Semitunde's Posts
Nairaland Forum › Semitunde's Profile › Semitunde's Posts
1 2 3 4 5 6 7 8 ... 11 12 13 14 15 16 17 18 19 (of 46 pages)
menabadoo:I'm from Ibadan. And I've been to many parts. But I've still not been to 50% -that i know-talk less of someone like you who probably is used to seeing the ancient part while transiting or the popular areas when you decide to stay. When talking Ibadan, any visitor is a "John Snow"- you know nothing. |
menabadoo:You don't know more than 30% of the whole Ibadan. Most visitors and even some indigenes don't know more than 50% |
aresa:Lukesh... I don't think this guy will even remember who I am anymore. ![]() |
brabus:Good. But it does restrict you to the particular speaker that can work with WiFi or Bluetooth though. And I actually want to see how you'll hide the speakers within you decorative designs. Just to picture it. |
brabus:OK. Cool. Thanks for the nos. I'd like to see the bolded if that's what you intend doing. I've worked with wireless connections but for other uses like CCTV, not for sound system yet. I'd like to see the bolded if you intend doing it. |
brabus:This is really nice. Put sound system in the p.o.p na. . Its the new craze with up end clientele these days. Unless you need silence to concentrate.P.s. I'm sorry I made a mistake about the boifil packaged sewage treatment guys not being knowledgeable on the plant. My bad, the coy was actually BIOTECH. Intact I'll need the contacts you used for boifil if you don't mind. Thanks. |
mufutau55:Sir ke?! I get uncomfortable when I get called that on site, talk less of someone like you sir. I tried emailing them for another project that needed the same system and they didn't bother to reply the mail. The owner of the site where we used it actually went to the UK to meet and deal with them directly. Their responsibility for the plant ended when they shipped it in and I was just given the manual to study and direct the installation. I had its own issues. I'll advise anyone who wants to install it to have a good M$E consultant or an ENGR or builder who has experienced the installation before. Not because the installation is that difficult, but because different sites have to be dealt with differently. @brabus the guys in Nigeria for biofil are just for sales and can't really answer complicated questions. But they look like the only ones easily reached in the country. |
mufutau55:Its approx. 8m long and 3m wide. Height is around 2.5m. Its made of fibre material. Same as you have with the fibre bath tub. But is still very heavy because of the composition inside and the size. Its treats the waste and passes out relatively clean effluent that can be channels into the public drainage system. The system is a little like septic tank and a little like oxidation pond. It has like a filtration/ adsorption chamber that takes away the smell, taste and other impurities. It also has a section where air is blown into it so that the waste can decompose aerobically unlike a septic tank. From the manual, it can treat waste for up to 100 housing units. |
EgunMogaji:Anyways, you've made your point and I've made mine, regardless of how we have both interpreted it. In a construction process, as with other areas of business, tools are acquired as needed, and used in ways that would enhance the process, either in efficiency, scale or quality. If I have an inaccessible site then yes I can rent an concrete pump, or other options as may be cheaper but would get the job done. So I guess we agree on that. The packaged sewage treatment plant shown here was hoisted into place using an excavator. It got the job done. We didn't need a crane to do it. If it could be done manually we wouldn't even bring in the excavator cos we wouldn't need it.
