Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by ceelog(m): 10:20pm On Oct 01, 2017 |
alstacs: Good response sir. This is really helpful in guiding my negotiation. But I'm just curious, what informs the 20-25k window you chose? Was it based on previous experience or experience of others etc? Just based on what I read in some threads her on NL |
Properties › Re: Please Was The Cost Of Building A 4 Bedroom Bugulow Now! by ceelog(m): 5:21am On Sep 30, 2017*. Modified: 5:49am On Sep 30, 2017 |
SEOManiac: Seriously, see people shouting 15m and 20m, and I'm surprised.
Something of 5m... If it goes past 5, then obviously, the OP is furnishing with top choice materials.
My friend just moved in 6 bedrooms duplex last month. Total cost 19m, out of which land was 4.5m and roofing was 4m.
He also interlocked the compound, and built a security house, all in the said 19m. I was completely involved in the whole process. Even lighting and chandeliers were up to 1m.
How much then can a 4bd bungalow cost? With moderate finishing? So Bros this your friend used 9.5 million (that is excluding 4.5m for land, 4m for roof and 1m for lights) to build, plaster, paint, tile, interlock, put amenities in a 6bed duplex? Please there is a lot you are not telling us. Give us a rough breakdown of how that was achieved. I ask because am directly involved in my own low cost build. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by ceelog(m): 5:02am On Sep 30, 2017 |
alstacs: Talking about fair pricing for workmanship for an electrician to lay conduit pipes on decking, what would you consider fair price? The deck is about 10m X 16m and it sits on 3 rooms, 3 bathrooms and a siting room.
Just wondering what may be fair pricing for a plumber at this stage too. An electrician (coming from another state and region) gave a quote of 50k for a 10m by 11m deck (excluding materials) and I have told him NO...I will go for a price range of 20 to 25k Max. Is my negotiation fair? |
Properties › Re: Re-modeling Of 7bedroom Old House (ogun Water Side LG) Abigi By Rotecch 77 by ceelog(m): 7:00am On Sep 15, 2017 |
rotecch77: Various Granite design for kitchen top Please how much are these granites sold? By square meter? |
Technology Market › Re: Thread closed by ceelog(m): 6:15am On Sep 14, 2017 |
My Samsung j5 dropped into water. After pulling it out and drying it continued working but now it's touchpad is not responding at all. I have just been told I have to buy screen and touch together that they are inseparable in j5...is that true? How much are these assessories (j5 screen and touchpad) from you? Original gold. |
Properties › Re: Estimate For Decking by ceelog(m): 1:42pm On Sep 01, 2017 |
donbuchi1: I just completed the decking of Two units of two bedrooms down and 4bedrooms up. That is 3 flats in all. So the difference between urs and mine could be about a space for 2bedroom worse case. That is ur project is about 2 bedroom bigger.
Mine is at ikorodu. Where is urs? Location can affect cost. Please be patient I m in transit now but in few days I will fully send u my cost analysis. I spent about 1.8m not compromising quality. Do you know u can spend less than half the amount quoted on wood alone.
Don't be in a hurry to build another man's house. Still waiting to know how to spend half the amount on wood. Never too late to share. |
Properties › Re: Cement, Sand And Granite (concrete) Mix Explained by ceelog(m): 8:41am On Aug 29, 2017 |
saydfact: with gravel u might need to reduce the sand content because the gravel itself comes with a lot of sand....... it is advised to reduce the sand, try a mix with 1 bag to see how it affects the final concrete and stick to what is thought best for the rest of the mix.
