PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 3:44pm On Sep 09, 2015
Chekitaut:
Weldone, great job... form work am highly waiting to see.
formwork lowered. Reinforcement completed. slab reinforcement in progress. grd floor to first floor columns completed. casting of grd beam in a short while, we are trying to get something very right from the start.
PropertiesRe: PILLING:CONSTRUCTION PROCESS OF TRIPLET WITH BLOCK OF FLAT AT LEKKI by Aventures(m): 3:39pm On Sep 09, 2015
Who impregnated ur slab. lol
PropertiesRe: Semi-detached Duplex At Royal Garden Estate, Lekki By MOORE by Aventures(m): 5:42pm On Sep 05, 2015
angry
segcymoor:
Challenge:we may not achieve our target due to shortage of filling budgeting for ......ati je gbese filling grin
filling is always like that very difficult to be precise. God help you my broda.
PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 10:18pm On Sep 03, 2015
Reinforcement work to soon be completed and to be lowered. Hoping to pour ground beam concrete next week.
PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 7:43am On Sep 03, 2015
kopell:
@Aventures how many block can that machine make at a time? It looks like it's does not have any mechanized system attached to it. I hope it can make five blocks at one time.
yes the mechanised systems are yet to be attached it will be fixed before commencing production. The machine can only produce on at a time.
PropertiesRe: Construction Of Duplex And Attached Flats @isheri North GRA Lagos by Aventures(m): 10:27pm On Sep 02, 2015
OP please find another name for the foundation you are constructing. this is not a raft foundation. mere fact that you have a ground beam here does not make this a raft fdn. A raft foundation is type where you have your ground slab and the beam reinforced and in monolithic condition. This type of foundation is absolutely good for bungalow only in a water logged area where you there is tendency for the use of blocks at fdn may be weaken by the water. Well i believe you are acting based on your structural engr design but honestly absolutely wrong, if i have to explain this then i will have to write an epistle, but kindly check previous thread of segcymoore, kkonsult, brabus and other to see what is called raft foundation.
PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 9:59pm On Sep 02, 2015
more pics

PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 9:52pm On Sep 02, 2015
Work progress update:
1. Formwork taken to 70%, so iron fixers can do their work non stop.
2. reinforcement work up to 50%
3. We took delivery of reinforcement for ground floor slab and grd floor columns today (see above pics) so that as soon as we are done with grd beam casting, the iron prep commences while filling and surface prep is in progress.
4. Block making machine already onsite but we hold on production as every where is tight they could not get material into the side due to heap of sand, so as soon as we are done with grd beam and back fill the production will commence in earnest.

PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 9:44pm On Sep 02, 2015
Fhemmmy:
Awaiting picture update oh . . . . cheesy cheesy cheesy
Reinforcement fixing in progress

PropertiesRe: Construction Of Duplex And Attached Flats At Osapa London Ajah by Aventures(m): 10:08am On Sep 02, 2015
PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 9:00pm On Sep 01, 2015
@Brag3 if I get you right you said in the original drawing there is a pent floor meant to be 3 bedroom flat. You want to know if you can convert the 3 bedroom pent floor to 3 nos of self contain to generate more rental yield. This doesn't seems to be an additional load since you are only converting and not adding extra new floor. Since your architect has given you the go ahead, I am sure they must have checked that the conversion won't pose any challenge beyond the factor of safety they have considered during design. But one truth is that if your architect is an expert space manager he should be able to advice you that pent floor is always for an exclusive use. Now if you convert it to multiple apartment it may loose its functionality, as 3 occupants may have to use a very small lobby at the second floor. So I will advice you let it be as 3 bed flat except you are excepting students to be the tenants.
PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 8:20am On Sep 01, 2015
oakhill:
Can this building fit in a 50 x 100 plot of land..?
it cannot except the size of this design is reduced a bit.

oga spyder880 tx for taking ur time to visit our humble thread Hat up, keep up the good work at the eastern end of nija.
PropertiesRe: Semi-detached Duplex At Royal Garden Estate, Lekki By MOORE by Aventures(m): 9:50pm On Aug 31, 2015
segcymoor:
Speed! We set to cast oversite conctrete on or before Tuesday. ......Hence urgently required:2 dust and 1 granite angry
Chief builder, Tuesday...!!! Waow God will grant you the speed and the grace. I guess you may have to work late or do some nite shift,
PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 9:41pm On Aug 31, 2015
brag3:
Thank you very much for the thorough explanation. We learn every day from professionals like you.
What is the minimum number of boards to use for a foundation? I know this will depend on the area itself so I expect somewhere like Lekki to use more boards than mainland lagos.
Just trying to understand the minimum height to use irrespective of the area. This is minus the raft slab.
Thanks again for your prompt answers to our questions.
Sir, there are two determinant factors to the foundation height (raft fdn in particular) 1. The load that the beam is going to bear, this will be determined by structural design. 2. The desired height above the natural Ground level (NGL). In the case of our ongoing project the desirable depth was achieved at the point where there is soil bearing capacity high enuf for the this structure (900mm or 0.9 m or 3ft) and also i think the structural engr and Architect were of opinion of minimum of 600 mm above the natural ground level at the car park area and 900 mm at some other area. So it is basically the structural design and the site topography (i:e site natural grd level relative to the road or envisaged road level)
petikal:
Great design, and interesting use of parking space. By a plot and half, do you mean 50x120? It seems much bigger than that.
This structure was designed to fit into one plot of 60 x 120 ft but when we got to site we discover that the plot was wider than 60 ft, and that becomes an additonal advantage to the car drive way it become bigger.
PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 5:25pm On Aug 31, 2015
sorry for the typo . 1.5m by layman's term is 5 boards
PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 5:24pm On Aug 31, 2015
brag3:
Thanks Haji M,
I thought as much as I could only see 3 woods from the pics.
Just wanted to confirm the height of the foundation.
Thanks again
The height of the fdn is 1.8m (by layman's term we ll say 6 boards) this include 0.2m raft slab, in some area the height is 1.5m (6 boards) including the raft slab. (this are the areas of car park under the house, it was reduced so that to allow for easy movement of the vehicles.
The 3 board u saw is not an overall height yet, we did 3 for now because 5 to 6 boards will be too heavy to carry into the trench and set properly, also it will be too high for iron fixers to stand and work on it. After dropping the iron the remaining formwork will be added to meet up to various desired heights.
PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 8:31pm On Aug 30, 2015
Form work prep and fixing in the trenches in progress................

PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 10:48am On Aug 28, 2015
Hello every one,
Work in progress outline:

1. Formwork preparation for ground beam
2. Preparation to commence block making on site.
3. Ground beam reinforcement fully prepared awaiting form work before fixing.

Pictures update shortly.
PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 1:18pm On Aug 26, 2015
work in progress: Material delivery stone dust and Granite courtesy of smile01 and checkitaut , Cement delivery, woods partially delivered rest on the way,. Borehole done water now available, blinding ongoing, trench scraping ongoing.

We are set t move now......

PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 10:19am On Aug 21, 2015
Fhemmmy:
Thanks for the explanation . . . .Awesome.
You are welcome sir.

The work is still in progress just 2 line of work: excavation and reinforcement preparation. There are no much difference in pics for now. As from next week by God's Grace more line of works and progressive pictorial inflow will start flowing in.
PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 4:39pm On Aug 20, 2015
Fhemmmy:
Please explain . . . Thank you, sir
The soil is loose at the top level, but basically it was at 0.9 meter that we have a reasonable bearing capacity that can sustain the pressure of the structure (according to soil test report). so we had to take the grd beam tovthos level even though it may be cumbersome we have no option than to follow due standard.
PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 10:22pm On Aug 19, 2015
More updates of the work:

. Excavation in progress
..Reinforcement Preparation in progress
....Site house construction ongoing

PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 11:53am On Aug 19, 2015
Fhemmmy:
[color=#000099]I love the way you taking your time to get it right from the foundation, awesome..... and many eyes working together can't and won't get it wrong. Kudos. sir tx we cannot afford to get it wrong so we brought the architect to site and conducted the critical aspect of the setting out together. upload of work pics shortly
sir/color]
Chekitaut:
Chairman, Oba Awon Builders(OAB) congratulation
God is the king and master builder he built the entire universe. we only continue where our father stopped. we'll do our bit amd our father will blessed our work. tx
PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 7:48pm On Aug 18, 2015
pictures from the setting out

PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 2:07pm On Aug 18, 2015
work in progress: Marking out completed yesterday and the digging has commenced.

we are taking delivery of reinforcement, and the preparation commence immediately.
PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 11:53am On Aug 18, 2015
smiley001:
@Aventures, Tanks so much sir for ur patronage yesterday & ur material had been delivered. God will continue to bless u sir.
Granite! Granite!! Granite!!!
u re welcome. more to come by God's grace
PropertiesRe: Semi-detached Duplex At Royal Garden Estate, Lekki By MOORE by Aventures(m): 4:37pm On Aug 17, 2015
Chekitaut:
Granite is 145k,Dust 95k
Granite 145k u wan kill person. meanwhile pls respond to my text msg.
PropertiesRe: Semi-detached Duplex At Royal Garden Estate, Lekki By MOORE by Aventures(m): 8:48pm On Aug 15, 2015
# following
PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 12:41pm On Aug 15, 2015
EgunMogaji:
I've laid tiles before and this makes me appreciate this job right here. This is pro tiler job - kudos smiley
Is this your employee or a contractor? If a contractor can I have his details?
he is a contractor, I ll give you his contact. he is in Togo right now. Whenever he is in town he will call me to let me know is back. He is Mr Peter by name 08035751201 just tell him you are calling from Engr Niyi
PropertiesRe: Construction Diary Of A Semi Detached Bungalow At Ikorodu by Aventures(op): 10:15pm On Aug 14, 2015
EgunMogaji:
2 years later I still found this thread very useful, please expect an email from me.
Thank you sir.
PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 3:51pm On Aug 14, 2015
@ Hajj: hajj Mufutau vouched for us as per delivering what you see, and so shall these be by God's grace.
PropertiesRe: Construction Of A Medium High Rise Multi Dwelling Service Apartment At Ajah Axis by Aventures(op): 3:40pm On Aug 14, 2015
mufutau55:
Killer design. Exactly what I was expecting. God help the Client and Aventures to complete the project in good health.
Hajji M.
I amso glad we have people who believe with God all things are possible.

So we do believe so and we took over the site in The name of God (Spiritual site handing over) while the physical will really take place on Monday by God's Grace. so some pics below shows the site over view.

Meanwhile, i will like to seek for pardon in advance because i may not meet your expectation WHEN IT COMES TO SPEAKING GRAMMAR, any typical engineer will tell you that our language is drawing, but i promised to do my best. I am saying all these because someone was asking where is the seventh flats, I summarized all the service rooms and facility managers office together and i named them flat 7.