Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 12:32pm On Apr 29, 2019 |
Edglad: hello good morning just thinking if we don't advertise what we do or what we sell how then can we benefit from this group becuz everybody here is into Construction and there are many things our brothers here do or sell that we might not know then when we need their services we contact people from outside then come this forum and complain. I stand to be corrected Pls sir, what is the topic of this thread again? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 8:52am On Apr 29, 2019 |
bixton: Yes, nature has a way of purifying itself. But you should also consider that the deliberate activities of man are what destroys the ecological balance of the earth. Don't try such even if the depth of your borehole is 1000 metres. Nevertheless what you are proposing does not apply in an ideal environment. Practically the way we build soakaways in this part of the world is in no way the proper thing. Soakaway or septic as the case maybe are not supposed to be built as single or double chambers/tanks. One ought to have a separate chamber/tank where such wastes are first treated by natural occurring elements or by artificial means before discharging such effluents into the environment.
If we value our health, we''ll value our environment.
Even if it's a single chamber, as far as the chamber is anaerobic the sewage undergoes bio degradation in there. It's not like it travels "fiam" to the underground water, before it reaches the underground water it travels slowly over a long distance/time and most gets dried up in the process. And as it travels it still undergoes degradation and purification. Atimes the surrounding soil gets saturated and this makes the sewage stagnant thereby undergoing further degradation. Although flooding can mess up the whole process, that's why I said he should be more careful if the area is prone to flooding. Artificial treatment of sewage can be done in a day and you drink the water same day. But this natural process of treatment takes time. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 3:51pm On Apr 28, 2019 |
blacksta: Dear House
Currently doing a soakaway about 12 feet from an existing borehole... What are things to take in consideration.. So that the two never mix You need not worry, before the sewage from a soakaway gets to ground water level from where the borehole water comes, it has to pass through a lot of strata ; permeable, semi permeable and non permeable. Before it finishes passing through this stages it gets naturally purified. That's the nature's way of purifying impure/ contaminated water that perlocates through the soil. But then, the borehole should be sunk very deep, prevention is better than cure. Also if the area is prone to flooding, that's when you should be more careful. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 8:54am On Apr 27, 2019 |
segzy14:
Please extend it above the ground level so that when you put the interlocks or floor, it won’t be buried. Thanks, that's what I actually mean, whether to extend it above the interlocks/floor or to make it same level with the interlocks/floor. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 6:24am On Apr 27, 2019 |
Good morning house, Pls. Which is better between these two, to make the soakaway the same level with the ground or to extend it above ground level? |
Politics › Re: Gallant Biafran Soldiers Fought And Defended University Of Biafra Now UNN (pics) by bobkezel(m): 3:56pm On Apr 23, 2019 |
Karatum: I remember those days mehn.. The nostalgic feeling What does karatum mean? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 12:15pm On Apr 21, 2019 |
Rubbiish: This size serve for the septic tank and soakway with a partition? Yes |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 9:38am On Apr 21, 2019 |
Rubbiish: Not a must But what is the size of your soakway? 12 by 10 ft, 12ft deep. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 11:52pm On Apr 20, 2019 |
bixton: Please run a beam then. Let your beam be the height of a block.
In my previous brief story of using a 5" block(solid) instead of minimum 6" block being procured by my client. At the 4th course, the blocks were waving like a wind action was upon them. My mason carefully managed to put the 5th course. It got me wondering because I did not expect given the size of the tank. I had made provisions for columns but never intended to run a beam since my intention was to use 9" hollow blocks. But given the new situation I had to run a beam.
I have previously post a pix of it but I'll do same again. Just you see the size. Thank you boss, beam was run finally. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 9:52am On Apr 20, 2019 |
bixton: There are no implications whatsoever. It's just done as a safety precaution. In the absence of not doing columns, I'd rather advice you do a weak concrete mixture to fill your block holes to that point. I want to believe your mason understands block bonds especially at the joints(edges/corners). The blocks are not hollow blocks, they are 6" blocks. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 9:05am On Apr 20, 2019 |
diordaves: Omo, I beg to differ with most of your recommendations regarding this enquiry.
