PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 7:52pm On Sep 08, 2014
Dear all there was a long break in transmission. We are quite sorry for this. We hope to update and continue till we deliver. Thanks
PropertiesRe: Construction Of A Block Of Mini-flats. by Aventures(m): 8:42pm On Sep 07, 2014
OP, good work on going. I do not have problen with thevraft fdn as long as it is rightly informed. at times some land might be very deceptive looking firm but weak in strength. such soil composition might be due to silt sand deposits by erosion and over time will form a table looking land. But I think the blinding look excessive 2 inches blinding will suffice for this kind of raft , blinding isbjustbtobcreate an interface btw the earth and the struxtural member you want to place on it is not adding any strength to the structure.
PropertiesRe: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by Aventures(m): 12:16pm On Aug 30, 2014
blink182: Wow, never knew piles could be done like this. I thought they will be prepared then hammered by the machine into the ground.
blink182: Wow, never knew piles could be done like this. I thought they will be prepared then hammered by the machine into the ground.
blink182: Wow, never knew piles could be done like this. I thought they will be prepared then hammered by the machine into the ground.
You are not wrong, there are several methodology of pile fdn construction, one of it is the hammering of precast pile, but that is done in a rare case because of the severe environmental impact and more so, it is very much more expensive and not really necessary for a project like this. The in situ casting is the best for this kind of project.
segcymoor: Thanks for observations:we appreciate your professional inputs and support especially on this project. May Lord enrich your knowledge further.
you are welcome. Ride on to higher success as you pioneer the showcasing of hitech construction on this forum
PropertiesRe: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by Aventures(m): 9:27am On Aug 30, 2014
segcymore good work, a good lesson we are learning here!

Just my little widow's mite

Let your guys increased the length of the reinforcement to allow adequate continuity that will form a dowel bar in the pile cap. Yes you might have measured your bar length correctly but at times the drilling machine may drill beyond your anticipated depth a little, also knowing fully well there is a need to cast the concrete up above the ground level to also allow for cutting to level while setting out your pile cap.

@MOD : i wonder why this topic has not hit the front page, i saw a continuity of an abandon project on first page this morning, good we are going to learn from it, but this particular one is going to be a rare lesson that a lot of people both in Nigeria and diaspora and even tertiary institute students will learn a lot for. Plsssss front page and let us stop localizing this beautiful of good work and selfless service of our dear colleague.
PropertiesRe: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by Aventures(m): 5:22pm On Aug 18, 2014
OP, who did the structural design in the first place, i guess the guy did not visit the site nor carry out any soil test investigation before doing the design, and that is why all this hassles at construction stage. I appreciate your technical input in ensuring safety of the life of future occupant and your client investment. The truth of the matter is that if you have gone ahead to execute what you have in the design, in case of any eventuality you will be absolutely exonerated.

Lesson No 1: Clients please engage certified professionals for your designs and never refuse their proposal to carry out all necessary investigation in order to come up with a reasonable design. (some clients are mostly the cause of design defects, always believing that there is no big deal at design stage). Failure to get the design right will lead to wrong budgeting.

Lesson No 2: Contractors, learn from segcy more do not be greedy investigate your site very well before commencing Job.

All of us let's do it right.
PropertiesRe: PILE FOUNDATION FOR TERRACE BUILDING AT LEKKI by Aventures(m): 7:23pm On Aug 17, 2014
Following with keen interest
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:10am On Jul 29, 2014
An update pictures on the ground floor columns.
16 mm Reinforcement completely erected.
Kickers to mark out the right positioning of the columns also done.
Form work in progress.

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 10:05pm On Jul 21, 2014
The house begins to grow as we begin work on the ground floor column and first floor slab
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:24pm On Jul 20, 2014
Fairdeal74: Dear Aventures, thanks for your good work in enlightening potential landlords. This learning will not be complete without us knowing the plot size of this building.
This land is not regular in shape, considering its area in square meter, it is about a plot.
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 5:03pm On Jul 19, 2014
More pics of German floor casting.

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:02am On Jul 19, 2014
cleric: Great! Thanks for the clarifications. How high was the ground beam used before you started using blocks? I would love to have the cost of the foundation (if client permits).
Overall, i must say it is a very tidy job. You have very good iron benders and bricklayers. Do you same guys or source for workers in the area? I mean do you have a standard team or do you employ new hands at your various project sites?
I have sent the update on the foundation cost update to my client after perusing it i want to believe he will grant permission to publish, cos he actually encourage me to open the tread for people to learn as he had learn on NL and he is still learning. When we lost the tread due to the attack he also boosted my courage to reload.

