Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 8:20pm On Sep 06, 2020 |
rotecch77: Actually plaster and looks more smother than sharp sand It’s also has much gum than sharp sand But in some area like Benin they used to supply sharp for all work bcs there sharp sand there looks like mixture of plaster sand and sharp sand Is there a difference in mixing sharp sand plus plaster sand and mixing stone with plaster sand. If there is no difference then to save cost, someone can use sharp sand in place of stone dust. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 7:34pm On Sep 06, 2020 |
rotecch77: Yes it will, but dressing of the windows will not be there and that your master bedroom you will exchange that for any others room size So with 20bags you are good to go.
But monitor your cement ratio with wastage ooo Brother, I don't know how much I can thank you enough for that wonderful time over the phone. Thanks so much for the explanation. It was concise and straight to the point. God bless you Sir. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 6:42pm On Sep 06, 2020 |
rotecch77: Actually the standard thickness is 25mm but you can do 20mm for internal Bro Rotecch, With what I attached and at 20mm thickness will those bags of cement still do the job? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 5:17pm On Sep 06, 2020 |
rotecch77: Actually the standard thickness is 25mm but you can do 20mm for internal This is noted. Thanks again |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 3:15pm On Sep 06, 2020 |
rotecch77: You can go this way for DIY PROJECT
Plaster sand 3trip @7k= 21,000 Sharp sand 1.5trip @14k =21,000 Cement 20bags @2500=50,000 Plank for standing =12,000 Total. N104,000 Keep rest for labour N 46,000
Ground total N150,000
Labour breakdown A room 2 skill labour @3500 or 3000=6or7k 1 unskilled labour @2000 or 2500=2k or 2.5k
Mean to plaster A room will cost you 8k or 9.5k
Finally means you can only covered 3rooms, A kitchen and 1 lobby with N46,000.
Cement for the calculated area is 20bags
This cost can only work DIY system.
The remaining part like Toilets Sittingroom Dining The remaining lobby Walk in closet area. Ante room. Can be done later Thanks so much boss. You have done well |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 3:14pm On Sep 06, 2020 |
Thanks to those who have come to my aid.
Please see attached for number of cement per segment for 15mm thickness.
I dont know if i am on point?
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 1:48pm On Sep 06, 2020 |
n3xt: You can swap 8 with 12 and probably 9 with 11.
The idea is to put the house in livable condition. If you’re able to achieve this, I believe you’ll complete the project in no time.
The external walls can be achieved with 4 trips of 5 tonnes sand (they one wey full o). You are a DARLING BROS |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 1:39pm On Sep 06, 2020 |
n3xt: You can follow this order. You’ll go far but I’m sure 30 bags won’t complete the job. Thanks Bros, I am grateful for this insight. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 1:11pm On Sep 06, 2020 |
EgunMogaji2: I've always wanted to ask this question.
Is there benefit of scale between 5 tons, 10 tons, 20 tons and 30 tons load? Well, here in Ilorin, if your are good at negotiation, small change will be removed. For Sharp Sand, maximum at a go is 10 tonnes truck which can be bought at 14k or even 13k but a single truck of 5 tonnes is sold at 8k for Granite, Quarry sell at 20k for 5 tonnes and irrespective of the tonnage, it is a fixed prices. for 5 tonnes delivery, driver will want to charge transport of 5k to sum up at 25k but if they are bringing 10tonnes at a go, then instead of 10k transport, you can reduce to 6k or 7k. the same goes for other types of sands. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 1:03pm On Sep 06, 2020 |
n3xt: This is a big house o!
Buy 6 plaster sand (30 tonnes). Buy 30 Bags of Cement Save the rest for labour
Focus on the internal walls for now. Do all the rooms first and toilets after the rooms are completed. Thanks Man. With the above, will i be able to deal all internal plastering CORRECTLY? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 12:59pm On Sep 06, 2020 |
n3xt: This is a big house o! Bros, I beg na. I have tried to take that "Big House" mentality off my head so that i am not discourage at any point. i have gone far already. I just want to know what the 150k can do so that i dont just waste it anyhow without value for it. thanks, |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 12:48pm On Sep 06, 2020 |
My People,
Please sorry for this question o. I have N150k, how far can it go on internal plastering of 4 bedroom flat.
location prices of materials Plaster sand = 7k per 5 tonnes Cement = 2500 per bag Stone Dust = 18k per 5 tonnes (Though this is availabe on ground)
|
Properties › Re: Roofing Sheets: The Cost Of Various Types Of Roofing Sheet In Nigeria by Muyi002(m): 12:33pm On Sep 06, 2020 |
money121: Classic 3,000 persqm Thanks Engr. Imran. If I require 400sqm of Steptiles (Black) plus its accessories and needs to be brought to Ilorin, how much will be the total cost and transport. Ridge Gutter Nails and other things. |
Properties › Re: Roofing Sheets: The Cost Of Various Types Of Roofing Sheet In Nigeria by Muyi002(m): 2:04pm On Sep 05, 2020 |
What is current prices of the below
Steptiles 0.55 0.50
Classic Stone Coated Roof |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 3:13pm On Aug 29, 2020 |
Please i am trying to post a comment and i am been banned. why is that? although my write up is much, |
|
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 7:47pm On Aug 23, 2020 |
rotecch77: This quotation is not too much, the only thing that looks much there is the chemical Thank you Rotecch. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 6:12pm On Aug 23, 2020 |
Well-done to our esteemed lecturers.
