₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,331,409 members, 8,450,205 topics. Date: Wednesday, 22 July 2026 at 10:54 PM

Toggle theme

Ceelog's Posts

Nairaland ForumCeelog's ProfileCeelog's Posts

1 2 3 4 5 6 7 8 ... 13 14 15 16 17 18 19 (of 19 pages)

Nairaland GeneralRe: 2016 Mandela Washington Fellowship For Young African Leaders by ceelog(m): 4:44am On Nov 06, 2016
dossylvanus:
Yo Bro. Greetings to you. I want to. Know What identification document did you use?
International Passport.
InvestmentRe: Treasury Bills In Nigeria by ceelog(m): 5:30pm On Oct 31, 2016
He specifically said they only do for Access and it every Wednesdays. I will ask Diamond bank tomorrow. But what date is the primary market bid?

buchio7:
don't mind them... primary bidding always occurs....it could be that you came after the deadline had lapsed...(had similar issue with Standard Chartered)..

but I still waited till the next auction round and bidded via the primary market.....so my advise is for you to wait for the next auction cycle in 2 weeks (try and go on the Monday b4 the bid as early as 10am)
InvestmentRe: Treasury Bills In Nigeria by ceelog(m): 11:10am On Oct 31, 2016
Greetings guys am a newbie but am interested in investing in TBills. I just came out of Accessbank, Nsukka and they are offering 15% for 108days and 17.2% for 297days. The manager said no primary bidding. Do I look for another bank or keep insisting?
InvestmentRe: Treasury Bills In Nigeria by ceelog(m): 11:10am On Oct 31, 2016
Greetings guys am a newbie but am interested in investing in TBills. I just came out of Accessbank, Nsukka and they are offering 15% for 108days and 17.2% for 297days. The manager said no primary bidding.
PropertiesRe: Ask All Your Questions On Building Foundations/structural Issues -expert by ceelog(m): 7:56am On Oct 07, 2016
Greetings. Could you please explain further on the bold statement? "Using same type of stone"

Can u share your email?


opalu:
I have been involved in the structural corrections of more than 1,250 buildings that were wrongly built in the past 10 years.
In all, I have discovered the major reasons why buildings fail structurally are
1. Lack of professionals on the project. The some sub reasons that owners give are that they don't have money to pay them since their charges are avoidable. And also that they themselves have ideas about buildings etc. When there are no professionals on the project, such project will not have the necessary CORRECT designs/drawings. Such projects won't have the right professionals Supervising the Construction Process.
2. Another major reason for Structural failure and foundation issues is the use of substandard materials. These include reinforcements, Sharp sands, Granites, Cement even Water etc. So many Rebars being used can easily cut or rust. Water that contains impurities is not safe for concrete a since those impurities attack the concrete. (Chemistry 101). A Man wanted quote one day and I gave him. But he went for one desperate Contractor who used filling sand to cast concrete! After 6 months, the suspended slab (decking) started vibrating like water bed. I was also called upon and i corrected it at a cost 3 times the cost to build a solid slab. In addition, using the same size of granite (coarse aggregate ) can weaken the concrete.
3. Another reason for failure in buildings is the use of wrong methodology in construction. For instance there is a method whereby wet concrete is vibrated in order to expel voids and holes inside. If you are using pole vibrator, it has to be poked into it left in there for brief interval and removed and poked somewhere else. Some quack roadside casters just use stick to shook here and there or hit here and there. Even if the vibrating machine is used wrongly, it will trap voids. Every construction work has best practice that if not followed, the result will be bad. Another example is that when a carpenter lays the 1x12 for first floor slab, every hole between the planks must be covered with well sliced cement bags nailed with tiny nails. This should be done before laying of reinforcement. Reason being that when casting is done, the wet concrete usually slip through those holes thereby weakening the lower part of the slab which is subjected to tensile stress. But due to the leakage of the concrete at that bottom, what plasterers usually do is to fill it with mortar before plastering suffix of slab. But don't forget that the reinforcement were exposed before. So structurally, the bottom reinforcement is nonexistent. So when there are tensile forces, the slab cannot withstand them and what do you get? CRACKS!!! Then your fine POP starts cracking, blocks starts detaching at first floor and even crack etc.

Let me stop and await your questions.
PropertiesRe: Hire Dump Trucks At A Cheap Rate, And U Can Also Call Us For Quality Granite by ceelog(m): 9:28pm On Oct 06, 2016
smiley001:
Check your inbox sir, we apologise for the late response.
Do you deliver granite to the East Esp Orlu Imo State?
PropertiesRe: A Roofing Project In Umuahia From Scaffold by ceelog(m): 12:44pm On Oct 02, 2016
princejones:
OK,my email is princejones33@yahoo.com and do send me the structural diagram of the building
Sent
PropertiesRe: A Roofing Project In Umuahia From Scaffold by ceelog(m): 9:21am On Oct 02, 2016
princejones:
“It's not what we eat but what we digest that makes us strong; not what we gain but what we save that makes us rich; not what we read but what we remember that makes us learned; and not what we profess but what we practice that gives us integrity.”
Prince I need an estimate for nogging and longspan roofing for a 125m2 house of 14ft height
An please drop ur email
PropertiesRe: Contemporary Ceiling Designs For A Nairalander. by ceelog(m): 6:59am On Sep 28, 2016
Dominionng:
Concepts.
Would be glad to know how this plasterboard compares to POP in cost, aesthetics and durability.

