Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 1:37pm On Oct 04, 2020 |
rotecch77: Thanks boss. It is actually casement aluminum window. |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 6:08pm On Oct 03, 2020 |
My Good People, Please I need your advice o. I don't know which is important and next to deal. I have 430k which will not cater for either of aluminum windows or plastering. Kindly advice me on what to do next.
|
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 8:12pm On Oct 01, 2020 |
sam1919: This is dependent on the depth of the foundation, wideness of the rooms and cost of the tonnes of filling sand |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 12:10pm On Sep 23, 2020 |
jabolo: Haba Brother, That is the beauty of this forum. I will not take any offence against you. It is very possible that I may be wrong and vice versa. It is good opinions are shared for all to learn. You have done well. Bravo!!! 11 Likes 2 Shares |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 11:47am On Sep 23, 2020 |
jabolo: Bros, that is my building. As a matter of fact, this your opinion is the first I am getting. Other opinions have been commendable. I actually wanted the roof to be 6 meters high. maybe because of the way it was snapped. No worry by the time they finish, you will like it. Thanks though for the feedback. 6 Likes |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 11:45am On Sep 23, 2020 |
money121: Thanks to the Integrity Roofing Company. He has done perfectly well. I will recommend you to anybody, anytime and any day. Keep doing the good work. Good work speaks for itself on behalf of the doer. I don't regret doing business with you. Imran Roofing--- Thanks a bunch. 5 Likes 1 Share |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 7:52am On Sep 22, 2020 |
Rotech77Ditto: Are these doors locally made or imported? 1 Like |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 10:52pm On Sep 16, 2020 |
Please Ibadan people, how much is cement sold at now |
Crime / Re: Yusuf Toyib Kidnapped: This Medical Doctor Is Missing! Please Have You Seen Him? by Muyi002(m): 4:38pm On Sep 15, 2020 |
Thank you to everyone for your prayers. He has been released and he is with his family. May we and/or our families not be a victim of kidnapping. |
Properties / Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by Muyi002(m): 2:51pm On Sep 14, 2020 |
topsy23: Thank you more. |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 7:09am On Sep 14, 2020 |
oduncojamaica: The thickness if the half dpc is 4inches. Yes it is advisable to add DPM to it for a good result. |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 8:46pm On Sep 13, 2020 |
1 Like
|
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 8:38pm On Sep 13, 2020 |
RipVanWink: In my opinion, why not go for suspended ceiling. Installation and materials is @ 2100 per sqm. It is better to either of your two choices. |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 3:41pm On Sep 13, 2020 |
EgunMogaji2: Buying aluminiun 0.7mm thickness the same as buying a stone coated roof of N3200/sqm No wonder is mostly used by big factories. 1 Like |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 3:25pm On Sep 13, 2020 |
EgunMogaji2: The information i have on 0.7mm is that it can only go on long span due to its thickness. 1 Like |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 2:37pm On Sep 13, 2020 |
EgunMogaji2: EgunMogaji, You have spoken well. I will take this to heart. Will stick to the 0.55mm thickness. I am grateful for the advice. 2 Likes |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 1:39pm On Sep 13, 2020 |
EgunMogaji2: Bros, please could you explain better. I beg 1 Like |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 1:36pm On Sep 13, 2020 |
dongc: My brother your words and advice are golden. I just want the best of the aluminium roofing sheet since I am unable to afford stonecoated again. Thank you for your observation and input. It is golden once again. 3 Likes |
Properties / Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by Muyi002(m): 1:09pm On Sep 13, 2020 |
topsy23: Please I am not intending to do inverter or Solar. Water heater - 2 Proposed A/C is 1 You can put the addition wires for inverter separately. You never can tell what the future holds. |
Properties / Re: Contact Us For Your Electrical/mechanical(Plumbing) Design And Installation by Muyi002(m): 10:07am On Sep 13, 2020 |
Oga Topsy23, Well done. Please I need your enlightenment on the requirements as it relates to wire cables for a 4 bedroom apartment and the kind of DB to use. Please assist with the requirement. My plan is attached. I dont mind if you can add the current prices of the wires
|
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 9:55am On Sep 13, 2020 |
EgunMogaji2: Boss Mi, Please where are the sources of these doors you shared? |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 10:53pm On Sep 12, 2020 |
amosblisz: Yes. My location is Ilorin. Transport is being negotiated and hoping to get it @ 50k |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 10:23pm On Sep 12, 2020 |