Thanks What are your thought on washed gravel? Say if left under the rain for a few months. Does I make it neater? |
Properties › Re: The Making Of A Low Budget 5 Bedroom Duplex (with Costs) by ceelog(m): 8:06am On Aug 26, 2017 |
spyder880: Now am doing a test here, I told my window guy to make me a window and we had to test this protector type on the windows, still trying out another style before I finally ask them to produce all. The pipe painted white is really a galvanized 1" pipe. Lovely. Waiting for its cost and it's measurement. How will net come in? |
Properties › Re: Reconstruction Of An Uncompleted Two 3 Bedroom To A Duplex Plus Hospital by ceelog(m): 5:23am On Aug 24, 2017 |
helpee: The digging of the two septic tank in search of filling sand took some time away from rounding up the foundation. However it is worth it since we no longer need to buy any filling sand whatsoever so at least some money saved. We should start casting the DPC tommorrow. Pardon my curiosity I thought septic tank (and underground water tanks) need to be pillar and beam cast with concrete and steel for durability Did you consider that? I love your doggedness |
|
|
Properties › Re: New 10 Flats Of 2 Bedrooms Construction In Onitsha City by ceelog(m): 11:34pm On Aug 09, 2017 |
|
Properties › Re: New 10 Flats Of 2 Bedrooms Construction In Onitsha City by ceelog(m): 8:21am On Aug 09, 2017 |
spyder880: All is ready here, my casting team arriving Onitsha to resume works this morning. Greetings Spyder. Please how much is 16mm, 12mm and 10mm rod at Ogbo rod as at today? Am been ripped of at Orlu. |
Properties › Re: How To Buy An Inverter For Backup Power by ceelog(m): 9:36pm On Jul 26, 2017 |
froz: Power Inverters are Electronic gadgets that converts energy stored in a battery to AC current that will power your appliances. Their major selling points are their low noise and emission free operations as well as their convenience. This article will guide you on how to buy an inverter for backup power in the home or in the office.
First, Reality Check
The first question to ask yourself is do I actually need an inverter? This question is important because while inverters are alternatives to power generators they are not quite as versatile.
The first challenge for a power inverter is that you need to charge the batteries.
You need electricity to charge the battery of your power inverter and if you live in a country like Nigeria where public power supply is not steady you may not get enough public power supply to charge your battery, which could result in poor performance of the inverter or inability to use the inverter at all.
The ideal person to buy a power inverter is someone who has at least 12 hours of public power supply per day or someone who already has a power generator, but wants a noise free alternative.
For example, I use my power generator during the day (if power supply becomes epileptic, though thankfully in the past couple of weeks power supply have been stable in my area so my generator have been resting for weeks now, though I still warm it up every 10 days) and use my power inverter at night because they operate at low noise and are night-friendly. The generator also charges the inverter battery while it is on.
Now that power has stabilised (up to 12 hours per day) in my area I now use just the power inverter to meet the shortfall in supply.
However, if you are in an area with less than 12 hours of public power supply, it will not make a lot of sense to buy an inverter, except you also have a power generator or you are willing to invest in a solar power system with solar panels.
It is also important to note that a power inverter is more suited for resistive loads like your household and office electronics like TVs, Computers, Printers, lights, etc.
Power Inverters are not best with inductive loads, so if you are going to be operating lots of machines with motors in them, a generator may be better, except you can find an industrial grade inverter.
Inductive loads like Refrigerators, Freezers, and Air conditioners can be powered by an inverter, just make sure you buy an inverter with high enough capacity and capable of handling their high start currents.
For example, the starting current of a refrigerator could be up to 3 times its current in normal operation. S0, a 200w refrigerator requires up to 600w to start. A/Cs are even worse.
Your Power Needs
Once you are sure you need to buy an inverter, the next stage is to calculate your power needs. Simply note the gadgets that you will be operating with the power inverter.
For example, typical load may be 1 TV set, 1 decoder, 1 DVD player, 1 Fan, 1 Laptop, 3 light points.
Then note the power ratings of each of the gadgets. You can find the power rating on the back or side of the gadget. You can also check the manual of the gadget. For example for the load above, the rating could be:
1 TV set (100w) 1 Decoder (20w) 1 DVD Player (20w) 1 Electric Fan (70w) 1 Laptop (20w) 3 energy efficient light points (90w) Total Load = 320w The next step is to get a VA equivalent of the power, which if we assume a power factor of 0.8 gives 400 VA (i.e. 320/0.
After calculating your total load, the next step is to derate the power inverter to create some allowance for flexibility and to ensure it does not over work itself.
To derate, just multiply your total load by 2. In the example above 2 x 400 = 800VA. So, you will buy an inverter with a power rating of 800VA or higher like an 800VA Inverter.
You may also decide to multiply by 3 to give more operation allowance for the Power inverter. Note that the aim of derating is to ensure that your inverter does not operate at full-load or near full-load, which will ensure the longevity of the device.
