
PropertiesRe: Construction Of 2 Storey Building At Osapa-lekki Ajah. by Aventures(op): 10:30pm On Feb 18, 2015
prior to the concreting flushing of the floor was done to remove dirts and unwanted sand

PropertiesRe: Construction Of 2 Storey Building At Osapa-lekki Ajah. by Aventures(op): 10:28pm On Feb 18, 2015
more of grd floor slab rfct detail and concrete work

PropertiesRe: Construction Of 2 Storey Building At Osapa-lekki Ajah. by Aventures(op): 10:26pm On Feb 18, 2015
Pictures of grd floor slab reinforcement detailing

PropertiesRe: Construction Of 2 Storey Building At Osapa-lekki Ajah. by Aventures(op): 10:20pm On Feb 18, 2015
Dear all after deeming it fit to revisit this thread to upload the recent work done on the first slab i discovered that much of the previous pictures as not been re loaded after the cyber attack on Nairaland January 2014. So i want to quickly load some pics of previous work so that there could be a connection with the recent work.

PropertiesRe: Urgent Sales Of A Plot Of Land For Sale @ Ogudu G R A For 25m Asking + C Of O by Aventures(m): 11:18am On Feb 18, 2015
can we see the pics of the and the surrounding. then what is the best price.
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 10:03am On Feb 13, 2015
mufutau55:
Thank you very much Aventures. You are always very professional and with informative reply.
Hajji M.
you are welcome sir
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:21am On Feb 12, 2015
mufutau55:
Lovely.. wish we can see more... I have always wanted to see your color combinations. Thanks.
Aventures, do you remember the price for those "Fire Extinguisher" in your lower picture, very needed in the kitchen.
Hajji M.
tx hajj. we bought the fire extinguisher 6kg for 5k installed for 0.5k. fire extinguisher, goog security, well tidied up electrical installation (we have our power recline cable from the pole run in separate pvc pipe underground) well arranged meter board with adequate ceramic breakers are all good add ups to give you a well bargained insurance premium.
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 9:22pm On Feb 11, 2015
Pics of Part interior and a closer shot of the balcony

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 2:31pm On Feb 11, 2015
barakah:
Oga Aventures!
Please precisely which part of a building do you recommend the PVC for?
The Amoular PVC seems to be different from the regular PVC in dimension, size, measurement etc.
How do you determine the number of bundles or sheets required for an area of the house?
Do the regular PVC also require the accessories for installation?
any where you choose except kitchen. Amoula comes in 0.2m x 6 m=1.2sqm so if you space is 12sqm the you need 10 strips + all PVC require accessories.
PropertiesRe: Biofil Toilet Digester An Alternative To Septic Tank In Flush System by Aventures(m): 8:24am On Feb 11, 2015
diran18:
Send ur email address if interested d pics r too heavy
abidoyventures@gmail.com
PropertiesRe: Storey Building Of Mini Flat For Sale At Oriola, Alapere, Ketu by Aventures(m): 9:20am On Feb 10, 2015
More info and pics. I av an intrested client
PropertiesRe: Biofil Toilet Digester An Alternative To Septic Tank In Flush System by Aventures(m): 9:17am On Feb 10, 2015
Pictures speaks louder than long explanation. Good innovation though but need to be convinced with more demonstrations of how the stuffs work. Tx
PropertiesRe: Construction Of Six Unit Of 2 Bedroom Flat At Lekki Ajah Lagos State. by Aventures(m): 1:03pm On Feb 01, 2015
lafolabi:
Aventures have touch the point. Thank you Engineer.
this are some of the things we do for best results in construction.
1.quality materials.
2.close monitoring plus relentless supervision.
3.lastly. dont live your site for workers, always be in charge. otherwise they mess it up.
God bless you all.
you are welcome. keep the good work up. I hope to run some collabo wt u in some project soon. I like your workmanship spirit.
PropertiesRe: Construction Of Six Unit Of 2 Bedroom Flat At Lekki Ajah Lagos State. by Aventures(m): 2:23pm On Jan 31, 2015
mufutau55:
That generalization is not right, we have many competent bricklayers in Nigeria.. you just need to find the right ones.
You mean to tell me there are no bad bricklayers in Togo/Benin? Not so.
Hajji M.
on point sir. besides I can see a touch of thorough supervision and that is ine thing I know the OP for.
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 11:15am On Jan 29, 2015
Try Godson on 08086026607 just tell him you got his contact from engr Niyi.
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:33pm On Jan 22, 2015
micbjrex:
i want to do a concrete tank stand with 4 pillars of 12ft each, will have a 7ft x 7ft slab with 6 inches thickness atop. The slab will be able to fit a 3000 litre Geepee tank. Below the stand, blocks will be used to create a generator house. Please help me scrutinize the quote that I got below. Thank you all.

