Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 8:08pm On Dec 24, 2022 |
Actually I don’t want to talk on this matter again if not bcs of this latest version of the issue. They said we cut corner .. lolz anyway I don’t need to dwell much on it as argument. Even my own personal project I never used 0.45mm let alone client project. And more than 20 building that I have constructed here I never cut corner either you are there or not, I will do my work as it’s should be and move on to other project.
I never cut corner on iron rod of about 8m ( original TMT Tiger) always Cement of about 3m Granite of 2m -Plumbing pipes and fittings Electrical pipe, DB etc It will now be aluminum of diff of N90k that I will cut corner … When I I can see diff of Almost 1.5m on iron rod only if I bought others low Brand ….. hmm. It’s well
Here is the quotation from my roofer for this particular project, I can send more than 10 copies of some of my roofing quotation / payment to my roofer on diff job to show the type of gauge we used for our project not only that most of our cleint do see this when in use. * check the date, the time, and the gauge of the roof with the price then. Also the gerald roof part is on the list as well. How much do I want go gain from such act … pls am more than that sir, am not bragging. But what can I say here if God said thing will happened noting you can do than to face it and pray for such not to occur again bcs human being are destined to face difficulties in this life. It’s only God that is perfect,
I pray to God to judge me according to my behaviors toward cleint and any others people in this life. YES If you haven’t encountered issue in your line of duty or in this life you will believed that’ others people with such issue presently are not perfect. Bye on this matter
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 4:08pm On Dec 24, 2022*. Modified: 8:06pm On Dec 24, 2022 |
kopell: So sad to read stories like this, imagine 1.7m wasted in this economy just because someone doesn’t do what they need to do right once. This is another example of people cutting corners, it’s always ends with wasting labor and resources. Actually I don’t want to talk on this matter again if not bcs of this latest version of the issue. They said we cut corner .. lolz anyway I don’t need to dwell much on it as argument. Even my own personal project I never used 0.45mm let alone client project. And more than 20 building that I have constructed here I never cut corner either you are there or not, I will do my work as it’s should be and move on to other project. I never cut corner on iron rod of about 8m ( original TMT Tiger) always Cement of about 3m Granite of 2m -Plumbing pipes and fittings Electrical pipe, DB etc It will now be aluminum of diff of N90k that I will cut corner … When I I can see diff of Almost 1.5m on iron rod only if I bought others low Brand ….. hmm. It’s well Here is the quotation from my roofer for this particular project, I can send more than 10 copies of some of my roofing quotation / payment to my roofer on diff job to show the type of gauge we used for our project not only that most of our cleint do see this when in use. * check the date, the time, and the gauge of the roof with the price then. Also the gerald roof part is on the list as well. How much do I want go gain from such act … pls am more than that sir, am not bragging. But what can I say here if God said thing will happened noting you can do than to face it and pray for such not to occur again bcs human being are destined to face difficulties in this life. It’s only God that is perfect, I pray to God to judge me according to my behaviors toward cleint and any others people in this life. YES If you haven’t encountered issue in your line of duty or in this life you will believed that’ others people with such issue presently are not perfect. Bye on this matter
|
Properties › Re: ROTECCH77 IS FRAUDULENT, INCOMPETENT AND A BIG LIAR by rotecch77(m): 2:22pm On Dec 24, 2022 |
We are legit All our work speak for us, In God we trust |
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 1:46pm On Dec 24, 2022 |
Our jobs speak for us In God we trust |
Properties › Re: General Finishings Of 5bdrs luxury Duplex At Ajah Area For Nl Member By Rotech by rotecch77(op): 1:44pm On Dec 24, 2022 |
Compliment of the season to you all |
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 4:03am On Dec 23, 2022*. Modified: 9:10am On Dec 23, 2022 |
somehow: Good job engineer
You really tried with this project.
Thumbs up. Thanks chief we really appreciated sir
|
Properties › Re: General Finishings Of 5bdrs luxury Duplex At Ajah Area For Nl Member By Rotech by rotecch77(op): 9:02pm On Dec 21, 2022 |
We are available to handle your project |
Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 8:51pm On Dec 21, 2022 |
We are always at your service |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 7:47pm On Dec 21, 2022 |
kopell: My Oga na so life be. The lord will forgive all of us. Amen sir |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 6:04pm On Dec 21, 2022*. Modified: 7:11pm On Dec 21, 2022 |
kopell: Hahaha, life niyen. Please try to listen to others opinions, don’t look at it as an attack. We are all learning everyday. Naa so my oga Sorry sir on his behalf, he has learned from his mistake |
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 8:39am On Dec 21, 2022 |
More pics
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 8:38am On Dec 21, 2022 |
More
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 6:38am On Dec 21, 2022 |
kalu61: You have failed to calculate the amount of time, miscellaneous you spent doing the errands etc and how much you pay yourself doing them.
