Fhemmmy:Jeez!!! I was in primary two when I last read from you sir. ![]() |
mufutau55: ![]() Sigh!
|
adanny01:In 2012, I built 2 units of detached duplex for a nairalander and the client engaged independent consultants (structural, mechanical and electrical) to double check my work. Each of them had nothing less than 20 years experience and they were paid heavily to do this. This is outside the estate project managers, government inspectors (LASBCA) and the design architect who come in at every critical stage to check and sign off the work and ensure the "as-built" conforms with the design. The client is here. I'm sure he's not trying to show off but doing exactly what a good project manager should do on every project. |
And this is helical elliptical staircase.
|
This is spiral (supported) staircase. Hidden stairs Abolarin91:
|
Here’s the cantilevered section of the staircase.
|
Here’s dog-legged staircase with a landing.
|
Here’s a floating L-shaped staircase.
|
true2home:That’s a winder staircase. It’s a variation of an L-shaped staircase without a flat landing. It’s cool when you design it well. I am n3xt ![]() |
I vote fynestboi cc: nljega |
adeekiti:Not unpredictable. Mentioned this earlier. That format is called FG format. Pump enough water into the ground, install control valve and use slow pump for commissioning day. |
FastShipping:+1 _____ The Ile Oluji project ended up with a well after putting some thousands of naira into sinking borehole. _____ Another project (personal) in Odogbo area of Ojoo, Ibadan ended up with a well after trying all recommendations from neighbours and recommended help. _____ Ilugun MultiDwell Flats ended up with a well after survey recommended 108m with low-yield. Ilugun, Odogbo, Ibadan and Oke-Igbo, Ondo formation are pretty similar to Abeokuta Ogun state. Most surveys still rely on un-updated datas in the ministry of water resources. Some risk are really not worth taking though. |
I thought sinking borehole is as simple as ABC once money dey ground. I dare anyone who has successfully done a borehole (industrial or domestic) on hilly terrain to showcase their job here and the cost. And possible help the needy here. If you miss 90m once, I'm sure no one will tell you don't try it again. And maybe my 30% mobilization and balance on completion will work. Baba msogunro, do you mind sharing the report. I wan see the weight of the overburden. Happy Sunday! |
I vote Lanicky Cc: nljega |
I vote lanicky cc nljega |
I vote Lanicky cc nljega |
I vote Lanicky cc: nljega |
agarawu23:Third ID loading #TeamLanicky |
That's no problem. The only downside to the proposed is that we are going to have a small bathroom (1.2m wide). However, we can carve out a 1.2m lobby from the remaining 2.8m in between the bath and the kitchen. We will make use of a divider to do the kitchen partition. It can be a cabinet, plasterboard or something cool. No need for wall partition as that will only eat a chunk out of much needed space. Demainman1:Edit: We need to teach the old fashioned people how to live the modern way. |
Mayor78: Pleas how can I cut cost of phone calls to Naij. I reckon that marathon of phonecalls would be essential to keep going. Ideas please!!!Whatsapp call or Viber calls to get live video update if necessary. Sow a smartphone into the life of your site manager. |
EgunMogaji:You immediately realize it's Remote Management Problem. Using my IT wizadry, it can be any of the following and resolved: * It's like you can't establish a connection to the remote server (your builder in this case). Check all the links. One will surely expose the point of failure. * It must be that the remote server (your builder) is using a non-public IP address and exists on an entirely separate network or hiding behind a firewall, that you may not be able to directly connect to it unless you're given authorized access. (This means you may only see what they want you to see). You may have to implement a VPN (create a backdoor/operate in stealth mode) so you can manage the server from your remote office. * Make sure adequate bandwidth ($$$) is available and the main server you want to manage is also not been remotely managed by the other remote users. Nothing wrong with a server having multiple remote users but you need to be on priority list. * Check Group Policy setting and ensure you're registered active directory user. Ensure that your head still dey there with your builder. You may need a 3rd party to get that. ______ But truth be told, the main server is slow. |
Update on NextHome Brick+Stone I visited WIHU Lagos Office today to check out our machine for the block production and interlocking brick maker which I'm picking for backyard projects and other smaller jobs. Oops! There's always something to fix. This time, it's electricity. Hmm! One day, one day, the pig will get to Oyo town. I just can't take my eyes off the interlocking bricks. I've got a big plan for this!
|
Worthy of mention is the proposed Raised Bungalow coming to Otunla town, Lagos. Design work in progress. |
Meanwhile, here's to wish our newest landlord/upcoming homeowner congratulations on successful purchase of his land for the proposed development of Bledded Luxe, Lakowe by NextHome. All hands on deck to tidy up the design works at our end for the kick-off of the project next week. Congratulations! |
Meanwhile, a bricklayer somewhere on the planet earth did the unthinkable. This is not what I mean by doing the impossible o, Frankdon.
|
frakdon:Are you sure you can with us? There are other things I never mentioned o. 1. Can you work with less and achieve more? 2. Can you work under pressure? 3. Can you sacrifice your gains for new ideas and experience? 4. Can you work in an environment where you'll be supervised like a baby or a rookie? 5. Are you ready to break away from the norm and do the impossible? If you game, Browne Mews by NextHome may be your trial project. All my fabricators work on site. You can come with your machines or we provide you with ours. 24 hour electricity is guaranteed. By the way, I like your spirit sha. |
After Finishing, We Furnish. Upcoming! Rare furnishings pics by NextHome.
|
Beachland Lux Duplexes
|
Congrats Hon. Mayor78, Interestingly, I never read it anywhere dat dem dey catch late comer for home ownership. Take your time, the bottomline is do your best to get it right. Even if it's only one that fate allow us to have, let that one be worthwhile. #askme Chateau de Brabus was built between 2010 and 2015. And we are yet to do the final paint work (I just did first coats and decide to chill out). Anyone who feels it's too late can give me fund to complete the rest work to taste. I'll gladly take it and still take my time to judiciously spend it. Enjoy all the intrigues, suprises and disappointments that come along. It's part of the fun. May God add more bricks and mortar to your project. Amen. Wishing you good success. |
Beachland Lux Apartment
|