IFEBARBIE:Thanks. But my challenge is that roof money is not available yet and may take some time to gather for roof. What I have now (money and materials) can only cater for flooring. Also I have done the plumbing work inside the ground. |
Hello Good People, Please advice me o. I have taken my building to parapet level., can I do the flooring or wait for money tonne complete to first do the roof and then floor. |
GoodFaith: |
idrisfuta:This is around ajegunle/bayii Egbejila side. For the advice of situating a 4 bedroom around Kwara poly area, the choice is up to you based on your taste and preferences. |
Alams85:4 bed room |
This what I have spent to this stage. Labour Cost for Foundation Excavation, Blinding and Block setting to Lintel = 180000 Blinding Cement - 30 bags @ 2500 = 75,000 Sharp Sand - 20 tonnes = 32,000 Granite - 25 tonnes = 105,000 Total = 212,000 Foundation Block Setting & Sock away Pit Blocks = 1400 @ 150 = 210,000 Cement - 30 bags @ 2400 = 72,000 Sharp Sand =15 tonnes = 24,000 Labour for Soak away = 62,000 Extra Labour Expenses = 20,000 Total = 388,000 Foundation Filling Labour = 92,000 Laterite = 326,000 Total = 418000 DPC - Half DPM Nylon = 11,500 Granite= 10 tonnes = 45,000 Tara = 10 tonnes =13,000 Sharp sand = 10 tonnes = 15,500 Planks - 25 pieces & nails = 25000 Iron 16mm - 4 lengths @4400 = 17600 8mm - 3 lengths @ 1250 = 3750 Binding wire =2500 Transport = 2500 Workmanship Labourer = 40000 Welder and carpenter = 13000 Cement = 28 bags @ 2500= 70000 Wire Mesh = 10500 Total = 273,000 Above Foundation Block setting + 2 soak away pits Blocks 4100 @ 150 = 615000 Water = 3000 Sharp sand = 36000 Joining sand = 18000 Cement @2500 =162500 labour = 56000 Total = 891000 Lintel and Pillars Casting 16mm - 8 lengths @ 3630 = 29040 8mm - 31 lengths @ 1030 = 31930 12mm - 34 lengths @ 2050 = 69700 1 binding wire = 4000 Transport & logistics = 4000 Wood and planks ➕ TP = 51000 Granite = Used remains Sharp sand = 15000 Cement = 30 bags @ 2500 = 75000 Workmanship Labour 40000 Carpenter 22000 Iron bender 17000 Total =360000 Parapet and soak away Casting Iron plus 12mm - 30 lengths @ 1970 = 59100 8mm - 51 lengths @ 1420 = 72420 Big Binding wire @ 7000 Extra iron = 9000 Quarter rod - 15 lengths @ 200 = 3000 Transport = 3500 Workmanship = 25000 Wood and cutting = 175000 Nail = 11100 Transport = 4000 Workmanship = 40000 Granite = 20 tonnes = 100000 Sharp sand = 15 tonnes = 21000 Cement 50 bags @ = 130000 Labour = 50000 Total = 710,000 Electrical 20mm pipe = 2 bundles @2100 25mm pipe = 1 bundle @ 3200 Electrical materials = 14000 Workmanship =9000 Plumbing Internal plumbing Cost of pipes and accessories = 47,000 Labour = 18,000
|
yinkaoke:I guess this quote is for the overall plumbing works. Fair enough. However, i will advise you purchase these items yourself to avoid rip off in prices and actual materials. You may at the point of purchase talk to the seller on what you need them for for proper advice. All the best and God's guidance |
twinskenny:For my electrical piping, though roof pipes and materials not included. See attached
|
yinkaoke:This was what I used for my 4 bedroom flat. All are internal plumbing works. The materials were purchased by me so the process are genuine. Location is ilorin
|
multikolour:See attached.
