₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,327,554 members, 8,431,538 topics. Date: Monday, 22 June 2026 at 12:45 PM

Toggle theme

Yinkaoke's Posts

Nairaland ForumYinkaoke's ProfileYinkaoke's Posts

1 2 3 4 5 6 7 8 9 10 11 (of 14 pages)

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 6:47pm On Mar 16, 2020
@rotecch waoh looks good. Did u combine to save cost?quote author=rotecch77 post=87498032]

Yes you can do so, I did same here[/quote]
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 4:56pm On Mar 16, 2020
Hello house. Just to ask some questions.
Will it be nice to use two kinds of window, sliding window mixed with casement, but well distributed. Say like use casement on the front and sliding in the side of the house.

The essence is to manage cost because sliding window is less expensive than casement.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f):
I need a quick advice good people
I just concluded filling my house and set for flooring BUT my bricklayer wants another money to wet d filling with water to have it further settle for possible balance as there is still some laterite left. Again he wants another money for ramming before the proper flooring commence which has its own labour fees.

Please do l have to pay for wetting and then ramming after paying to spread d laterite ?
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 7:57am On Mar 12, 2020
Boyhood:
The cost depends on your location and design of the burglary but the normal normal normal type you can get at ±5k
Many thanks boyhood
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 8:12pm On Mar 11, 2020
Good day great people.
Please l need the cost of building/getting a burglary for a single normal window. How much does welders do a burglary? my experienced ogas help

I need it to be able to negotiate better please
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 8:42am On Mar 09, 2020
Good morning great people.
Please is N17k a good labour fee to do 1st stage wiring work: half conduit piping for a four bedrooms. Just piping for only cold water system with installation of distribution board.

Many thanks for ur advise
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 6:50am On Feb 25, 2020
Muyi002:
This was what I used for my 4 bedroom flat. All are internal plumbing works.

The materials were purchased by me so the process are genuine.

Location is ilorin
@Muyi002 and other great people please see full quotes. Please help me review.

3/4 PVC pipe 10 lenght for 4,000
50 pieces of 3/4 elbow PVC for 2,500
3/4 T 25 pieces for 1,500
1/2 inches pipe 3 lenght for 1,050
3/4 by 1/2 inche elbow 15 pieces 750
1)2 by 3/4 T 10 pieces 600
2 inche floor drain 5 pieces 2,500
2 inche elbow 30 pieces. 4,500
2 inche T 15 pieces. 2,500
4 inche pipe 32 length for 48000
4 inche elbow 12 pieces 9,600
4 inche T 4 pieces 3,600
4 inche vent cap 1,200
3/4 conduit verve 4200
3/4 adaptor 14 pieces 700
1 inche PVC pipe 18 lenght 10,800
Socket 1 inche 10 pieces 1000
1 inche elbow 10 pieces 1000
3/4 by 1 inche T 6pieces 600
3/4 by 1 inche elbow 4pieces 400
Tangit gum 3000
Tread tap 3 pieces 600
Labour 30000
TOTAL 135,100
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f):
@muyi n other great people. I will try n type the total bill soon l feel something is amidst
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 8:34pm On Feb 24, 2020
He is doing conduit piping after which we plaster then the plumber continue s with laying of external pipe to soak away. The sink n other assessories will be the finishing stage.
Geophilip:
the prices are ok, but the list doesn't appear complete, when you say internal plumbing, you know it deals with laying of inside the wall.
if you will later do surface piping outside the walls of the house i.e. everything isn't conduit piping, it means you might need to add little material to the proposed items because I can't see or there are little of the following

2 inches piping ( for flood drain, kitchen sink, washing hand basin etc also bathtub if you are going to fix)
4 inches pipe for the toilet

another question is it hot and cold water system piping? It is only cold

if there isn't going to be any surface piping, it means you need to buy more stuff. Yes that will be the second stage. This stage is to enable us plaster d walls
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 8:27pm On Feb 24, 2020
Thank you so much
quote author=topsy23 post=86920136]

That's the Picture of plastic box[/quote]
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 2:32pm On Feb 24, 2020
[Yes but only for 1st first stage, internal work only.quote author=Geophilip post=86915976]

are this all the items?[/quote]
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 1:17pm On Feb 24, 2020
Guys please help review first stage plumbing for 4 bedrooms bungalow:

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 6:44pm On Feb 23, 2020
[I wanted half conduit to easily trace fault. Don't know single core cable. Am not a technician .please can u post d picture of d plastic box. Thanks quote author=topsy23 post=86896543]

Just tell him to use plastic box as against the galvanise type

Do you plan to expose the single core cable in the ceiling?[/quote]
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 5:39pm On Feb 23, 2020
[Many thanks for this response as l expect more contribution. Do u mean that he quoted a price of a higher material for a lower one? Half conduit all d wires r exposed on d ceiling.uote author=topsy23 post=86895079]

The quote is fair enough but tell him to change all the 3x3 and 3x6 boxes to original dignity plastic box instead of galvanized. the price quoted is for plastic and not galvanise.

Also, what do you mean by half conduit??
Does it mean that some cables would be expose in the ceiling?[/quote]
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 3:25pm On Feb 23, 2020
House please help me review this too by d electrician for half conduit wiring, 1st stage piping for a 4 bedrooms bungalow
6 bundles of 20mn pipe at N3000 each
4 packet of 3by3 lron box at N1000 each
2 packet of 3by6 lron box at N1000 each
1 packet of 20mm cupler at N1000
3 packet of U box at N1500 each
I packet of cooker box at N1000each
1 packet of 6wax D/B board at N8000
Total N50,500
Labour N25000.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 2:42pm On Feb 23, 2020
Pls house help me review this quotation by my plumber for a four bedrooms. Thanks so much

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 6:59pm On Feb 21, 2020
ChiefSupplier55:
Well I recommend you use a turkey steel door 3ft there
The price is 56k
I
Can l v ur number. I need to see d pics for further discussion possible
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 8:34am On Feb 21, 2020
ChiefSupplier55:
See this at internal doors
And many more
Please which door can you recommend for a second kitchen door:exit to the compound and what is d price.