One: All soakaway/septic system should have columns - this is best engineering practice. When people come to you for advice, always recommend and encourage best practice. Soakaway without columns is cutting corners - Period.
For the poster to come here with that post, it may be true that someone on ground with knowledge of the soil condition may have recommended introduction of columns and beam which is a superior advice. But here you are I guess with no knowledge of the soil condition encouraging an inferior solution.
Two: After 5/6 courses, all round beam (chaining) should be introduced to prevent unintended collapse - best recommended civil engineering practice. After the next 5/6 courses, beam again and then deck.
Death from soakaway collapse in Nigeria is an unreported world. This is preventable death by spending just a fraction more to recommended best practice in health and safety.
Imagine Nigeria with poor quality blocks that will be constantly wet and soaked as a septic tank and then you construct such soakaway without columns and beam. - to me it's an accident waiting to happen especially during the raining season over time.
So building a safe soakaway is not a matter of choice like you posit. It's a conscious deliberate decision. You are right to an extent, but let me chip in something. My neighbour build his 1st soakaway with pillars/columns and cross beams but unfortunately it collapsed. He rebuilt it 2nd time without pillars/columns, he only introduced beams in the middle. This 2nd one without pillars is intact. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 6:23am On Apr 20, 2019 |
bixton: It is a matter of choice depending on circumstances around. If you feel there's no need ensure you don't exceed 5 or 6 course on the first day before rounding up the next day. But is there any implication to this? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 10:51pm On Apr 19, 2019 |
yaliyu963: Definitely. you can do that. you can hollow fill the blocks for strength taking a careful attention to the soakaway section What about pillar and beam in the middle. Is it a must? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 10:45pm On Apr 19, 2019 |
bixton: Are you referring to middle with regards to the decking slab or ? If I may ask did you introduce columns at certain points during construction ? I mean a beam being introduced in the middle of the block works. After which block works continues to deck level. There was no columns. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 6:58pm On Apr 19, 2019 |
bixton: It's still on the affirmative. Hello bro, must it have a cross beam in the middle? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 11:27am On Apr 18, 2019 |
segzy14:
12feet depth for the soakaway and the septic tank is fine. Thanks boss. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 10:01am On Apr 18, 2019 |
segzy14:
Spyder880 is correct, a 9inches hollow block is about 23kg and it will weigh more if it is solid. Oga segzy, I am digging a septic tank and soak away of 12ft deep which is going to be divided by a partition. I was thinking the SA should be around 9/10ft deep while the ST should be 12ft but he said both should be 12ft without stepping down. Pls is this advisable? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 7:34pm On Apr 17, 2019 |
Good evening house. The engineer handling my house wants the soak away and the septic tank to be on the same level without step down. Pros in the house, is this advisable? |
Christianity Etc › Re: Easter: Bishop Hilary Okeke Bars Members From Chieftaincy Titles In Nnewi by bobkezel(m): 3:29pm On Apr 16, 2019 |
Bishop ndị ara. |
Education › Re: If You Know Prime Numbers You Should Be Able To Solve This Shape (Photo) by bobkezel(m): 9:05pm On Apr 15, 2019 |
This one no hard na, na 7 |
Properties › Re: When Last Did You Use Your Dinning Table At Home? by bobkezel(m): 2:51pm On Apr 12, 2019 |
This question really reminded me I have a dining room in my house. When I get home today I am definitely gonna go sit there and think why I had it in the 1st place. But as for eating there, no way, I eat on the floor inside my room. I like spreading my legs wide and bring the food close to my blokos, or I fold my legs like almajiri. Who dining room epp. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 8:13pm On Apr 11, 2019 |
Edglad: haha u asked a question some1 took his time to explain and u say the person is vibrating if u don't understand y don't u just tell him politely I was not rude na. That vibration is in the positive confusional sense. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 7:39pm On Apr 11, 2019 |
bixton: It's still on the affirmative. OK, thanks. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 4:52pm On Apr 11, 2019 |
Hajivince: As a Certified Civil Engr, I would like to add to what @Bixton has said.
