Properties › Re: Interior Design Project by redgem(f): 2:55pm On Oct 11, 2022*. Modified: 11:34pm On Oct 11, 2022 |
Please I'm sorry to disturb you, please how long will installation take for a 3 bedroom bungalow measuring 130sqm and how many days will it get dried? How should the payment plan be like? |
Properties › Re: POP DESIGN & TV WALL INSTALLATION by redgem(f): 11:37am On Oct 11, 2022 |
Please how long will installation take for a 3 bedroom bungalow measuring 130sqm and how many days will it get dried? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by redgem(f): 9:11am On Oct 11, 2022*. Modified: 12:18pm On Oct 11, 2022 |
hamtabfawaz: You're welcome! Amin & you too.
Modified: show him this too. I have...lol ,he said he doesn't want to fall, I told him not to call me again till after he is done..thanks so much... Modified: these people are out to get me, imagine calling me for buckets  Like there are 6 buckets in the site already but they said they can't use it cos plaster guys used them...that they need clean buckets. Okay, why did you not tell me you needed buckets when you sent list of materials to buy!!! Of all things to disturb me with, it's buckets  See, Never leave your projects unsupervised cos they will frustrate you with calls and demands.. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by redgem(f): 12:01am On Oct 11, 2022 |
hamtabfawaz: Don't have a proper pic of it!
Hope this helps! An horse like scaffold . It's not clear to me... I'd send it to him to see if he understands it.. Thank you so much �� God bless you. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by redgem(f): 7:28pm On Oct 10, 2022 |
hamtabfawaz: it's very possible to create movable scaffold, I use movable scaffold for most of my projects! Negotiate with him, he can still reduce price.
PS: Make Sure your pop guys are there before he creates the scaffold, so they can explain the heights they want. Please do you have pictures of the movable scaffold? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by redgem(f): 7:25pm On Oct 10, 2022 |
hamtabfawaz: Negotiate with him! He can still reduce the Price!
Or ask your pop guys, if they can make the scaffold, (if they can) they won't charge you that much, after you provide them with woods! They said that he refused to reduce price... Pop guy was even angry because they were supposed to start work today but didn't because of the carpenter...he even complained that the price was way too much. I have bought planks, nails and 2by2, it is just to create scaffold. I have left it for the pop guy to get a carpenter |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by redgem(f): 5:53pm On Oct 10, 2022 |
MrDraey: We agreed for 10k everything (2bed, kitchen, sitting room n dinning - he was the guy that did my roofing) I am just weak....eh... When I thought after buying the materials, expenses will reduce.. I don't even know who else to call |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by redgem(f): 5:32pm On Oct 10, 2022 |
bobkezel: In other words, if I hire a bricklayer for a job, after buying materials (cement, sand, water, stones), I will still buy/provide headpan, shovel, trowel, rope, tape, gauge.... I provided these...and now my POP guy insisted I provide range, board and scaffold which I have provided except the scaffold because carpenter wants to cut my neck... |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by redgem(f): 5:07pm On Oct 10, 2022 |
MrDraey: Good afternoon everyone
Please help review this quotation for a 54.54sqm POP job.
Pop cement 22bags @7,000 = 154,000
Filas 17kg @2,500 = 42,500
Binding wires 1roll = 11,000
Concrete nails 2pkts = 1600
G-nut oil 2bottles = 2,000
Joy Soap 2rolls = 2,500
Total cost of material= N213,600
Labour N1,000 sq meter = 54,540
Total = N268,140 How much to pay carpenter for scaffolding? This carpenter is requesting 4500 and he said that he will do 7 scaffolds for 3 rooms... Basically he wants to charge 31,500. Bolu1986 and hamtabfawaz is there no way to create scaffolds that can be moveable? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by redgem(f): 8:32pm On Oct 09, 2022*. Modified: 9:06pm On Oct 09, 2022 |
Good evening everyone... Please how can I remove cement stains from doors and windows? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by redgem(f): 12:17pm On Oct 08, 2022 |
kopell: 10k per door ? This price, I believe is for people in banana island sha ooo. Too cheap? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by redgem(f): 12:17pm On Oct 08, 2022 |
olukaygold: Depending on location and number of doors. but highest 10k per door.cos he won't do the installations at once cos he'd firstly install the skeleton frame in-between the entrance wall then fill it up with mortal cement after three days when the mortal dries,he can now do the installations. Okay Sir, thank you... |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by redgem(f): 8:42pm On Oct 07, 2022 |
olukaygold: MDF board is 12,500_13k while Hdf board is 25k_27k.Hdf board is stronger,more durable,more quality than Mdf board.Two board would finish a 3ft door. But the secret is,let a Pro handles the installations. How much do you think an installer will charge?? |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by redgem(f): 4:34pm On Oct 07, 2022 |
gbadexy: You may ask hamtabfawaz, bolu86 and the others that do screeding Oh... I totally forgot that it's the job of pop guys |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by redgem(f): 3:27pm On Oct 07, 2022 |
gbadexy: The total sqm would determine the cost of the screeding. As regards the paints, the cost is fair for what you would get for some known brands but I could definitely give you for less. It doesn't sound like the place is more than a 3 bedroom bungalow... I assume the fence is included in the external paint. In any case, the ratio of the external to the internal is off. Even if satin covers very high and can complete it, the ceilings paint is not sufficient for an upstairs duplex. If the painter promise to complete the whole job without requesting for extra, it's a good deal.. Good afternoon Sir, please what will be the cost of screeding for 100sqm? |
Properties › Re: Construction Of 6bd contemporary Duplex/2bd Flat With 2mini Flat By Rotecch by redgem(f): 2:47pm On Oct 07, 2022 |
rotecch77: Rooms door…. Still working on it These are wooden doors? |
Properties › Re: Interior Design Project by redgem(f): 10:41am On Sep 14, 2022 |
hamtabfawaz: Good Morning Madam.