amosblisz: Yeah, it's ensuite. A contractor on nairaland has proposed 2200 per sqm for 0.55. However I am seeing another person who will purchase from Lagos at 2000. What I have is a total of 400sqm I am doing my findings carefully. Below are my calculations Aluminium -Step tiles from Lagos General 0.55mm = 400sqm @ 2200/ 2000= 880000/800000 Ridge Cap = 70 metres @ 800 = 48000 Gutter Valley = 10 metres @ 800 = 8000 Parafet = 6 metres @ 800 = 4800 Nails and other accessories = 25000 White 11/32 = 3 lengths @ 1000 = 3000 Transport = 50000 1 Like |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 9:43pm On Sep 12, 2020 |
amosblisz: Mine is a 4 bedroom flat and I bought this � Steptiles aluminum Roofing Woods 2x6 = 145pcs @ 750 = 1108750 (special) 2x4 = 400pcs @ 450 = 180000 (special) 2x3 = 500pcs @ 350 = 175000 (special) 2x3 = 200pcs @ 240 = 48000 (Solo) logging 4" Nail = 3 bags @8000 = 26000 3" Nail = 1 bag @ 8000 = 8000 2½" Nail = 1½ Bags @ 9000 = 9000 Chemicals = 14000 transport = 20000 Total = 590000 Workmanship = 125000 Total = 715,000 4 Likes
|
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 9:32pm On Sep 12, 2020 |
EgunMogaji2: What I did was half dpc with DPM put round the tip blocks. See attached for why I meant as half DPC. It was later I floored the building. The cost is also captured. 1 Like
|
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 9:02pm On Sep 12, 2020 |
EgunMogaji2: Affirmative Sir!!! Although I later paid 56k for block work after lintel to help the condition of the mason because I know the job is much |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 8:37pm On Sep 12, 2020 |
Footstradamus: I have tried to type the whole cost to the wood work point but I was blocked for 24 hours. This is happening for a 3rd time. Maybe it is because the list is too long. I have attached a photo of the cost for your perusal. Also my wood work is attached. 1 Like
|
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 3:42pm On Sep 11, 2020 |
Footstradamus: Hi, This is my drawing which I have taken to the Roofing Level (Wood work on going) by the Grace of God. It is built on 1 and half plot of land. The Kitchen only has 4 doors 1. Dining 2. Lobby 3. Store 4. Outside. The door behind the store has been removed and blocked I have factored in all these for the cabinets to stay put in the kitchen. As per door to the lobby straight, a modification has been done such that the door to the visitor room has been moved to the ante-room so that a distant visitor will not have access beyond the dinning. I will share the cost to the level i am currently in. Please note that some of the cost are location specific. |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 8:39pm On Sep 06, 2020 |
multikolour: Please note that this price is Ilorin based. I don't know how they charge in your own location. Please factor that into your calculations. |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 8:33pm On Sep 06, 2020 |
Muyi002: For the cement and sands, I took my time to calculate this: Room Dimensions Internal Plastering = 70 bags Mixing ratio = 1:6 1 bag of cement and 12 head pans 1.Internal Lobby 10.7 ➕ 2.2 ✖ 2 = 25.8 = 7 bags =14 dust & 70 plaster 2.Other toilet(2) = 2 ➕ 1.7 ✖ 4 = 14.8 = 4 bags = 8 dust & 40 plaster 3.Room lobby = 3.6 ➕ 1.2 = 4.9 = 2 bags = 4 dust & 20 plaster 4.External lobbies (2) = 1.2 ➕ 3.0 ✖ 2 = 8.4 = 3 bags = 6 dust & 30 plaster 5.V/T = 6 ➕ 1= 7 = 2 bags = 4 dust & 20 plaster 6.Ante 6 ➕ 4 = 10 = 3 bags = 6 dust & 30 plaster 7. Parlor 5.0 ➕ 5.4 ✖ 2 = 20.8 = 6 bags = 12 dust & 60 plaster 8.Dining 3 ➕ 3.5 ✖ 2 =13 = 4 bags = 8 dust & 40 plaster 9.Kitchen 3 ➕ 4 ✖ 2 =14 = 4 bags = 8 dust & 40 plaster 10.V-Room 3.8 ➕ 3.5 ✖ 2 =14.6 = 4 bags = 8 dust & 40 plaster 11. Other room(2) 3.4 ➕ 3.6 ✖ 4 = 28 = 8 bags = 16 dust & 80 plaster 12. GT 1.2x2.4 closet 1.2x1.2≠5 = 1.2 ➕ 3.6 ✖ 2 = 9.6 = 3 bags = 6 dust & 30 plaster 13.Master closet = 1.8 ➕ 2.1= 4 = 1 bag = 2 dust & 10 plaster 14.Master room = 3.9 ➕ 5.8 ✖ 2 = 20 = 6 bags = 12 dust & 60 plaster 15.Master toilet = 3 ➕ 2.1 ✖ 2 =10.2 = 3 bags = 6 dust & 30 plaster 16.Laundry = 8 ➕ 1.6= 9.6 = 3 bags = 6 dust & 30 plaster 17.Store = 8 ➕ 1.5= 9.5 = 3 bags = 6 dust & 30 plaster 18. Main veranda = 3 = 1 bag = 2 dust & 10 plaster External Plastering = 35 bags Mixing ratio = 1:4 Back of building = 11.6 = 7 bags = 14 dust & 42 plaster Kitchen side = 19.6 = 10 bags = 20 dust & 60 plaster Master room side = 22.2 = 11 bags = 22 dust & 66 plaster Front of building = 5.5 = 3 bags = 6 dust & 18 plaster 8 Likes 2 Shares |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 8:26pm On Sep 06, 2020 |
For my building, the fellow handling my stuff said I will need 200 bags and 480k workmanship. For Ilorin fa!!! I now decided this method below for labour cost. Plastering Pattern Internal Platering Day 1 = 2 rooms & toilets Bricklayers = 5 Labourers = 2 Day 2 = internal lobbies Bricklayers = 5 Labourers = 2 Day 3 = Master Bedroom & Toilets Bricklayers = 4 Labourer = 2 Day 4 = Landry, Store & Kitchen Bricklayers = 4 Labourers = 2 Day 5 = Guest Room, toilet, ante room & toilet Bricklayers = 4 Labourers = 1 Day 6 = Palour & Dining Bricklayers = 5 Labourers = 2 Total Cost = 85,000 Bricklayers = 27 @ 2500 = 67,500 Labourers = 11 @ 1500 = 17,500 External Plastering Day 1 = Left Side Bricklayers = 6 Labourers = 2 Day 2 = Right Side Bricklayers = 6 Labourers = 2 Day 3 = Front and Back Bricklayers = 4 Labourers = 2 Total Cost = 50,000 Bricklayers = 16 @ 2500 = 40,000 Labourers = 6 @ 1500 = 9,000 5 Likes 1 Share |
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (of 10 pages)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 55 |