1. There's a span/depth ratio for every slab before it fails for deflection. The greater the span, the higher the depth of slab & the higher the cost in terms of concrete. Thou most people do not understand why it is done, the major reason is to reduce the span as much as possible & if the Bearing capacity of the soil is favorable, the Block walls in the sub-structure can serve as Load bearing.
2. Most Damp proof course (DPC) is plainly concrete & concrete is only good in compression & poor under tensile force. The reinforcements in Reinforced concrete takes care of tensile forces which reduces tensile failures in suspended slabs but it is also a function of span/depth ratio. Since most DPC has Lil or no tensile stress acting on it, it is advisable to keep the span to a bearable minimum to avoid shear or axial failure that may occur due to partition loads & some kinda imposed loads as the case maybe.
Thanks & I hope this help Truth be told I don't understand anything u said here. You were just vibrating. Bring those terms down to an understandable and simplified term lay people like me can understand. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 4:45pm On Apr 11, 2019 |
bixton: Yes you can. Sorry bro I meant without |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 1:13pm On Apr 11, 2019*. Modified: 4:50pm On Apr 11, 2019 |
Good morning experts in the house, I have a pressing question Can I do soak away and septic tank without columns/pillars? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 8:46am On Apr 09, 2019 |
nwoye72: How much is iron rod now thanks 2k for 12mm 500 for 1/4 |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 11:04pm On Apr 08, 2019 |
Adedward: Gud evening house, sorry for late respond , l am the one of the aluminum roofer in the house, (1) firstly l understand all what ogas in the house has fire out. The true is that there is no roof measurement are the same but it must not more than 20 to 30 metres. But in a situation where by we seen almost 100 or more than per Squar metres different, there is something wrong somewhere, (2) I think my client is listening here, is a naira lander too, he ask me to measure his house last two months, l measures the roof, he have call several roofers to measure for him, but he later call me, and explained to me how l gets my measurement, l explained to him, he ask to sign on his documents before started the roof, which I did , which means my own is almost 80 metres different to others that is why is doing that, but thanks god l signed on his documents and finished the roof, without any shortage at all, is naira lander here (3)so my advice to the client is that they should be vigilante before on a too measurement, I don't think there is big things on how to know the real measurement on a buildings , thanks Pls I don't understand swahili, can someone help translate this to German or English |
Health › Re: Help!! Weed Has Damaged The Brain Of My Brother. by bobkezel(m): 2:00pm On Apr 02, 2019 |
Your cousin's predicament has nothing to do with weed. You guys better take him to a psychiatrist for proper evaluation before he becomes full blown. Weed does not cause mental problem. Your brother is a nut case. Take him to a psychiatrist. Nwanne gị nwoke na anazi nko. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 4:45pm On Mar 17, 2019 |
uyijiano4u: bro I was charged 40k for clearing of a plot and after about a week I re paid an extra 15k, they said it was due to the rain and that the grass re grown, so bro I will advice if yu are on ground and ready to begin the project yu can go ahead, but if not it will be better yu wait Alright, thanks man. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 7:05am On Mar 17, 2019 |
bixton: If you're using someone who uses a chain saw it might be cheaper. The next is get someone who will remove all stumps entirely from the ground and move all to a safe place. The person is using chain saw and he charges 500/tree. They said I can't remove them entirely cos there's no available space. So they suggested I plwce them around my boundaries that it will get rotten/soft with time, and can then be easily disposed off. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by bobkezel(m): 7:37pm On Mar 16, 2019 |
anochuks08: hmm ke, use ur hand do am na, abi can't you uproot common palm tree and bamboo? Izza zimple zduff |