|
ChiefSupplier55:What about the inter room doors |
ChiefSupplier55:The last door is likely to go for how much |
Good People of the House Thank you for your.support and advise. This is what I have incurred so far to parapet level and internal plumbing. Still have a long way to go Labour Cost for Foundation Excavation, Blinding and Block setting to Lintel = 180000 Blinding Cement - 30 bags @ 2500 = 75,000 Sharp Sand - 20 tonnes = 32,000 Granite - 25 tonnes = 105,000 Total = 212,000 Foundation Block Setting & Sock away Pit Blocks = 1400 @ 150 = 210,000 Cement - 30 bags @ 2400 = 72,000 Sharp Sand =15 tonnes = 24,000 Labour for Soak away = 62,000 Extra Labour Expenses = 20,000 Total = 388,000 Foundation Filling Labour = 92,000 Laterite = 326,000 Total = 418000 DPC - Half DPM Nylon = 11,500 Granite= 10 tonnes = 45,000 Tara = 10 tonnes =13,000 Sharp sand = 10 tonnes = 15,500 Planks - 25 pieces & nails = 25000 Iron 16mm - 4 lengths @4400 = 17600 8mm - 3 lengths @ 1250 = 3750 Binding wire =2500 Transport = 2500 Workmanship Labourer = 40000 Welder and carpenter = 13000 Cement = 28 bags @ 2500= 70000 Wire Mesh = 10500 Total = 273,000 Above Foundation Block setting + 2 soak away pits Blocks 4100 @ 150 = 615000 Water = 3000 Sharp sand = 36000 Joining sand = 18000 Cement @2500 =162500 labour = 56000 Total = 891000 Lintel and Pillars Casting 16mm - 8 lengths @ 3630 = 29040 8mm - 31 lengths @ 1030 = 31930 12mm - 34 lengths @ 2050 = 69700 1 binding wire = 4000 Transport & logistics = 4000 Wood and planks ➕ TP = 51000 Granite = Used remains Sharp sand = 15000 Cement = 30 bags @ 2500 = 75000 Workmanship Labour 40000 Carpenter 22000 Iron bender 17000 Total =360000 Parapet and soak away Casting Iron plus 12mm - 30 lengths @ 1970 = 59100 8mm - 51 lengths @ 1420 = 72420 Big Binding wire @ 7000 Extra iron = 9000 Quarter rod - 15 lengths @ 200 = 3000 Transport = 3500 Workmanship = 25000 Wood and cutting = 175000 Nail = 11100 Transport = 4000 Workmanship = 40000 Granite = 20 tonnes = 100000 Sharp sand = 15 tonnes = 21000 Cement 50 bags @ = 130000 Labour = 50000 Total = 710,000 Electrical 20mm pipe = 2 bundles @2100 25mm pipe = 1 bundle @ 3200 Electrical materials = 14000 Workmanship =9000 Plumbing Internal plumbing Cost of pipes and accessories = 47,000 Labour = 18,000 |
What is the thickness of correct stone coated roof Cc: money121 |
saydfact:Thanks baba. Na you biko |
Chekitaut:Please ignore3 |
Please what importance does wire mesh have on flooring. Cc:,saydfact |
It seems you guys dont want us to learn anything on this group again. We have heard he defraud people, must you continue to say it 100 times. We know it is at the risk of the dealer to deal with him. We don hear. Please allow those of us who want to learn learn o. Abeg!!!! |
KIDfurniture:If you check my cost of building up to parapet, you will my cost |
Adeoba10:Rather than deal on per day fee, why not ask how much will be taken to do the job |
My good people, Please what is the importance of wire mesh in flooring purpose. |
Good Morning People, Please I am.currently at the point of flooring my building. My bricklayer has advised me to use gravel and cement for this purpose during to my pocket. I hope this can work if properly mixed. I would have love to use granite but my pocket is lean. Your advice please |
