Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 6:34am On Mar 14, 2020 |
IFEBARBIE: Thanks. But my challenge is that roof money is not available yet and may take some time to gather for roof. What I have now (money and materials) can only cater for flooring. Also I have done the plumbing work inside the ground. |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 9:27pm On Mar 13, 2020 |
Hello Good People, Please advice me o. I have taken my building to parapet level., can I do the flooring or wait for money tonne complete to first do the roof and then floor. |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 9:39pm On Mar 05, 2020 |
GoodFaith: |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 9:36pm On Mar 05, 2020 |
idrisfuta: This is around ajegunle/bayii Egbejila side. For the advice of situating a 4 bedroom around Kwara poly area, the choice is up to you based on your taste and preferences. 1 Like |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 3:38pm On Mar 01, 2020 |
Alams85: 4 bed room |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 10:18am On Mar 01, 2020 |
This what I have spent to this stage. Labour Cost for Foundation Excavation, Blinding and Block setting to Lintel = 180000 Blinding Cement - 30 bags @ 2500 = 75,000 Sharp Sand - 20 tonnes = 32,000 Granite - 25 tonnes = 105,000 Total = 212,000 Foundation Block Setting & Sock away Pit Blocks = 1400 @ 150 = 210,000 Cement - 30 bags @ 2400 = 72,000 Sharp Sand =15 tonnes = 24,000 Labour for Soak away = 62,000 Extra Labour Expenses = 20,000 Total = 388,000 Foundation Filling Labour = 92,000 Laterite = 326,000 Total = 418000 DPC - Half DPM Nylon = 11,500 Granite= 10 tonnes = 45,000 Tara = 10 tonnes =13,000 Sharp sand = 10 tonnes = 15,500 Planks - 25 pieces & nails = 25000 Iron 16mm - 4 lengths @4400 = 17600 8mm - 3 lengths @ 1250 = 3750 Binding wire =2500 Transport = 2500 Workmanship Labourer = 40000 Welder and carpenter = 13000 Cement = 28 bags @ 2500= 70000 Wire Mesh = 10500 Total = 273,000 Above Foundation Block setting + 2 soak away pits Blocks 4100 @ 150 = 615000 Water = 3000 Sharp sand = 36000 Joining sand = 18000 Cement @2500 =162500 labour = 56000 Total = 891000 Lintel and Pillars Casting 16mm - 8 lengths @ 3630 = 29040 8mm - 31 lengths @ 1030 = 31930 12mm - 34 lengths @ 2050 = 69700 1 binding wire = 4000 Transport & logistics = 4000 Wood and planks ➕ TP = 51000 Granite = Used remains Sharp sand = 15000 Cement = 30 bags @ 2500 = 75000 Workmanship Labour 40000 Carpenter 22000 Iron bender 17000 Total =360000 Parapet and soak away Casting Iron plus 12mm - 30 lengths @ 1970 = 59100 8mm - 51 lengths @ 1420 = 72420 Big Binding wire @ 7000 Extra iron = 9000 Quarter rod - 15 lengths @ 200 = 3000 Transport = 3500 Workmanship = 25000 Wood and cutting = 175000 Nail = 11100 Transport = 4000 Workmanship = 40000 Granite = 20 tonnes = 100000 Sharp sand = 15 tonnes = 21000 Cement 50 bags @ = 130000 Labour = 50000 Total = 710,000 Electrical 20mm pipe = 2 bundles @2100 25mm pipe = 1 bundle @ 3200 Electrical materials = 14000 Workmanship =9000 Plumbing Internal plumbing Cost of pipes and accessories = 47,000 Labour = 18,000 7 Likes 1 Share
|
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 7:55am On Feb 26, 2020 |
yinkaoke: I guess this quote is for the overall plumbing works. Fair enough. However, i will advise you purchase these items yourself to avoid rip off in prices and actual materials. You may at the point of purchase talk to the seller on what you need them for for proper advice. All the best and God's guidance 1 Like |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 9:39pm On Feb 24, 2020 |
twinskenny: For my electrical piping, though roof pipes and materials not included. See attached
|
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 9:34pm On Feb 24, 2020 |
yinkaoke: This was what I used for my 4 bedroom flat. All are internal plumbing works. The materials were purchased by me so the process are genuine. Location is ilorin
|
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 7:27am On Feb 24, 2020 |
multikolour: See attached. 2 Likes
|
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 9:05pm On Feb 20, 2020 |
ChiefSupplier55: What about the inter room doors |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 8:37pm On Feb 20, 2020 |