I will like to point out one thing. They are Engineers, Architect and Artisans that have grown pass certain amount of Job pay just like in every profession based on experience and work load, it doesn't mean you can't get the job done.
Secondary, taste and finishing varies. Someone will still build the same two bedrooms with less than a 5m and someone will do same for 15m.
We have seen people build without DPC, without reinforcement except the lintels, flat roofing with Cameroon zinc, local stone, local sand(Erosion sand), moulding 45-50 blocks with 1 bag of cement, mixing ration of 1:6:6, low quality casement, paint window protector and electrical fittings etc. I can go on and on.
Don't generalize your opinion because you want to advertise yourself but if you claim l'm wrong, list the quality of materials used. . |
Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 7:40pm On Dec 19, 2022 |
ImperialCovfefe: I like this particular handwork. Please, drop the Benin man's contact. Thanks Message me on 08066619493 |
Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 4:56pm On Dec 19, 2022 |
ImperialCovfefe: This is beautiful, bro. Kudos. Can you link me up with the person that made the gates and fence rails for this project? Thanks Thanks sir Meanwhile the welder man is in Benin ( the site location) but if your location is in Lagos let me know I have another man that can do same here in Lagos |
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 10:26am On Dec 18, 2022 |
Watch out for more pics soon |
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 10:26am On Dec 18, 2022 |
folmus: Thanks
Do you supply or you would refer me? I don’t supply door now till January ending next year |
Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 10:24am On Dec 18, 2022 |
New week new deal, thanks to all our genuine esteemed client's |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 10:50am On Dec 17, 2022 |
money121: Thanks so much sir Congrats brother, more of such to all genuine guys |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 2:26pm On Dec 16, 2022*. Modified: 5:32pm On Dec 16, 2022 |
topsy23: The size of the pump is small compare to the litres of pump. The pump will over work and might likely affect the coil in future You are absolutely right. The distance matters, that is what we normal used to determine the size of pump. It also written on the pump but people don’t take notice of this. For example 1hp Height/meter @93m. It will deliver 15lts per minute @74m. It ..,, ……..45 lts. “. “ See interdab pump as sample So I can see that the OP bore hole distance to tank will be up to 100meters Means to get the 3000lts filled up it will take 3.5hours or so Calculation let’s say @100meter … 14lts 3000lts divided by 14lts =214 minute 214m divided by 60minute =3.5hours So to get your water tank of 3000lts capacity to filled up btw 1-1:30min, you will need 1.5hp or 2hp Another thing is that your bore hole must have enough water if not the pump will dry it up quickly
|
Properties › Re: Showcasing Of Our Finishings Work i.e,tiling,kitchen setup, plumbing,painting by rotecch77(op): 8:47am On Dec 16, 2022*. Modified: 9:59am On Jan 11, 2023 |
More pics of our work
|
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 7:37am On Dec 16, 2022 |
folmus: What is the cost of the bathroom wooden door and other Wooden doors for room? Where can one get them?
Thanks The entrance door is 300k The toilets doors Is N35k Room door is N40k |
Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 5:37pm On Dec 15, 2022*. Modified: 10:23am On Dec 18, 2022 |
We are here to serve you beta |
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 5:36pm On Dec 15, 2022 |
More loading |
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 4:10pm On Dec 14, 2022 |
Temi1: That's almost 2.4m Naira.  Yes with all the appliances and tiles Cabinet only cost :11,000 yuan |
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 2:47pm On Dec 14, 2022 |
More pics
|
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 2:22pm On Dec 14, 2022*. Modified: 2:45pm On Dec 14, 2022 |
Temi1: Pls how much did it cost to do the cabinetry in this kitchen? And is this HDF or MDF? 35,000 Chinese yuan Everything on the pics inclusive |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by rotecch77(m): 2:18pm On Dec 14, 2022*. Modified: 2:44pm On Dec 14, 2022 |
|
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 8:45am On Dec 14, 2022*. Modified: 10:00am On Dec 14, 2022 |
Still on the kitchen
|
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by rotecch77(op): 8:44am On Dec 14, 2022 |
omanzo02: What maximum temperature (hot water) can the PPR pipes withstand and what are the current market price? It can withstand 100deg Celsius. Price depends on sizes and maker |
Properties › Re: Construction Diary Of 8units Of 2/3brds Flat Structure By ARBO CONTRACTOR LTD by rotecch77(op): 8:40am On Dec 14, 2022 |
More pics loading |
Properties › Re: Remodeling Of Old Duplex To Modern Type By Arbo Contractor Ltd ( Rotech77 by rotecch77(op): 9:34pm On Dec 12, 2022 |
Laxer cut railing ready for welding and installation
|