Please l do not mean internal kitchen door to the dining oh.

Thanks
Car TalkIs Toyota RAV4 2004 Model A Good Buy by yinkaoke(op): 7:40am On Feb 05, 2020
My friend asked me if RAV4 2004 model is a good suv, l told him am not sure but that it's not common as confirmed by our road observation. Please expect in the house help us with this decision. Is it a good ride?
Car TalkRe: Registered 2009 Toyota Corolla (upgraded To 2012) by yinkaoke(f): 2:35pm On Feb 02, 2020
How many times has it been painted?
What's d last price n what road does it ply
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 5:17pm On Feb 01, 2020
Muyi002:
Those are practically all that is required. You may wish to add DPC membrane (thick nylon) depending on the kind of soil/land that you have plus wire mesh to further it.

Good luck
@muyi002 many thanks sir but please some one knowledge needed.
As am about to floor n plaster my house what do l v to look out for when flooring to v it better in place for tiling. Must d floor be smooth or rough?
Also do l v to call in a carpenter to install planks call frames on my doors n windows before plastering even though l intend to use casement windows n doors that has frames, seems d modern ones comes with frames
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 6:58am On Feb 01, 2020
Good morning great people please what are the materials needed for a German floor. My Mason gave me granite, sharp sand and cement.
Please is this all?
Thanks as u respond
InvestmentRe: Treasury Bills In Nigeria by yinkaoke(f): 5:54pm On Jan 28, 2020
Hello house,
Please is there a thread where dollar n gbp investments are discussed. Like where to buy dollars at cheaper rate, when to hold n when to take exchange profits l don't mean forex please
InvestmentHelp On This Good People by yinkaoke(op): 5:46am On Jan 09, 2020
What To Expect For A Finance Office Job At A Merchant Bank
Good great people,

Please help a friend prepare for a finance officer job at a Merchant Bank. Wha are the likeky areas of questions to expect. Please l know not much of the banking industry.

Thanks as you reponde to help me. May God help u all too in your endeavours
InvestmentHelp On This Good People by yinkaoke(op): 5:41am On Jan 09, 2020
What To Expect For A Finance Office Job At A Merchant Bank by yinkaoke(f): 6:40am On Jan 07
Good great people,

Please help a friend prepare for a finance office job at a Merchant Bank. What are the like areas of questions to expect. Please l know not much of the banking industry.

Thanks as you reponde to help me. May God help u all too in your endeavours
Jobs/VacanciesWhat To Expect For A Finance Office Job At A Merchant Bank by yinkaoke(op): 6:40am On Jan 07, 2020
Good great people,

Please help a friend prepare for a finance office job at a Merchant Bank. What are the like areas of questions to expect. Please l know not much of the banking industry.

Thanks as you reponde to help me. May God help u all too in your endeavours
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 2:19am On Jan 05, 2020
Babs612000:
He should please load the pictures too and let us see how he manage to use N640k for four bedrooms.
.
Oh bross you think it should be higher?OMG for slate proofing? Jesus when l thought l did not manage n supervised well as advised.

Baba na true talk oh 650k. 4 bed on a half plot
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 6:04pm On Jan 03, 2020
Things are too expensive particularly in Lagos. Just finished roofing a 4 bedrooms bungalow all rooms ensuit for 650k and it's slate that was used oh with only d slate gulping 300k. Labour 60k for just d exterior n logging below. Diff represent s wood work n other assessories. Site in Ikorodu lagos
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by yinkaoke(f): 1:44pm On Dec 17, 2019
Please can someone help me with d picture of a 20tons man diessel and what is d price for filling sand. Please l don't want to be cheated

Thanks
InvestmentRe: Treasury Bills In Nigeria by yinkaoke(f): 10:00am On Nov 29, 2019
Hello fellows
Going by this new drop in rates by CBN, we need to carefully analyse what will likely happen next year with regards to rates.
My thought:
Cbn might be aligning with borrowing cost as referenced in d proposed national budget .so there's d need for us to study that budget
It could be that cbn in its attempt to free up d foreign exchange market next as rumored by aligning all markets to one n allow d interactions of demand n supply is reducing cost of borrowing in exchange for any surprises in d forex market.
It is also important to get n study cbn's budget with that of DMO.
I also believe all of this might be coming on d advices of d New National Economic team or advisory

Please let's all dialogue
InvestmentRe: Treasury Bills In Nigeria by yinkaoke(f): 5:50pm On Nov 28, 2019
ahiboilandgas:
true oil marketer smuggle fuel to chad ,niger and Benin and the closure had reduce it ..only small quantity is slipling out...this is reducing subsides payments but there are new cost (the recently approved minimum wage ) ,the cbn govenor is using unconventional tactics to stimulate the economy and save the naira (via fdi )so he directed foriegn inflow to omo markets (they still have good rate here ) while we the local investor are suffering bad rate to force money out to the real economy ...but the paradox is that they havent created the enabling enviroment
Logically as you sound. Ironically our foreign reserves is still dropping. I still checked that of yesterday. Also the OMO initiate for FPI is not liquid n by extension secondary markets activities has drastically reduced,.

1 2 3 4 5 6 7 8 9 10 11 (of 14 pages)