Type of Battery
You don’t just buy an inverter, you also need to buy an inverter battery as that is where the power inverter derives its energy.
The best battery for your inverter is the SMF deep cycle inverter battery. SMF stands for Sealed, Maintenance Free. Though you can use the normal car battery, but they emit poisonous fumes which could have long term impact on your health. This means an SMF battery can be installed indoors making them very convenient.
Another type of battery to use if you do not mind some maintenance is the tubular battery, which are also deep cycle batteries, but require some maintenance.
They require less maintenance compared to car batteries. Tubular batteries are not advisable for installation indoors as they are not completely sealed and could be emitting gases.
deep cycle batteries last longer than regular car batteries because they are optimised for the loading characteristics of power inverters.
They may cost more, but we recommend you buy an SMF deep cycle battery for your power inverter. If you are looking for cost effectiveness and do not mind some maintenance, go the tubular deep cycle battery.
Number of Batteries Required
An inverter is usually rated in this pattern X VA/Y V, where X is the rated power output and Y is the input voltage required.
For example an 800 VA/12 V inverter will give output power of up to 800 VA and require an input voltage of 12V. Similarly, a 1.5 KVA/24V inverter will output 1.5 KVA (1500 VA) and require 24V input.
Since batteries usually come in 12 volts voltage, the 800 VA/12 V will require a minimum of one 12V batteries, while the 1.5KVA/24V inverter will require a minimum of two 12V batteries connected in series.
In the same vein, a 3.5KVA/48V inverter will need a minimum of four 12V batteries. When you buy an inverter, make sure you know the minimum number of battery required.
What Battery Capacity
Batteries come in different capacities. The higher the capacity, the longer a battery can last before getting discharged, given similar loading.
A 200 Ah (Ampere-Hour) battery is recommended though a 100 Ah or 150 Ah battery can be managed.
For example, for our example load above (400VA), a fully charged 200 Ah battery can theoretically deliver 6 hours of power while a fully charged 100 Ah battery can only manage 3 hours.
Note that these are theoretical values, actual values may be less (as we ignored inverter efficiency and our power factor is assumed).
To increase the capacity and use time, you connect more batteries in parallel or reduce the load on the inverter.
For example, connecting two 200 Ah batteries in parallel will result in a theoretical energy capacity of 400 Ah and increase the theoretical use time to 12 hours. Note that to connect batteries in parallel you must account for the input voltage.
So, a 12V input inverter will require one 12V battery in each parallel set, a 24V input inverter will require two 12V batteries in each parallel set, a 48v input inverter will require four 12V batteries in each parallel set and so on.
Hence, a 48v input inverter will require eight 12v batteries for 2 parallel sets and twelve 12V batteries for 3 parallel sets.
Where to Buy Power Inverter
Some inverters come with solar energy support. These inverters enable you connect solar panel(s) to your inverter and tap from the free energy of the Sun. This type of inverter is called a Solar Inverter.
The Solar Panel charges your battery ensuring you have enough energy when needed. Depending on the capacity of the Solar panel, it can charge the battery, while still providing power for your appliances. Solar inverters can also charge your batteries via generators or public power supply.
Note that if you do not buy a solar inverter, you can still upgrade a regular inverter for solar energy by buying a solar charge controller.
If you buy a Solar Inverter, you will not need to buy a solar charge controller separately, since they come with solar charge controller built-in
You will have to buy the solar panels separately. If tapping energy from the sun is important to you, buy a solar inverter outright. However, you can always buy a regular power inverter and upgrade for solar energy anytime you want.
Inverter Installation
Except, you have above average electrical skills, you will need a technician to install your inverter. Thankfully, some retailers and online stores that sell inverters offer options with the installation kit, making installation easier for you or a trained technician.
The installation accessories come from the manufacturer of the inverter which ensures everything works well. When buying an inverter it is always advisable to takeup the installation kit.
The cost of the installation kit may be incorporated in the cost of the inverter or you will have to pay separately for it. Make sure you are present to inspect the installation.
Make sure that the cabling connecting the inverter to the battery is as short as possible. This will reduce energy losses.
It is also important to know that a lot of current moves (it could be double or triple digits) from the battery to the inverter, so make sure everything is properly sealed with no naked wires to prevent electrocution.