yinkaoke:Those are practically all that is required. You may wish to add DPC membrane (thick nylon) depending on the kind of soil/land that you have plus wire mesh to further it. Good luck |
Chekitaut:Yeah, concrete was put in the external block holes that runs to the bottom before the a thick nylon and concrete was cast with wire mesh. |
Chekitaut:This was what I did before put blocks above the foundation
|
The detailed cost if the project was an idea I got from Segzy post on nairaland. That is Lagos way of ripping off the land owners. My site is located in ilorin. God bless khadii1: |
The detailed cost if the project was an idea I got from Segzy post on nairaland. That is Lagos way of ripping off the land owners. My site is located in ilorin. khadii1: |
This is my cost below from ground to parapet level. I actually didn't do German Floor after foundation. I am looking to do that now Labour Cost for Foundation Excavation, Blinding and Block setting to Lintel = 180000 Blinding Cement - 30 bags @ 2500 = 75,000 Sharp Sand - 20 tonnes = 32,000 Granite - 25 tonnes = 105,000 Total = 212,000 Foundation Block Setting & Sock away Pit Blocks = 1400 @ 150 = 210,000 Cement - 30 bags @ 2400 = 72,000 Sharp Sand =15 tonnes = 24,000 Labour for Soak away = 62,000 Extra Labour Expenses = 20,000 Total = 388,000 Foundation Filling Labour = 92,000 Laterite = 326,000 Total = 418000 DPC - Half DPM Nylon = 11,500 Granite= 10 tonnes = 45,000 Tara = 10 tonnes =13,000 Sharp sand = 10 tonnes = 15,500 Planks - 25 pieces & nails = 25000 Iron 16mm - 4 lengths @4400 = 17600 8mm - 3 lengths @ 1250 = 3750 Binding wire =2500 Transport = 2500 Workmanship Labourer = 40000 Welder and carpenter = 13000 Cement = 28 bags @ 2500= 70000 Wire Mesh = 10500 Total = 273,000 Above Foundation Block setting + 2 soak away pits Blocks 4100 @ 150 = 615000 Water = 3000 Sharp sand = 36000 Joining sand = 18000 Cement @2500 =162500 labour = 56000 Total = 891000 Lintel and Pillars Casting 16mm - 8 lengths @ 3630 = 29040 8mm - 31 lengths @ 1030 = 31930 12mm - 34 lengths @ 2050 = 69700 1 binding wire = 4000 Transport & logistics = 4000 Wood and planks ➕ TP = 51000 Granite = Used remains Sharp sand = 15000 Cement = 30 bags @ 2500 = 75000 Workmanship Labour 40000 Carpenter 22000 Iron bender 17000 Total =360000 Parapet and soak away Casting Iron plus 12mm - 30 lengths @ 1970 = 59100 8mm - 51 lengths @ 1420 = 72420 Big Binding wire @ 7000 Extra iron = 9000 Quarter rod - 15 lengths @ 200 = 3000 Transport = 3500 Workmanship = 25000 Wood and cutting = 175000 Nail = 11100 Transport = 4000 Workmanship = 40000 Granite = 20 tonnes = 100000 Sharp sand = 15 tonnes = 21000 Cement 50 bags @ = 130000 Labour = 50000 Total = 710,000 Electrical (wall pipe installations) 20mm pipe = 2 bundles @2100 25mm pipe = 1 bundle @ 3200 Electrical materials = 14000 Workmanship =9000 Total = approximately 3.5M
|
topsy23:Brother, please can you assist with quotation for a 4 bedroom wiring |
Teewhy2:Please are these pop or polystering. How much per sqm |
ak22:Thanks man. But I am not a fan of precast. More so, I have compared the price and it's close to what I have. |
Hi Guys, Thanks for always. Please the below is what I have as quote for parapet Estimated expenses Cement = 60 bags - 150 Iron ➕ workmanship = 160k Wood ➕ workmanship = 200k Granite 15 tonnes = 75k Sharp Sand 15 tonnes = 21k Labour = 50k Totalling = 656k I guess it's good.
|