ChiefSupplier55: The last door is likely to go for how much |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 8:36pm On Feb 20, 2020 |
Good People of the House Thank you for your.support and advise. This is what I have incurred so far to parapet level and internal plumbing. Still have a long way to go Labour Cost for Foundation Excavation, Blinding and Block setting to Lintel = 180000 Blinding Cement - 30 bags @ 2500 = 75,000 Sharp Sand - 20 tonnes = 32,000 Granite - 25 tonnes = 105,000 Total = 212,000 Foundation Block Setting & Sock away Pit Blocks = 1400 @ 150 = 210,000 Cement - 30 bags @ 2400 = 72,000 Sharp Sand =15 tonnes = 24,000 Labour for Soak away = 62,000 Extra Labour Expenses = 20,000 Total = 388,000 Foundation Filling Labour = 92,000 Laterite = 326,000 Total = 418000 DPC - Half DPM Nylon = 11,500 Granite= 10 tonnes = 45,000 Tara = 10 tonnes =13,000 Sharp sand = 10 tonnes = 15,500 Planks - 25 pieces & nails = 25000 Iron 16mm - 4 lengths @4400 = 17600 8mm - 3 lengths @ 1250 = 3750 Binding wire =2500 Transport = 2500 Workmanship Labourer = 40000 Welder and carpenter = 13000 Cement = 28 bags @ 2500= 70000 Wire Mesh = 10500 Total = 273,000 Above Foundation Block setting + 2 soak away pits Blocks 4100 @ 150 = 615000 Water = 3000 Sharp sand = 36000 Joining sand = 18000 Cement @2500 =162500 labour = 56000 Total = 891000 Lintel and Pillars Casting 16mm - 8 lengths @ 3630 = 29040 8mm - 31 lengths @ 1030 = 31930 12mm - 34 lengths @ 2050 = 69700 1 binding wire = 4000 Transport & logistics = 4000 Wood and planks ➕ TP = 51000 Granite = Used remains Sharp sand = 15000 Cement = 30 bags @ 2500 = 75000 Workmanship Labour 40000 Carpenter 22000 Iron bender 17000 Total =360000 Parapet and soak away Casting Iron plus 12mm - 30 lengths @ 1970 = 59100 8mm - 51 lengths @ 1420 = 72420 Big Binding wire @ 7000 Extra iron = 9000 Quarter rod - 15 lengths @ 200 = 3000 Transport = 3500 Workmanship = 25000 Wood and cutting = 175000 Nail = 11100 Transport = 4000 Workmanship = 40000 Granite = 20 tonnes = 100000 Sharp sand = 15 tonnes = 21000 Cement 50 bags @ = 130000 Labour = 50000 Total = 710,000 Electrical 20mm pipe = 2 bundles @2100 25mm pipe = 1 bundle @ 3200 Electrical materials = 14000 Workmanship =9000 Plumbing Internal plumbing Cost of pipes and accessories = 47,000 Labour = 18,000 4 Likes |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 10:34pm On Feb 18, 2020 |
What is the thickness of correct stone coated roof Cc: money121 |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 11:09am On Feb 15, 2020 |
saydfact: Thanks baba. Na you biko 1 Like |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 10:16pm On Feb 11, 2020 |
Chekitaut: Please ignore3 |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 8:49pm On Feb 11, 2020 |
Please what importance does wire mesh have on flooring. Cc:,saydfact |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 8:40pm On Feb 11, 2020 |
It seems you guys dont want us to learn anything on this group again. We have heard he defraud people, must you continue to say it 100 times. We know it is at the risk of the dealer to deal with him. We don hear. Please allow those of us who want to learn learn o. Abeg!!!! 3 Likes |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 11:23pm On Feb 09, 2020 |
KIDfurniture:If you check my cost of building up to parapet, you will my cost |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 8:32pm On Feb 09, 2020 |
Adeoba10:Rather than deal on per day fee, why not ask how much will be taken to do the job 1 Like |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 5:43pm On Feb 09, 2020 |
My good people, Please what is the importance of wire mesh in flooring purpose. |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 5:15am On Feb 07, 2020 |
Good Morning People, Please I am.currently at the point of flooring my building. My bricklayer has advised me to use gravel and cement for this purpose during to my pocket. I hope this can work if properly mixed. I would have love to use granite but my pocket is lean. Your advice please |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 7:01am On Feb 01, 2020 |
yinkaoke: Those are practically all that is required. You may wish to add DPC membrane (thick nylon) depending on the kind of soil/land that you have plus wire mesh to further it. Good luck |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 10:18pm On Jan 31, 2020 |