Installation cost for inverters ranges from 5,000 to 25,000 Naira depending on the complexity of the system.
Inverter Pricing & Brands
Pricing of inverters for home and office ranges from around 21,000 Naira to 700,000 Naira depending on power output and level of sophistication.
This does not include the battery. A 12V 100 Ah SMF Battery costs around 75,000 Naira, while a 12V 200 Ah SMF battery costs around 125,000 Naira. You will need from one to more than eight depending on your setup.
Want to buy an Inverter? Some popular brands in Nigeria include Sukam, Prag, Innova, Mercury, CyberPower, Luminious, Tripp Lite, Bluegate, etc.
There goes our guide on how to buy a power inverter, if you have more questions or insight :
https://brandspurng.com/how-to-buy-an-inverter-for-backup-power/ Thanks a lot for this easy to understand breakdown. I have a 1.5kva inverter which has been idle for 2 years now (2 100A batteries went weak). But I want to revive it and connect solar panels (and new batteries) to it. My questions...how do I know it is not solar enabled? (though I really think it isn't)...the solar charge controller you mentioned, is it Mppt or the other type?...can I start with one 24V 200A battery and one 250W solar panel and later upgrade to 2 each? Thanks a lot once again. |
Properties › Re: How To Buy An Inverter For Backup Power by ceelog(m): 9:27am On Jul 26, 2017*. Modified: 9:37pm On Jul 26, 2017 |
tripleY: Hate Generators
Prefer this X 100 |
|
Career › Re: Salary Structure Of Nigerian Lecturers: Annual Salary Of Nigerian Lecturers by ceelog(m): 8:14am On May 21, 2017 |
frenchwine: When you make your argument, you should do it in context. On the civil service scale, this is comparatively one of the best for career jobs. Legislation isnt a career job , hence no basis for comparison. Oil and gas, telecoms etc aren't in the civil service. If you wanna compare, you should use the salary scale of private universities like Covenant, AUN, etc in which school fees is equivalent to a lecturer II annual salary. Do you know that the lecturers' salary scale far outstrips that of the medical doctors? Bros your last statement is not true especially for medical doctors on federal salary scale. A consultant rakes like 600 to 700k a month. You guys will shout when you see the salaries and allowances of staff of NDIC and CBN (govt workers too) |
Properties › Re: Alternative Building Material (expanded Polystyrene) by ceelog(m): 6:54am On Apr 21, 2017 |
I am really struggling to understand the foam and iron set up. Seems more beams will be used. But really the important question will be that for a slab area of say 160m2 will this be more cost-effective than normal concrete slab? Teewhy2: Attached are pictures of it used in slab |
Properties › Re: Alternative Building Material (expanded Polystyrene) by ceelog(m): 9:30pm On Apr 14, 2017 |
saydfact: I've used Polystyrene material as hollow pots in slab, light weight is an advantage - interesting to see its extensive use thou as parapets too. Any pics please? |
Properties › Re: Alternative Building Material (expanded Polystyrene) by ceelog(m): 9:29pm On Apr 14, 2017 |
saydfact: I've used Polystyrene material as hollow pots in slab, light weight is an advantage - interesting to see its extensive use thou as parapets too. Please do you have any pictures of its use in slabs? Would be interesting to see! |
Properties › Re: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by ceelog(m): 8:55pm On Apr 14, 2017 |
abdulwastecx: Reinforcement work Starting materials. 1. 1.5tonnes of Y16 for beam reinforcement 2. 2 tonnes of Y12 for slab reinforcement 3. 0.5 tonnes of y8 for beams ring Binding wires Please Abdul why is the 16mm qty that high almost close to 12mm? |
Properties › Re: Construction Of Fourbedroom Duplex And Two Unit Of Two Bedroom Flat @ Isheriopic by ceelog(m): 8:18pm On Mar 23, 2017 |
Abdul (Harney Projects). Innovative. Technically Sound. Honest. I have no regrets, not even one when I chose you guys. Keep up the good work. The sky is the starting point for you guys. |
Properties › Re: Construction Process Of A 6 Flats (3 Bedrooms House) by ceelog(m): 5:20pm On Dec 22, 2016 |
God bless you richly. spyder880: Lots of tips.
