cirmuell:FG Should do something ASAP |
Combination of Air force, Navy and Army stormed Ogolonto in Ikorodu since yesterday busrsted bunkery biz and made a lot of arrest. shame to police for failing in their duty.
|
KolaShangOne:very correct I just want to have a light time and ease of stress. Don't mind me. |
(PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI:Our Next Project)[s][/s]OP change this topic now i beg this no longer the next project it is an ongoing project your next project, if i may let the cat out of the bag is.................................................................................hmnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn make i talk am ok The construction of 4th mainland Bridge (Linking bridge between lekki and ikorodu) LOL.... |
KolaShangOne:This levelling instrument looks more like telescope LOL, dumpy level of those days very good and accurate if well used within the range of its magnification power range |
Happy Independence Day to all of us. Wishing all of us as well Barka de Sallah in advance. From all of us @ Abidoy Ventures Ltd and Behemoth Engrg Ltd. |
FastShipping: ^^^The detail will come up as soon as i round up this stage |
Today's update
|
project work update
|
jejeman: Please can I get the cost estimate of 3 bedroom duplex and 2unit of 2bed from foundation to german floor. Is a dry land at gaun Magboroyes you can, if we have your drawings. |
Roof Covering work to commence today |
more pics
|
Work update: Roof carcass taken to completion, but we decided with permission of the client to improve on the aesthetic. Roof Tank slab and the block wall around it Spiral staircase form work Deforming of the decking woods. Check below for the pics
|
osarodon: Good oneThanks |
GODAKPAN: following keenly. pls whats the total number of blocks used plus size of blocksblock work is still on going we re using both 9 & 6 inches block , as at now we've used close to 4800 blocks of both |
ibedun: Can i get your roof cost as well please thanks.lump sum for our roof carcass and noggins =N= 853,000 and we ll soon get to roof covering, i will equally update as well, mean while from the pics you posted i found out that your building looks wide er than ours and so to achieve a high pitch as ours yours may cos a little higher than this, because the basic determinant of roof cost is the pitch and the kind of roof covering you intend to use |
roof work day 3 update
|
ibedun: this is where we are nowok sir. we are about rounding off the roof work externally. Update pics shortly. |
teddyblueu: All nice, well done,wish costing is included.sure I am going to furnish all readers of this thread with the cost shortly |
dawn of a new day, roif work continues., while preparation to put civering is going on, also plastering will soon follow. , we are committed tovdeliveringvthe finished building by November ending by God's Grace. |
Today marks 19th day work after casting the decking and 2 days into roofing work
|
18 days after casting the decking, we continued working and now we are at roof level. Roof wood carcass in progress while we await maturity date of the decking before removing the form work and supports.
|
work continues on the super structure
|
more
|
We commenced block setting immediately after the casting. Here are more pics of the block work of the first floor.
|
So many odds against the decking casting but to God be The Glory all were surmounted and the day was succesfull.
|
kopell: @Aventures welcome back your student as being wondering, where Oga come go now.thank you sir we went on a mission to deliver a task. thank God it was successful. hope to share some of the misson pics later on this tread |
Material procurement Block procured in advance to a proper curing before using. Also Granite + Stone dust combo for the suspended slab concrete work
|
more
|
more pics of work progress on decking
|
first floor slab work in progress
|
work was actually in progress in full force scale, we would like to update some pics of work done previously till date: The pics is the column form work done after German floor casting and the kicker has been done
|