QuestionMan016: The four room bedsitter I plan to build for my elder brother,we are considering a circular shaped or egg shaped house,we need something different and remember most houses in Nigeria are the normal rectangular shape house.
I plan to beautiful this building after construction with flowers and some trees.We will also drill borehole.
I am already making arrangements and today I informed my friend (an Hausa guy that has been doing many labor job for me,he and his brothers are into bricklaying job as well.
Remember hausa laborers are cheaper to hire and also I have plan to buy a water tank that we will use to store water for working,We will start with 500 block first, because we want to also use block to raise a little fence to warn our neighbour who is giving us headaches by trespassing Into our land.
I'm just respecting their old age not that I'm afraid of them,I will invite the community people to mention the land and we will dig hole to set foundation blocks for fence first .
Please connect me with any architect in Benin city, specifically around Benin Agbor road where the project is located.
One contacted me from nairaland and he's base in Lagos,I want someone who reside in Benin city.
You can pick a reliable architect from any location to deliver the building plan n structural plan . Then get an engineer/contractor in benin to execute the plan.
I would need professional advice here, am undertaking a building project in owerri precisely and currently preparing for roofing, and don't want to take things for granted though it's for commercial purpose
I want to know the best roofing sheet to use in terms of durability, resistance to corrosion, permeability and strength
Also what's the best kind of wood to be used, other additional information will be useful.
Thanks
for roofing shit use stone coated 0.5 guage or Aluminum 0.7. wood personally I prefer HAND SAW WOOD. (DANTA , ABURA, EKI...)
Good dey house please what is a fair price to settle community carpenter in AGBARO DELTA STATE to do a small lintel work. the carpenter union is asking for 10k settlement.
This solar issue is still unclear I agree with born2conquer opinion in the solar issue, because i have read all the quote to his message and they keep saying if u use "the right equipment " why can't u all just go straight to say what u can vouch for? or even the professionals are gambling it? I have neighbors with over 17 panels on roof baba dey turn on gen sometimes. my personal opinion on this solar stuff is, it's good but not as sustainable as the generator or the general power supply.
This dressing phase has to do with putting cement n sands mix in the joints of the precast range. This took 2 days for both buildings And half bag of cement
Good day house . has anyone done a roofing job before with a room in the roof sitting on the wooden tie beam. the king post is 16ft high. owner needs a 10x12 room in the roof.
uncleteeh: Negotiate a contract sum, this will save you time and unnecessary stress. Let him be the one to handle his people, if you happen to be on site with them during work, you will observe how his workers (daily paid workers) will be stressing him.
😆 I'm the contractor/ engineer on site. the guys are stressing me already. I'm changing the arrangements soon because of the raining season
Good day contractors n engineers in the house when you take carpenter for roofing work. is it best to pay daily (asin daily pay) or negotiate a contract sum or negotiate the contract days?
michlins: it's very much possible. He will lure him in with 40 bags first and when he's in, he will then start with extra twenty bags then fifteen and few more ten bags and so on.
Things are really hard and people are finding devious means to get jobs
wow na so una dey do am now?? I just believe the person would cash 1½" of concrete or maybe 2" and it would suffice
Story time... so today I went somewhere to measure the sqm of a compound floor for a stamp floor job after measuring we got a total of 200sqm I told the guy that at 3" of concrete we would use about 100 bags, he shouted and said someone else already told him 40 bags would do the job for regular concrete flooring. how is this even possible? 1" thickness?
Casting the second building and this took 1 day for level setting 2 days for hanging slab 3days for casting the concrete 10 length 25ft quarter rod 10 bags of cement
UPNEXT WOULD BE DRESSING THE parapet. stay tuned I will keep u updated
FEGEITOK: I use this ratio as my minimum ratio and every time I do the workers marvel at how much granite I am using. They complain that they are not used to that much granite being used.
I have used both 1/2-inch granite and 3/4-inch granite.
In fact, I was once called Julius Berger for my insistence on the quality of concrete mix.
Once when someone had cause to break a portion of the concrete the workman shouted, do you want to build an everlasting house? This concrete is too strong!
I wash the granite that I use to create a 4'/6"water barrier, but I have never washed the granite that I use for the concrete mixtures.
Going forward, I will.
I even use reinforcement (TMT) for the concrete floors which the laborers said is a very rare event.
are u the landlord of the building or the engineer?