Please see below quotes given for my roofing
Woods 2x6 = 120pcs @ 750 = 90000 (special) 2x4 = 400pcs @ 430 = 172000 (special) 2x3 = 500pcs @ 300 = 150000 (special) 2x3 = 100pcs @ 240 = 24000 (Solo) logging 4" Nail = 3 bags @7000 = 21000 3" Nail = 1 bag @ 7000 = 7000 2½" Nail = 1½ Bags @ 7000 = 10500 Chemicals = 25000 Total = 511,000
See floor plan in the attached. I am looking at a kingpost height of either 6 or 7 meters and a possible sqm roof of maximum if 400 sqm
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 6:39am On Aug 09, 2020 |
michlins: Good morning everyone and happy new month. Just remember that we're still in the business of taking orders in beautifully securing your homes.
From all of us here, stay focused for a result oriented month. It's not too late to make something out of this month The first photo is how much? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 7:39am On Jul 25, 2020 |
Person2person: solid flush internal door and polished panel patterned skin door. Please how much is the dark brown in the market. Does it also comes with frame? If yes how much |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 10:16pm On Jul 12, 2020 |
Dear Roofers,
Why technique is used in calculations of roof sqm? It's the normal mathematical trigonometry? |
Properties › Re: Please Help (Cost to Construct Concrete Parapet) by Muyi002(m): 3:02pm On Jul 04, 2020 |
SkKasim: Good everyone
I have a 3bedroom of 40 meters Am considering concrete parapet Cox I heard it's durable. Pls like how much would a concrete parapet of 40 meters cost? Materials inclusive.. Thank u Hi, Mine was 66 Metres and it cost me the below Parapet and soak away CastingIron12mm - 30 lengths @ 1970 = 59100 8mm - 51 lengths @ 1420 = 72420 Big Binding wire @ 7000 Extra iron = 9000 Quarter rod - 15 lengths @ 200 = 3000 Transport = 3500 Workmanship = 25000 Wood and cutting = 175000 Nail = 11100 Transport = 4000 Workmanship = 40000 Granite = 20 tonnes = 100000 Sharp sand = 15 tonnes = 21000 Cement 50 bags @ = 130000 Labour = 50000 Total = 710,000 Taking a look at the cost of Pre-cast Parapet and Aluminium Parapet, i consider this the best (my opinion) and I dont regret. see thread here - https://www.nairaland.com/2550211/general-topic-thread-to-discuss-anything/1334#87074414 |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 10:02pm On Jun 25, 2020 |
Muyi002: Hi Guys, Please send give advice on what could be the cause if this cracks on the wall in the attached. Anyone with a point here |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 7:28am On Jun 23, 2020 |
Hi Guys, Please send give advice on what could be the cause if this cracks on the wall in the attached.
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 7:11am On Jun 23, 2020 |
smallsmall: What kind of MANAGE will take a plastering job from 2-3Bags, to 8Bags or you dont know what you are saying sef? How can 2-3 Bags plaster four walls of a House of of 4m x 3.5m or are you sleeping when you type that answer? You better stick to the drawing that you know and stop sayng nonsense.
And you call yourself a Professional? Those people that give you building jobs better go back and check before the thing collapse one day.  Please share your opinion on this for us to learn. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 5:33pm On Jun 21, 2020 |
Johntemmy: Get your cheap strong hardwood for all your project at cheaper rate. 2by2by12 2by3by12 2by4by12 2by6by12 3by4by12 1by12
you can also call me from foundation level for your white woods such as 1by12,2by3 etc..we give you strong and everlasting wood for your project..call or Whatsapp me on 07060795767 we supply all over Nigeria. Do you sell for Ilorin axis. Please let's have your prices for these classes of woods. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 10:46pm On Jun 20, 2020 |
mufutau55: If the King Post pass 16ft, that roof is not for me. The thing don become Fulani nomad hut be that o. Nah simplicity for me.
Hajji M. Hajji, What is wrong with passing 16ft? because I am considering either 18 or 20 o. E joor enlighten me. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 9:43pm On Jun 16, 2020 |
topsy23: 1.5mm single core for lighting Red colour is Live Black Colour is Neutral Green is for the earth cable.(Most of light fittings don't normally come with earth terminal, reason for neglecting earth cable for the lighting circuit).
2.5mm single core cable is for the socket outlet(both single and double). At times it can also be use for water heater if the litres is not more than 20litres. Red colour is Live Black Colour is Neutral Green is for the earth cable Note: Earth cable is very important in the installation of socket, AC, Water heater, cooker unit etc......
-It keeps people safe by preventing electric shocks -It prevents damage to electrical appliances and devices by preventing excessive current from running through the circuit -It prevents the risk of fire that could otherwise be caused by current leakage -Earth can also serves as neutral if the Neutral fail Thank you very much for this breakdown |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 9:31pm On Jun 15, 2020 |
topsy23: the analysis above shows that 1.5mm green is going to be use as earth cable for the 2.5mm. you can see that the number of red and black of 2.5mm is the same with 1.5mm. Same as 4mm and 2.5mm green Oga Topsy23, I don't understand your talk |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 5:23pm On Jun 15, 2020 |
Please what are these wires for in electrical works 1.5mm Red 4 Black 3 Green 3
2.5mm Red 3 Black 3 Green 1
4mm Red 1 Black 1
16mm 1 |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 8:27pm On Jun 09, 2020 |
Chekitaut: Type of wood? Ayin is what it is called |