Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 10:29pm On Apr 27, 2022 |
Call us for your cables today |
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 10:28pm On Apr 27, 2022 |
More pictures tomorrow |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 10:17pm On Apr 27, 2022 |
sethtsadopp: Sorry Boss, I remember seeing somewhere sometime you said 1.5mm is not good for earthing but that's what I can see on the last item here for earthing. Is it fine?
Sorry what do you mean by size, no vex I'm not a building person. It's a 5 Bedroom Terrace.
Lastly what do you think about labour. I already paid him 100k for the piping. This 200k looks much, how much do you think is fair. 1.5mm earth cable quoted is for socket and, AC and water heater wiring. Your main load cable according is 10mm so your main earthing cable should be 6mm What I mean by size is the number of bedrooms, bungalow or duplex. You have answered it. You can negotiate the labour since the electrician is in Abuja. That means you have two distribution boards Can you confirm what's the 6mm going to be use for? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 10:43am On Apr 27, 2022 |
sethtsadopp: Please I received this quote from my electrician for Electrical cabling. Kindly help me review, is it okay or bloated. And which one is advisable to go for between the two cables. Location - Abuja. Cc topsy23 The two cables are good. Cutix cable is in the class with Nigerchin and kabelmetal. You can't compare them to Coleman. Am not saying Coleman is good just that the second brand of it has flooded the open market if you are not buying from right source. Also, what is the size of the building before I can comment on the quantity |
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 10:57pm On Apr 25, 2022 |
Thanks for your calls |
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 3:48pm On Apr 25, 2022 |
Quality light for your project
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 12:40pm On Apr 25, 2022 |
KolaShangOne: I feel its much if its just first stage.
First stage means no external works, right? So I don't think he needs that much 4 inch pipes. He did not specify whether internal. To me he did not specify whether internal or external |
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 6:17pm On Apr 24, 2022 |
Happy Sunday to you |
Properties › Re: Electrical Piping Both Surface And Conduit by topsy23(op): 12:12pm On Apr 24, 2022 |
Thanks for your calls |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 8:35am On Apr 24, 2022 |
Billyjim: Please help me to review the quotation for the first stage plumbing work of 3 bedroom bungalow apartment(150 square meter).
CC topsy23 Twinskenny The plumbing quote is okay but I guess you are not installing water heater because no hotline pipe in the quote attached . Thanks |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 8:31am On Apr 24, 2022 |
Billyjim: Hello everyone the attached image is the quotation given to me by my technician for stage two wiring installation. Kindly help me review it. Does labour cost worth it for 3 bedroom apartment of 150 square meter. The workmanship cost for the stage one (conduit pipe installation ) was charged separately which was 40,0000 naira. Thank you in advance
CC topsy23 Twinskenny Why did he quoted for 6mm red since the 10mm is feeding the distribution board either from cut out or changeover. Do u have a separate DB for inverter/solar? If YES that means he is using the 6mm for the single phase DB. If NO there is no need of 6mm red Yiu can negotiate the labour, quite high. Also, I can't see earth cable for the distribution board in the quote, is he using 1.5mm green to earth the building, minimum size he can use is 4mm/6mm. IEE and British standard says not less than half of the load cable should be used as earth cable becos. It serves as neutral if your neutral fails |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 10:10pm On Apr 23, 2022 |
Aventures: So far xhinna PPR is still better than PVC. Some.ywars back my client insisted on German PPR product so I search and I got a contact of a company called critall at Ebute metta then I went there, to my surprise I saw them emptying their warehouse and loading it into container and I asked them questions and the guy that attend to me said the landing cost only is far higher than Chinese market retail price so they were sending the items back to France. So majorly it is Chinese PPR that is affordable and Turkey is good as well And you can hardly differentiate china PPR from Turkey PPR. Henco pipe is still the best |
Properties › Re: Importance Of Proper Earthing And Bonding System In Electrical Installation by topsy23(op): 2:15pm On Apr 23, 2022 |
Carmal90: Hello,
I have roofed my building without a lightning arrester, can anything be done to rectify this?