I do enjoy ur works Sir.
PropertiesRe: OUR RENOVATION Diary-platinum Row (A New Dimension To Nigerian Architecture) by ceelog(m): 6:53am On Sep 28, 2016
This job reminds me of Restoration SOS and Fixer Upper!!!

Abeg what is the reason for the reinforcement rods in the bathroom? Any advantages?


skimanski:
Updates from Master's Bathroom
PropertiesRe: OUR RENOVATION Diary-platinum Row (A New Dimension To Nigerian Architecture) by ceelog(m): 6:51am On Sep 28, 2016
skimanski:
Updates from Master's Bathroom
This job reminds me of Restoration SOS and Fixer Upper!!!

Abeg what is the reason for the reinforcement rods in the bathroom? Any advantages?
PropertiesRe: 4 BEDROOM DUPLEX (A New Dimension To Nigerian Architecture) by ceelog(m): 9:48pm On Sep 25, 2016
skimanski:
Hidden Slab BEams to Ensure Proper reinforcement in areas with Slightly Larger Slab Space
Pls are these hidden beams similar to those that are often seen in most living rooms running from One end to the other? Why did u us 6rods on it? Is the middle rod 12mm?
PropertiesRe: How We Build Duplexes In Nigeria by ceelog(m): 8:51am On Sep 25, 2016
Do you need a soil test for plint beam foundation?

podosci:
Technically you need a soil test to determine the type of foundation to be done weither bungalow or duplex......Specifically Any Raft foundation or pile foundation done without the result of geotechnic test is wrong.
For bungalows where the load is very small and a strip is to be used an alternative method not sactioned by most literature is physical obersavation of the sorrounding buildings to check how the building interact with the soil and the foundation used.
Science/TechnologyRe: Thread For Solar System/Electricity Owners in Nigeria. by ceelog(m): 9:58pm On Sep 17, 2016
anochuks08:
If you are around Enugu, I ll take a look at your setup to find out whats wrong.
Please do u service inverters? Mine has developed a fault I think
PropertiesRe: Pre Cast Parapet, Roofing And Finish Of A Duplex In Umuahia by ceelog(m): 6:27am On Sep 15, 2016
spyder880:
I started the project from the parapet only.
Greetings Spyder. Pls what was d lenght of d parapet and how was I cost? Everything including labour.
PropertiesRe: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by ceelog(m): 5:44pm On Sep 10, 2016
dubemcapital:
Screeding is better with a normal cement...
Greeting Dubem. God bless your efforts. Pleas did u screed d outside walls? With cement? Pls explain which cement and thicknes of the mix
PropertiesRe: The Making Of A "Cute" 5 Bedroom Duplex In Port Harcourt by ceelog(m): 6:20pm On Aug 21, 2016
spyder880:
Which location Sir?
Nkwerre, Imo
PropertiesRe: The Making Of A "Cute" 5 Bedroom Duplex In Port Harcourt by ceelog(m): 4:31pm On Aug 20, 2016
spyder880:
Average of N10 million for construction stage, another N10 million for the finish stages, depending on what your tastes in finishing is.
Spyder please is it possible for a similar project like this (4bedroom duplex) with 10.5m by 9.5m to be completed with N7m...till steptile roof...no parapet.

And what will be the cost estimate till decking? The land is flat and foundation will carry only 4blocks till dpc.
Thanks
PropertiesRe: The Making Of A "Cute" 5 Bedroom Duplex In Port Harcourt by ceelog(m): 9:26am On Aug 20, 2016
spyder880:
This is the site information, you can see that the land is properly utilised with some good spaces left in the front and back of the building. .........
Welldone spyder. Pls could you give the lenght per breadth of the ground floor? This building is nearly similar to mine. I want to observe the sizes of re signing off the project.
PropertiesRe: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by ceelog(m): 8:37am On Aug 20, 2016
dubemcapital:
Lintels, floor slabs, parapet. Etc
Okay...so it wasn't used at foundation stage. Just bought to be used later? Right? From your experience...should one buy all his iron at once? Even though I will be spacing the foundation and decking over a 12months waiting period?
PropertiesRe: *Building A 6 Bedroom Executive Duplex In A 340sqm Land -Enugu. by ceelog(m): 7:33pm On Aug 18, 2016
dubemcapital:
I will like to state the Materials used to achieve every stage, starting with this stage and the workers pay. However, my service and hired Woking tools will not be inclusive here.