your Measurements is Approximately a total of 130sqm.
Budget about 60- 65bags (it depends on your design tho) but buy 55bags first.
Buy 65Kg of fillas
Soap (3packs) & Groundnut oil 5litres
Tornado nails 15 packs (2½ inches)
Range & casting board.
Amin, God bless you too & Goodspeed on your Project. Amen.. Thank you so much for your response... |
Properties › Re: POP DESIGN & TV WALL INSTALLATION by redgem(f): 8:19pm On Sep 13, 2022 |
Good evening Sir, Please help me confirm the total sqm and how many bags of POP cement, kg of sponge and materials I will need for the building.
Parlour 14ft by 32.5ft
Masters 12ft by 15ft Lobby 4.5 by 7ft Toilet 6ft by 7ft
KITCHEN 12 by 12 Bedroom 1 (12ft by 13ft) Toilet 4ft by 6ft
Lobby 8.5ft by 5ft
Bedroom 2 12ff by 12ft Toilet 4ft by 6ft
Guest toilet 3ft by 5ft Veranda 15ft by 12ft Back yard 3.5ft by 12ft
God bless you. |
Properties › Re: Interior Design Project by redgem(f): 11:53am On Sep 12, 2022*. Modified: 8:20pm On Sep 13, 2022 |
hamtabfawaz: Yes! But the cement must be properly kept & avoid contact with water. Good morning Sir. I have paid for some bags but left them at the sellers shop. Please help me confirm the total sqm and how many bags of POP cement, sponge and materials will I need for the building. Parlour 14ft by 32.5ft Masters 12ft by 15ft Lobby 4.5 by 7ft Toilet 6ft by 7ft KITCHEN 12 by 12 Bedroom 1 (12ft by 13ft) Toilet 4ft by 6ft Lobby 8.5ft by 5ft Bedroom 2 12ff by 12ft Toilet 4ft by 6ft Guest toilet 3ft by 5ft Veranda 15ft by 12ft Back yard 3.5ft by 12ft God bless you. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by redgem(f): 5:37am On Sep 11, 2022 |
KolaShangOne: For a duplex? Can you do a breakdown of finishing just for discussion sake?
Oyaaa.. let's start.
Generally, these are assumptions.
1. External Entrance door - 350,000 2. Ante room door - 200,000 3. Room doors - 5 - 500,000 4. Kitchen external door - 180,000 5. Verandah door (upstairs) - 180,000 6. Toilet doors (5) + store door- 420,000 7. POP / Plasterboard - 1,700,000 - 2,000,000 8. Screeding (in & out) - 600,000 9. Kit hen cabinet + marble - 350,000 10. Kitchen sink & tap - 65,000 11. Hood extractor - 100,000 12. 5 burner cooker- 120,000 13. Wall tiles for 5 bathrooms + labour - 600,000* 14. Floor tiles (Italian, CDK) + sand + cement + labour - 2,200,000 15. Painting - in & out + labour - 750,000* 16. For logistics - 150,000 17. Scaffolding - 800,000* 18. Borehole - 700,000 19. Light fittings - 750,000 20. Switches + sockets - 300,000 21. Cameras - ****** 22. Electric fence - 350,000 23. Water closets - 350,000 24. Showers - 75,000 25. Mirrors, waste paper holder etc- 100,000 26. Railings for stairs, balcony etc - 400,000 27. External plumbing - 250,000*
Etc etc It depends on his tastes. 1. External Entrance door - 120,000 - 300,000 2. Ante room door - 80,000 - 150,000 3. Room doors - 5 - 200,000 - 350,000 4. Kitchen external door - 80,000 - 150,000 5. Verandah door (upstairs) - 80,000 - 150,000 6. Toilet doors(5) + store door- 150,000 - 350k 7. POP / Plasterboard - 800,000 - 1,500,000 8. Screeding (in & out) - 600,000 9. Kit hen cabinet + marble -200,000 - 350,000 10. Kitchen sink & tap - 25,000 - 65,000 11. Hood extractor - 100,000 12. 5 burner cooker- 120,000 13. Wall tiles for 5 bathrooms + labour - 300,000 - 500, 000 14. Floor tiles (Italian, CDK) + sand + cement + labour - 2,200,000 not a must to use Italian 15. Painting - in & out + labour - 750,000* 16. For logistics - 150,000 17. Scaffolding - 200,000* 18. Borehole - 700,000 19. Light fittings - 100,000 - 750,000 20. Switches + sockets - 50,000 - 300,000 21. Cameras - ****** 22. Electric fence - 350,000 23. Water closets - 350,000 24. Showers - 75,000 25. Mirrors, waste paper holder etc- 100,000 26. Railings for stairs, balcony etc - 200k - 400k 27. External plumbing - 250,000* Etc etc[/quote] |
Properties › Re: Every Home Deserves A Tastefully Furnished Product by redgem(f): 7:28pm On Sep 06, 2022 |
SanniOluwafemi: Installation of 4 flush doors @ Elebu, Ibadan
For enquires, call Maplewood Furniture 08022283035/07032186146 How much is this? This looks like panel door |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by redgem(f): 9:59pm On Sep 04, 2022 |
Soldierboy30: Thank you for your input, I still need help, please. How about expanding the living room to the yellow line I just indicated? Also, I don't see a need for the anteroom as I'll be more comfortable if a guest sits outside waiting(I intend to make a small relaxation spot outside for the family, it should serve for guests to wait comfortably too) and if I am comfortable/safe with inviting my guest in, I can ask them to come in if that makes any sense.