20 pcs of 9 inch block N18k
20 bags of cement N37k
1 load of gravel@ 14k
1 load of sand@N8.5k
mason labour N40k
15 lengths of 12mm rod N1.2k/1 =N18k
binding wire N500
welder labor N8k
1x12x12 planks 25pcs N17.5k
2x3 planks 4pcs
nails N1k
carpenter labor N10k
Total=N173,700 is this reasonable?
it seems ok except for 20 blocks for 18k that looks questionable. pls try and use granite instead of gravel.
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 7:40am On Jan 22, 2015
Chekitaut:
Wonderful project...
Thanks
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 6:39pm On Jan 21, 2015
egin:
where did you buy the fence light and how much? Thanks
mufutau55:
the lighting fittings were all purchased and sent from UK

Aventures.. this your long absence and no photo update is killing some of us, your followers oh!
But all in all, good work on all the accomplishments, may be one day I will have enough fund to engage you too.
Keep up the good work and congrats. Very lovely building.

Hajji M.
sir we had to stop posting pics for a reason. sorry for that. Thanks so much for the compliments.
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 3:09pm On Jan 21, 2015
We want to Give God The Glory for the Success of this Job.

And to all our followers we say Thank you.

RomanceRe: How I Almost Slept With A Married Woman by Aventures(m): 5:53pm On Jan 17, 2015
OP thank God for your courage, that lady is on evil mission take it or leave it but that is just the truth.
PropertiesRe: Construction Of 4 Bedroom Duplex In Benin by Aventures(m): 1:21pm On Dec 29, 2014
Barezzi:
Quick question, from the attachment, what does "16Y1010-200 c/c links" mean? See column CT1
if the OP please permit me to answer this. I like people willing to learn.
it means 16 pieces of 10 mm rings in each column. then the second 10 means bar mark number it is used in identifying the bar in bar bending schedule. 200 C/C means 200 spacing btw each ring.
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 6:49pm On Dec 26, 2014
barakah:
@ Aventures:
(1) Is the installation of the PVC ceiling also done by Amoula Ventures, do we need specialist installers for PVC ceiling?
(2) Whats the average number of strips required for a regular bedroom say 10 X 12
(3) Is PVC ceiling suitable for kitchen considering the heat from the cooker?
(4) POP installation for living room, any contact you can recommend?
the Installation was done by our carpenter. The pvc is not good for kitchen POP is better concrete is the best. You need about 9 strips and 4 clips for 10 x 12 room. POP contact 08067848083 Ayo.
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:38pm On Dec 25, 2014
mufutau55:
I can't see no picture update oh! Your picture is not showing.
Hajji M.

PropertiesRe: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by Aventures(m): 9:47pm On Dec 24, 2014
yea Buddy! Congrats.
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 7:18am On Dec 24, 2014
update

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 7:14am On Dec 24, 2014
WE WISH ALL OUR THREAD VIEWERS, CLIENT AND ALL OUR WELL WISHERS A MERRY CHRISTMAS AND PROSPERIUS NEW YEAR IN ADVANCE.
PropertiesRe: Construction Of Six Units Of 2 Bedroom Flat At Ajah by Aventures(m): 1:35pm On Dec 21, 2014
@lafolabi this tread is getting mixed up. U re posting your previous work with new one. while not give us the Genesis of this ur 6 flats of 2 b/rm and concentrate on this. or better still open another tread for this ur previous work.
Nice block work .
PropertiesRe: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by Aventures(m): 8:35pm On Dec 10, 2014
yongnoble:
I have been following this thread from the sidelines, I usually do not comment much on topic, I rather prefer to just sit back and watch. But it seems your question has not been properly answered.
Responding to it, basically the traditional suspended floor of mass concrete usually works on the basic principle of designing the slab to be able to carry its own weight (dead weight) plus live weight (humans/furniture etc) and these loads are transferred to the corresponding beams and then to the columns before finally to the foundation below.
However, this type of floor where hollow clay-pots (red bricks) are used is referred to a Ribbed Floor. Like the name implies, basically its a system of constructing several little "T" like beams to form a rib system. These little "T" combined together forms a flat surface "-"at the top and the rib hangs below "|" .
Lets take 10 "T"s for example and arrange them in an array thus
"TTTTTTTTTT"
you can clearly see that the top of the "T"s forms a flat surface, which is the slab and the bottom parts leaves a rib like structure of with voids(empty space) in between them. What you see with the clay-pots is an attempt to fill up those voids so that it can be properly dressed and plastered but the truth is that those bricks are not structural members (ie they do not carry/transmit any loads). As a matter of fact, the floor would still hold. It would even be stronger because these pots are actually imposed loads on the slabs, apart from bearing it own load and the live load, it still has to carry these bricks (though the self weights of these bricks are considered during the design). So logically, it would mean that if these bricks are ignored during construction, it definitely means there would be lesser load for the slab to carry.
Why engineers continue to use these bricks rather than leaving it void, its basically because of aesthetics and it is also quite cumbersome in preparing the form-work with the all the ribs. I'm actually finding it difficult to explain this in simple terms, maybe a diagram could suffice
very good analysis. when the clay pot is not used then it is called waffle slab I guess!
PropertiesRe: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Aventures(m): 6:32pm On Nov 12, 2014
write2obi:
Good job boss smiley. The white door am seeing look beautiful: is it made in Nigeria? And how much is it? Thanks.
itbis an imported door we bought it from Buono Doors at 26k.