1)Blocks : 1300 pcs of 9" holed
2)Cement: 163 bags of cement
3) 16mm rod: 27lenghts
4) 12mm rod : 25 lgt
5) 8mm : 15 lgt
6) 1 roll of binding wire. (still remaining)
7) 1/2" Hardcore stone: 2 trips
8 ) Gravel : 5 trips
9) Sharp sand : 22 trips
10) Planks : 29 pcs
11) Poline : 30 pcs
12) 1/2 bag of nail and 4P/weight(still remaining)
13) Thick Nylon: 2roll of 7kg & a roll of 10kg
14) 4" blue pipe 4lgt, 2"- 4lgt, 3" 4lgt.

Workers pay: #325,473.00 only. (excluding Engineer's & plumber's )

Thank you for following... please follow us as the 1st form block work after dpc kicks off on Monday, thank you. Do Have peaceful weekend. (Questions are expected)

Great job brother..please where did u use 12mm rod?
PropertiesRe: How We Built The Port Harcourt "4 Bedroom Duplex" by ceelog(m): 7:09am On May 22, 2016
spyder880:
We prepared a wooden staircase that will be in use temporarily for the decking cast.......
A quick one spider on the need of such staircase. Why don't builders use the house staircase? If casted or uncasted? This staircase used a lot of wood, which may not be reused.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by ceelog(m): 6:50am On May 22, 2016
mufutau55:
They are lovely o.... but simply, in my own case; I am a very poor man.. so I just build with the simple and minimal cost items.
But we will probably see that in EgunM's real bungalow build when the time comes.. he is the modern one.. not I o.
I believe Fastshipping posted some way back and Brabus showcase some on his thread.

Hajji M.
Poor man indeed!!!!
But you inspire more much "poorer" people than you here.
PropertiesRe: Nexthome: 2016 Construction Daily Updates. by ceelog(m): 6:16pm On May 21, 2016
n3xt:
Upcoming | Exposed Beam Ceiling




Brabus
Greetings Brabus...what are the pros and cons of this vaulted ceiling in Nigeria?
PropertiesRe: Construction Of Six Bedroom Duplex At Enugu by ceelog(m): 7:47am On May 21, 2016
mufutau55:
What will these guys gain in lying? Is your supervisor procuring the materials or not?
When there is a middle man between Builder and Client there is bound to be wahala in-between.
Do you have another way of checking your Supervisor to see if the material procurements are adequate?
Think about it. I am not accusing anyone here o, just an observation.

Hajji M.
I know I don't have permission to tell what I observed. I have seen that site and the issues of supply. Podo was not lying. They were waiting to complete the wood supply the day I was passing by the site. Too many middlemen.
PropertiesRe: Construction Of Six Bedroom Duplex At Enugu by ceelog(m): 7:05am On May 21, 2016
abdulwastecx:
My second (podosci) would be around, I can tell him to see you so you guys can discuss sir... . Thanks
Met these great guys on this site...this house is massive and their build style and strength is very professional.
I really hope our new found friendship brings beautiful memories.

Well done to the double Abduls
PoliticsRe: Day 3: NLC -TUC Strike Updates by ceelog(m): 3:19pm On May 20, 2016
Well the strike just affected Enugu...UNTH has been partially shut down by NLC just now. Only skeletal medical services are being offered...see pic below

Car TalkRe: Questions To Ask Your Mechanic Next Time You Visit by ceelog(m): 6:48am On May 19, 2016
I recently changed my blown radiator with a new one that had an inscription "do not use coolant"... with what you have said...should I just use a coolant instead of water?
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by ceelog(m): 5:48am On May 14, 2016
EgunMogaji:
I'll just tell you the design that I have for my garage apartment.

The ceiling is 12 coaches high which is about 12 feet, that's pretty high. I'm not using POP so I'll loose very minimal height for the actual finished ceiling. Heat trap will not be an issue because there will be a solar powered whole house fan that vents directly into the attic. There will be two gable vents on either side of the attic wall where the hot air should naturally escape.

I'm also using casement windows that have projections at the top. These type of window will allow me to at least crack open the projected windows during inclement weather or at night. That in conjunction with the whole house fan will make sure that air is moved throughout the house.

You should go for whatever design, style that floats your boat. It's your house and you won't be asking anybody to finance it. If you get a good Architect and a builder that doesn't think he knows what you need more than you then you'll be okay.

Costwise, windows design is the same price, whole house fan is maybe $150 and gable vents can be constructed by local artisan. I talked to my local welder and he thinks he can make the whole house fan. My stuff might look expensive but they really aren't. I just have a knack to thinking outside of the box, and I take my sweet time.
What do u mean by solar whole house fan? One big fan or more than one fan? Any pics?

I love your practical window concept...most guyz use windows with that upper part fixed.