1. Make sure you count your rods at the point of loading. If you fail to do so, under loading might occur with fraudulent sellers.
2. Make sure a trusted person accompany them to the site.
3. Allow the seller to bargain for the cost of loading BEFORE paying for rods. As he is keen to make a sale, he will not like the loaders to spoil his sales. Sometimes I allow them haggle for trucks too. But that must be before I pay or allow them to bring the truck.
4. Payment must be the last thing in the transaction. Get loaded first, count your materials and then pay the seller if all else is as agreed. |
Properties › Re: Construction Process Of A 6 Flats (3 Bedrooms House) by ceelog(m): 6:28pm On Dec 21, 2016 |
Greetings spyder... Any cost saving or quality assurance tip when buying rods? Is it better i.e. cheaper to tell the seller to add load/offload bill on the rods or better to handle that urself? spyder880: We have now bought the iron reinforcements for this decking and moved it to the site....... |
Properties › Re: Building 4 Flats Of 3 Bedrooms Each - Survey, Architecting And Construction by ceelog(m): 9:10am On Dec 21, 2016 |
Pls what are the dimensions as asked? Good job my brother. God is ur strenght. msogunro: Wow. How did your architect find nearly #400K in savings from his original quote?
What are the dimension's of one building? The numbers are illegible.
Looks great. Good luck. |
Properties › Re: Estate Agent Docked Over N5m Fraud In Lagos by ceelog(m): 9:38pm On Dec 14, 2016 |
I guess I am the only on on this forum that doesn't have something positive to say about Chekitaut then. Even after we spoke on the phone.... This guy... The guy does not supply to the East. He is selfish. He supplies to only those in Lagos and environs and leaves us here in the East to all forms of scam. So Mr Chekitaut, when you "finally" arrive the East with your full load, then I will understand all these praises. Chekitaut: Sir thanks, your words keep us going, "Gbenga, if you continue like this the SKY is your stepping stone"
Another Am pouring Champagne, thanks bros, I really appreciate, my regards to ur luvly wife, I apologise I kept her awake odd hour, her simple word "God bless u" am glad. Thanks |
Properties › Re: 12 Mtr DEEP& 6Mtrs DEEP PILLING BY MOORE by ceelog(m): 9:29am On Dec 11, 2016 |
segcymoor: Establishing kicker for the first floor columns Bros abeg which one be 'kicker'? Do I need it for my small duplex on normal strip and pad foundation? Great job Sir. |
Properties › Re: Construction Ofsemi-detached Twin Duplex And Restructuring Of Bungalow In Magodo by ceelog(m): 8:20am On Dec 11, 2016 |
lafolabi: 18 working days. first floor form work kick start. Glory be to GOD. Excellent and professional job. Please is there any major reason or adv of having your waste pipes exit through the dpc and not the upper foundation blocks? |
Satellite TV Technology › Re: Solar Energy, A Complement To FTA by ceelog(m): 1:38pm On Nov 23, 2016 |
DMerciful: hazelj put up his system for sale. it is a good deal and i would recommend you contact him ASAP if others have not already done that. I had considered calling him but the thing is there is no warranty on used products (if anything happens no refund) and the inverter capacity is small for future scale up. As per reading the entire pages...well make I continue sha |
Satellite TV Technology › Re: Solar Energy, A Complement To FTA by ceelog(m): 9:22am On Nov 23, 2016 |
Greetings all. I just stumbled into this thread while doing some search. Please Kiekie1, DMerciful, GeorgeD, efuro and other solar enthusiasts can you please simply breakdown what a new solar entrant needs to start his solar story till full scale up. For instance, I need to start with the following, a 210w plasma (run for 6hrs), a dstv, 2 rechargeable fans 30w each (runnin for 12hrs), 5 energy 18w bulbs (run for 5hrs), phone charging and deep freezer (during the day only). I can spare 400k and the start scaling up.
Is it feasible? Are second hand purchases adviceable? Which are preferred brands for each component even if it means buyin in bits?
Pls I tried to read all 186pages but couldnt. |
Properties › Re: Building 4 Flats Of 3 Bedrooms Each - Survey, Architecting And Construction by ceelog(m): 6:30am On Nov 22, 2016 |
|
|