I do not take up new hands to work for me as we have had bad experience doing this in the time past. Now we have teams of well known hand and they work for us anywhere we go as our key work men and we can only add few labour as the case may demand to work and get paid off.

Some of team worker doing the stuff they know best!

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 7:33am On Jul 19, 2014
cleric: Even more impressive. Thanks segcymoore for the reply. I will stay posted perhaps to ask very lame questions as I learn more but most importantly to learn from some honest builders here. I have been silently following some building threads and I must say that I was highly disappointed at the 'thiefery'.
The budget is exclusive of the roof. We deliberately remove roofing because as at the time of working on this estimate we have not decided on the type of parapet we want to use ( as we are considering the latest parapet in town; aluminium parapet very light stylish and easy to fix) also the roof covering has not also being decided on. What we have is a budget to take the building to carcass to roof level and add flesh to it (block work). At the permission of my client i will post the stages actual cost at the completion of each stage, otherwise i will keep it to my self and disseminate on a special request.
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 9:41pm On Jul 18, 2014
Pics update from German floor casting update.

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 11:37am On Jul 16, 2014
cleric: Aventure, I know u for quality. I am not one of those who subscribe to using blocks. I can even see that a block is cracking from the foundation already in the pix above^^^. Did u fill the blocks with concrete?
I am subscribing though.
At no reason ,and at no time are we going to compromise quality. What you saw is not a crack caused by structure quality or failure but as a result of form work for the short pillar casting nailed firmly to the block wall. This is one of the reason i prefer doing my columns before block wall after foundation (i;e framing the structure with structural members first before partition wall).
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 10:07pm On Jul 15, 2014
Preparation on top gear for German flooring, below are the pics of earth filling, watering and compaction.

PropertiesRe: Buildng A Block Of 4 Flat As A Framed Structure. Pix, cost and challenges. by Aventures(op): 9:53pm On Jul 15, 2014
very reliable.
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 10:39am On Jul 14, 2014
goodnews2013: Good Morning Sir.
Thank God the class is back
Lectures continues, and we are happy to follow.
Well done and good job
vanessara: Adventure,
Well done
Thanks. Class continues!
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 6:25pm On Jul 13, 2014
more updates as work continues. Happy Sunday to you all
PropertiesRe: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Aventures(m): 5:55pm On Jul 13, 2014
All i can say is waow!!!

When will most Client will be able to afford steal scafold? God Help Us. Amen
PropertiesRe: CONSTRUCTION PROCESS OF TERRACE BUILDING &BLOCK OF FLAT AT LEKKI by Aventures(m): 3:46pm On Jul 12, 2014
PropertiesRe: Construction Process Of A Wing Duplex+flat At Ajah by Aventures(m): 3:46pm On Jul 12, 2014
PropertiesRe: How We Built The "Luxury Block Of Flats" In Enugu by Aventures(m): 3:45pm On Jul 12, 2014
FoodRe: Nutritional Facts About Watermelon by Aventures(m): 3:44pm On Jul 12, 2014
PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 3:41pm On Jul 12, 2014
Up to date

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 3:36pm On Jul 12, 2014
We are catching up to the present stage of work, more pics update

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 3:29pm On Jul 12, 2014
More of flat 1 fdn pics

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 9:47am On Jul 12, 2014
The portion we termed as weak zone was given a different treatment compare to other two flats.

The column bases was increased to 1.5m x 1.5m.
The column base depth was taken to a range of 1.8m - 2.0m deep (a point at which we encountered a fine sand )
The starter columns is in two parts: After casting the base the column was first cast to the trench level after which the beam was connected to the top of all the columns in this area.
450 mm deep beam was run all through this area connecting all the columns and on which the foundation block was laid.

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 9:18am On Jul 12, 2014
Foundation block work on the two flats

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 9:06am On Jul 12, 2014
Due to some logistic challenge, rain fall *causing the excavated heap falling back into trenches as we have took our foundation to very good depth) and also while planning on how to tackle the weak zone, we had to concentrate on the other two flats in other to gain time,

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:47am On Jul 12, 2014
more

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 8:45am On Jul 12, 2014
While the excavation was ongoing the column bases reinforcement preparation was ongoing. Due to the portion of the land we termed we increased some mat sizes.

PropertiesRe: Construction Tread On 6 Units Of 2 B/rm Flat At Ikorodu: Reloaded by Aventures(op): 10:01pm On Jul 11, 2014
Along the line, we discover that the site lie in a transition zone i:e the soil nature changes from firm starta to weak strata within same location.

Then we began to brainstorm on way out. several contribution came up in the former tread. What we eventually did will be showcase along the line. Meanwhile here are the pictures of the weak zones