And when is the appropriate time to do the earthing?
Thanks Did you get my message |
Properties › Re: Electrical Piping Both Surface And Conduit by topsy23(op): 2:10pm On Apr 23, 2022 |
On going project
|
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 2:06pm On Apr 23, 2022 |
AC first fix on going
|
Education › Re: FUTA 400L Student Designs And Built Automatic Change Over (PHOTOS) by topsy23(m): 2:04pm On Apr 23, 2022 |
Nice to see this .. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 9:26pm On Apr 22, 2022 |
abuiltech: Although China ppr is cheaper, the issue is the service life, nominal working pressure, reliability, turkey ones are the best especially hakan, for plumbing, the quality of materials is essential, and no amount is too much to be incurred for having rest of mind, Well said |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 8:15pm On Apr 22, 2022 |
sonnie10: I like this. Do you label the switches and put a sticker on the cover panel to indicate which switch is for what? Yes we do. We call it circuiting. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 3:58pm On Apr 22, 2022 |
sonnie10: Good job you are doing. Will the finished work look like this? This set up makes life so easy. Just flip a switch when it trips. Every one of them is labeled on the panel cover. This is how the finished work look like
|
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 11:45am On Apr 22, 2022 |
Thanks
|
Properties › Re: Importance Of Proper Earthing And Bonding System In Electrical Installation by topsy23(op): 11:43am On Apr 22, 2022 |
Carmal90: Hello,
I have roofed my building without a lightning arrester, can anything be done to rectify this?
And when is the appropriate time to do the earthing?
Thanks It can be done if you your overhead water tank is on the roof or close to the building. The lightning arrestor covers about 45m radius for the conventional type called spike. Also the you can do your earthing when you are pulling the cables ... Also if you don't any sensitive equipment in the building, You can do only earthing system .. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 11:15am On Apr 22, 2022 |
cretin: very neat job, is there any advantage having it on the surface, instead of hidden or buried in the block work? prefer the buried type It's a renovation project and the client want it surface ... Most of our new installations are recessed in the wall. See below pictures
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 7:18am On Apr 22, 2022 |
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 9:18pm On Apr 21, 2022 |
redgem: Guys please I need the address for Bozac aluminium factory in Lagos.. Am not sure they are in Lagos. I was chatted up by their staff sometimes last year and she was telling me to be their representative in Lagos. But we could not finalized becos of logistics and other conditions attached |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 6:48pm On Apr 21, 2022 |
Recent final sub circuit distribution board termination.
Call us today for your MEP Design and installation
|
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 6:36pm On Apr 21, 2022 |
Recent distribution board termination
|
Properties › Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by topsy23(op): 1:01pm On Apr 21, 2022 |
Call us today |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 4:57pm On Apr 20, 2022 |
CMC180: Dears
How good is SeeBest electric cables
Electrician recommended
Cc Topsy Twinskenny Hearing the name for the first time though. Not sure the company is in Lagos. I konw of Berliac Cables and Wires that just started producing recently |
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 9:52pm On Apr 19, 2022 |
Call us today |
Properties › Re: The Making Of The "Anambra 7 Bedroom Castle" by topsy23(m): 5:58am On Apr 19, 2022 |
spyder880: To the glory of The Almighty God, we gather here once more to build another imposing edifice as usual. We have been awarded a new contract to build a 7 bedrooms duplex in Anambra state. Details of the project;
Project: New construction of a 7 bedroom duplex Client: A Nairalander Contractors: Spyder880 builders Location: Anambra state, Nigeria Duration: 120 days. (Carcass) Budget: To be revealed later.
Please stay tuned as we prepare to construct this building, using the best processes and adhering to best practices. We will start this project as from the 24th of this month.
My people, I thank you all. Congrats Oga spyder |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by topsy23(m): 1:55pm On Apr 18, 2022 |
Contact us for this quality LIPER light.
Catalogue is available
08033643191
|
Properties › Re: Nigerchin, Kabelmetal And Coleman Cables, by topsy23(op): 1:15pm On Apr 18, 2022 |
New price is out |