₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,331,278 members, 8,449,546 topics. Date: Wednesday, 22 July 2026 at 12:15 AM

Toggle theme

Aventures's Posts

Nairaland ForumAventures's ProfileAventures's Posts

1 2 3 4 5 6 7 8 ... 19 20 21 22 23 24 25 26 27 (of 60 pages)

PoliticsRe: End Of Days For Pipeline Vandalism by Aventures(op): 7:53pm On Oct 06, 2014
cirmuell:
Na today? Bleep NPF undecided
FG Should do something ASAP
PoliticsEnd Of Days For Pipeline Vandalism by Aventures(op): 5:11pm On Oct 06, 2014
Combination of Air force, Navy and Army stormed Ogolonto in Ikorodu since yesterday busrsted bunkery biz and made a lot of arrest. shame to police for failing in their duty.

PropertiesRe: Construction Diary: 100-seater Lecture Theatre by Aventures(m): 11:03am On Oct 06, 2014
KolaShangOne:
My Oga, we both know say dumpy level, builders auto level, level instrument, etc are all used for the same thing. Infact, they are telescopes, all of them.
very correct I just want to have a light time and ease of stress. Don't mind me.
PropertiesRe: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by Aventures(m): 6:45am On Oct 06, 2014
(PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI:Our Next Project)[s][/s]OP change this topic now i beg this no longer the next project it is an ongoing project your next project, if i may let the cat out of the bag is.................................................................................hmnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn make i talk am ok The construction of 4th mainland Bridge (Linking bridge between lekki and ikorodu) LOL....
PropertiesRe: Construction Diary: 100-seater Lecture Theatre by Aventures(m): 6:38am On Oct 06, 2014
KolaShangOne:
One of our I.T. students from Uni. Of ibadan using the levelling instrument to check and recommend adjustments to the foundation level.
This levelling instrument looks more like telescope LOL, dumpy level of those days very good and accurate if well used within the range of its magnification power range
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 12:39pm On Oct 01, 2014
Happy Independence Day to all of us.

Wishing all of us as well Barka de Sallah in advance.

From all of us @ Abidoy Ventures Ltd and Behemoth Engrg Ltd.
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 3:33pm On Sep 21, 2014
FastShipping: ^^^
Please, give us the breakdown of the cost of wood, roofing sheets and workmanship for this roofing.
The detail will come up as soon as i round up this stage
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 9:20pm On Sep 19, 2014
Today's update

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 9:39am On Sep 19, 2014
project work update

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 9:41pm On Sep 18, 2014
jejeman: Please can I get the cost estimate of 3 bedroom duplex and 2unit of 2bed from foundation to german floor. Is a dry land at gaun Magboro
yes you can, if we have your drawings.
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:32am On Sep 18, 2014
Roof Covering work to commence today
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:10pm On Sep 17, 2014
more pics

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:08pm On Sep 17, 2014
Work update:
Roof carcass taken to completion, but we decided with permission of the client to improve on the aesthetic.
Roof Tank slab and the block wall around it
Spiral staircase form work
Deforming of the decking woods.
Check below for the pics

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 10:47pm On Sep 16, 2014
osarodon: Good one
Thanks
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:56am On Sep 12, 2014
GODAKPAN: following keenly. pls whats the total number of blocks used plus size of blocks
block work is still on going we re using both 9 & 6 inches block , as at now we've used close to 4800 blocks of both
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 9:01pm On Sep 11, 2014
ibedun: Can i get your roof cost as well please thanks.
lump sum for our roof carcass and noggins =N= 853,000 and we ll soon get to roof covering, i will equally update as well, mean while from the pics you posted i found out that your building looks wide
er than ours and so to achieve a high pitch as ours yours may cos a little higher than this, because the basic determinant of roof cost is the pitch and the kind of roof covering you intend to use
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:50pm On Sep 11, 2014
roof work day 3 update

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:06am On Sep 11, 2014
ibedun: this is where we are now
ok sir.

we are about rounding off the roof work externally. Update pics shortly.
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 4:48pm On Sep 10, 2014
teddyblueu: All nice, well done,wish costing is included.
sure I am going to furnish all readers of this thread with the cost shortly
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 11:57am On Sep 10, 2014
dawn of a new day, roif work continues., while preparation to put civering is going on, also plastering will soon follow. , we are committed tovdeliveringvthe finished building by November ending by God's Grace.
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:30pm On Sep 09, 2014
Today marks 19th day work after casting the decking and 2 days into roofing work

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:12pm On Sep 09, 2014
18 days after casting the decking, we continued working and now we are at roof level. Roof wood carcass in progress while we await maturity date of the decking before removing the form work and supports.

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:02pm On Sep 09, 2014
work continues on the super structure

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 4:46pm On Sep 09, 2014
more

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 3:15pm On Sep 09, 2014
We commenced block setting immediately after the casting. Here are more pics of the block work of the first floor.

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 3:12pm On Sep 09, 2014
So many odds against the decking casting but to God be The Glory all were surmounted and the day was succesfull.

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 11:43am On Sep 09, 2014
kopell: @Aventures welcome back your student as being wondering, where Oga come go now.
thank you sir we went on a mission to deliver a task. thank God it was successful. hope to share some of the misson pics later on this tread
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:20am On Sep 09, 2014
Material procurement
Block procured in advance to a proper curing before using. Also Granite + Stone dust combo for the suspended slab concrete work

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 9:35pm On Sep 08, 2014
more

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 9:10pm On Sep 08, 2014
more pics of work progress on decking

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:53pm On Sep 08, 2014
first floor slab work in progress

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:06pm On Sep 08, 2014
work was actually in progress in full force scale, we would like to update some pics of work done previously till date:

The pics is the column form work done after German floor casting and the kicker has been done