Chekitaut: Yeah, concrete was put in the external block holes that runs to the bottom before the a thick nylon and concrete was cast with wire mesh. |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 9:58pm On Jan 31, 2020 |
Chekitaut: This was what I did before put blocks above the foundation
|
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 9:55pm On Jan 31, 2020 |
The detailed cost if the project was an idea I got from Segzy post on nairaland. That is Lagos way of ripping off the land owners. My site is located in ilorin. God bless khadii1: |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 9:53pm On Jan 31, 2020 |
The detailed cost if the project was an idea I got from Segzy post on nairaland. That is Lagos way of ripping off the land owners. My site is located in ilorin. khadii1: |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 10:57pm On Jan 30, 2020 |
This is my cost below from ground to parapet level. I actually didn't do German Floor after foundation. I am looking to do that now Labour Cost for Foundation Excavation, Blinding and Block setting to Lintel = 180000 Blinding Cement - 30 bags @ 2500 = 75,000 Sharp Sand - 20 tonnes = 32,000 Granite - 25 tonnes = 105,000 Total = 212,000 Foundation Block Setting & Sock away Pit Blocks = 1400 @ 150 = 210,000 Cement - 30 bags @ 2400 = 72,000 Sharp Sand =15 tonnes = 24,000 Labour for Soak away = 62,000 Extra Labour Expenses = 20,000 Total = 388,000 Foundation Filling Labour = 92,000 Laterite = 326,000 Total = 418000 DPC - Half DPM Nylon = 11,500 Granite= 10 tonnes = 45,000 Tara = 10 tonnes =13,000 Sharp sand = 10 tonnes = 15,500 Planks - 25 pieces & nails = 25000 Iron 16mm - 4 lengths @4400 = 17600 8mm - 3 lengths @ 1250 = 3750 Binding wire =2500 Transport = 2500 Workmanship Labourer = 40000 Welder and carpenter = 13000 Cement = 28 bags @ 2500= 70000 Wire Mesh = 10500 Total = 273,000 Above Foundation Block setting + 2 soak away pits Blocks 4100 @ 150 = 615000 Water = 3000 Sharp sand = 36000 Joining sand = 18000 Cement @2500 =162500 labour = 56000 Total = 891000 Lintel and Pillars Casting 16mm - 8 lengths @ 3630 = 29040 8mm - 31 lengths @ 1030 = 31930 12mm - 34 lengths @ 2050 = 69700 1 binding wire = 4000 Transport & logistics = 4000 Wood and planks ➕ TP = 51000 Granite = Used remains Sharp sand = 15000 Cement = 30 bags @ 2500 = 75000 Workmanship Labour 40000 Carpenter 22000 Iron bender 17000 Total =360000 Parapet and soak away Casting Iron plus 12mm - 30 lengths @ 1970 = 59100 8mm - 51 lengths @ 1420 = 72420 Big Binding wire @ 7000 Extra iron = 9000 Quarter rod - 15 lengths @ 200 = 3000 Transport = 3500 Workmanship = 25000 Wood and cutting = 175000 Nail = 11100 Transport = 4000 Workmanship = 40000 Granite = 20 tonnes = 100000 Sharp sand = 15 tonnes = 21000 Cement 50 bags @ = 130000 Labour = 50000 Total = 710,000 Electrical (wall pipe installations) 20mm pipe = 2 bundles @2100 25mm pipe = 1 bundle @ 3200 Electrical materials = 14000 Workmanship =9000 Total = approximately 3.5M 4 Likes
|
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 9:28pm On Jan 23, 2020 |
topsy23: Brother, please can you assist with quotation for a 4 bedroom wiring |
Properties / Re: Alternative Building Material (expanded Polystyrene) by Muyi002(m): 9:39pm On Jan 22, 2020 |
Teewhy2:Please are these pop or polystering. How much per sqm |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 3:53pm On Jan 19, 2020 |
ak22:Thanks man. But I am not a fan of precast. More so, I have compared the price and it's close to what I have. |
Properties / Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by Muyi002(m): 3:24pm On Jan 19, 2020 |
Hi Guys, Thanks for always. Please the below is what I have as quote for parapet Estimated expenses Cement = 60 bags - 150 Iron ➕ workmanship = 160k Wood ➕ workmanship = 200k Granite 15 tonnes = 75k Sharp Sand 15 tonnes = 21k Labour = 50k Totalling = 656k I guess it's good. 2 Likes 1 Share
|
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (of 10 pages)
(Go Up)
Sections: politics (1) business autos (1) jobs (1) career education (1) romance computers phones travel sports fashion health religion celebs tv-movies music-radio literature webmasters programming techmarket Links: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) Nairaland - Copyright © 2005 - 2024 Oluwaseun Osewa. All rights reserved. See How To Advertise. 46 |