I will be interested in adding the anterior to my living room space. It can make for inbar space in the living room but that would mean I will have to move the guest room door but to where? Check my previous response to your message |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by redgem(f): 7:58pm On Sep 04, 2022 |
Tiztonio: looking at something as portable as this . 5million will go a long way but won't be enough.. Are you going to use pop all through? The type of tiles you'd use? Bathroom, kitchen and rooms accessories. Budget like 7 million to 15 million.. All depends on you but my advice is, start with the funds you have and small small, you'd get to the finals. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by redgem(f): 6:08pm On Sep 04, 2022 |
Tiztonio: Good day house. Can 5million be able to build a nice 3 bedroom bungalow(one parlour) with slant roof? It may, depending on your taste... |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by redgem(f): 6:03pm On Sep 04, 2022*. Modified: 9:52pm On Sep 04, 2022 |
Soldierboy30: Yes, those are doors, they'll be blocked as suggested, thank you. Any other observations? Good morning The lobby that divides the guest room and the bedroom, I feel its a waste of space, I guess the opening is for light to reflect into the other lobby but still isn't necessary. If you want to increase the space of the parlour, you should move the veranda to the kitchen side, add the space to the parlour and dining. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by redgem(f): 10:46pm On Sep 03, 2022 |
Soldierboy30: Please dear professionals in the house, I need your impute. I am currently building a 4badroom bungalow in Uyo, Akwaibom state and project had been on hold at the filling stage of the foundation.
I plan on resuming work but with small modification. I want one of the rooms to be added to the parlor for bigger living room space and a penthouse introduce in that way recreating and balancing it as 4 bedroom penthouse. In this regard, I contacting my architect but to my shock he said that may not be possible. The building is still at the foundation stage of sand filling the foundation.
I'll appreciate your professional inputs on this, thank you. The land size is 650sqm. How many doors in the main lounge? If those are doors then I feel you should block them
|
Business › Re: EXCLUSIVE : How To Make Level 2 Seller On Fiverr In A Month As A Nigerian Seller by redgem(f): 9:16pm On Aug 31, 2022 |
Anyone who can write financial reports here? |
Properties › Re: POP DESIGN & TV WALL INSTALLATION by redgem(f): 7:28pm On Aug 29, 2022 |
bolu1986: 0806 046 7308 Jibest. Thank you Sir... I will contact him |
Properties › Re: POP DESIGN & TV WALL INSTALLATION by redgem(f): 5:25pm On Aug 28, 2022 |
bolu1986: available sapele road Oghara along Sapele Road...was where I went to |
Properties › Re: POP DESIGN & TV WALL INSTALLATION by redgem(f): 4:59pm On Aug 28, 2022 |
|
Properties › Re: POP DESIGN & TV WALL INSTALLATION by redgem(f): 2:06pm On Aug 28, 2022 |
bolu1986: I don’t use them… I use Abs only. Sponge is around 2400 per kg It's hard to find Abs here... |
Properties › Re: Interior Design Project by redgem(f): 12:19pm On Aug 28, 2022*. Modified: 12:43pm On Aug 28, 2022 |
hamtabfawaz: Dr Mix is good! ✓
Elite Pop cement is good.
Per Kg of sponge (fillas) ranges from ₦2,400 - 2,700. Please be careful when you buy sponge as some Unscrupulous vendors tweak their weighing scale to sell 6kg as 10kg to unsuspecting customers.
Before you Negotiate the price, Request that you want the fillas with the original scale, (if it's possible, go with your own small weighing scale) to confirm that 10kg is actually 10kg. Okay Sir...thank you so much for the advice... Can the cement and sponge stay at most a month in the site without going bad? |