|
erico2k2:OK. All the equipments you listed here can be termed "basic equipments" for.most construction coys. I wasn't talking about those ones. I was referring to the picture egunmogaji posted that had a concrete mixing truck and a concrete pump! Now those are higher end equipments and my take was that you must have a need for them to procure. It makes business sense to say procure those kinds of equipments if your target market is high rise buildings, or you're into estate development and you want to make a statement about finishing your estate within a particular duration. Of course when you have an equipment it can make your job easier. But that's for an equipment that is used consistently. You have to know what you are doing in terms of what the project ( or projects you are into) need as equipment. Having a concrete pump and mobile concrete mixer to be used on a clients house means the client must want his building done on a fast track. But then, how many days will a such a high end take off the schedule of say, a single building? Unless that building is a high rise ( and you dont have many such clients in the country on individual basis), using such high end equipments is a waste. I had already listed the consequences of acquiring such in my earlier post. I know a developer who has built six estates in lekki and has plans to build four more ( that I know). He bought a back actor and a pay loader recently because he needed to save the cost of renting those equipments for his site works. He looked at the number of times those equipments were used on rent and considering he has more works along that line, decided to buy them. They weren't for window dressing. @egunmogaji you don't have to be condescending in your response. We are all here to learn from each other. I know I'm always excited and interested in something new no matter how simple or foolish it looks; but what I've said is from from experience. Both construction wise, and from business perspective. |
EgunMogaji:I don't know why I join cool covos like this late. Thanks Mr HajjM for this...just what I'm.looking for. I'm all for positively pushing for change as regards construction methods. But I have to down the enthusiasm here just a little bit. Olashang said equipments are expensive. He's right. But that's not the real reason why you're not seeing many contractors using all the up to date tools and mechanisms. Acquiring some of these tools/ machineries is not the problem. Many Nigerians have such money to even spend on a fanciful sports car, so what militates against the Nigerian contractor in getting them machines? Basically three or four issues. I'll be using the example or the concrete mixer with pump you put the picture there. Contractors are also business people so here goes: 1. Fitting the machine into the construction process 2. Maintaining the machine. 3. What's the cost benefit? 4. Client requirements. 1. If you have a process that works with a scope schedule and quality requirements, why change the process? In other words, unless a process requires and demands the change, it won't be necessary especially for a business man. Any contractor that acquires a particular machine must have use for it. To use a concrete mixer and pumps on some projects for instance, you'd have to do trial mixes per cement type, per grade of concrete and per height/floor of building. You'd have to do test pumps of those trial mixes while construction is going on. This is to not just to see how the pumps cope but to see how the concrete cope with the variables. If there are issues with the pumping, provision has to have been made for alternatives, and you must know how to flush you concrete pipe within 15mins or you lose it. 2. I won't get a concrete mixer and concrete pump when I'll have to do the following: A. Get a quality control lab for test mixes. B. Get a maintenance department C. Need to source for spare parts. D. Train employees on the new process and on using the machines. E. Stand the risk.of losing the trained staff to poaching . The overhead cost for these won't be borne by the client here. And if Mr egunmogaji decides to pay, it doesn't mean the next client will, and so the equipment may be left unused while the company is drained of running cost maintaining the staff for that. 3 and 4 quite explains themselves. In short a client that requires serious tool/ machine upgrade will have to face an overhead cost ascribed to government projects. How many clients will want to pay for that? |
EgunMogaji: |
EndiaSami:OK. I'm just seeing this. Its not easy to check for defects on products supplied to site especially if the product is in a very large quantity. For example, I handled a site that needed 130 shower trays. They were checked as needed, but maybe due to stacking ( which was done by the supply coy), or the fact that some already had internal cracks that were not so visible; we later noticed that two were cracked. The plumbers working on site reported that they found them among the stack as they were taking the ones they needed for installation. I called the procurement guy and he had the supplier come change it. Maybe it was the small no.of defective trays or the large no.of consigment supplied that allowed for this wasnt my concern. Of course the blame can be passed to the storekeeper who checked the products in or the plumbers, but it will be difficult to prove for such a product that can have cracks not immediately detectable. Alternatively, you will have to not stack the products on top of the other so we can know if and when there are issues with some. This also applied to one of the cisterns. It was also replaced. Pls work this issue out with the client and if need be, get to the site and see what can be remedied of the situation. |
EndiaSami:OK I've sent your reply over, so if another opportunity comes up. Some questions were asked about the quality of the products, your location and your capacity to supply. It was via the mail you gave here. Check for beowulfprojectsolutions@gmail.com Modified: OK there is another window. Albeit a smaller one. Send your price list to the email above, for all the products you have available. It will be compared with those already recieved. |
@EndiaSami. Someone got in contact with you asking for more info about your products and supplies, but you didn't respond. You lost a big opportunity bro. Next time answer all requests, even if they seem silly. I was told "maybe you don chop belleful". I don't know what's wrong the the pm my replies kept getting back as mailers daemon. |
Theanonymous9:What's your idea on motion? |
eddyline:That's my guess too. It will be really ludicrous if this is the original copy and it wasn't detected till now. But that doesn't diminish the effect of this copy going round. |
Ishilove:People who have the book are already responding on twitter. Why no one noticed this earlier is what baffles me. It should trend in a few hrs though, so the information should get to the authorities concerned. |
lalasticlala:I only have the app on my phone so its not that easy to post a link. But I put a timeline screenshot of the original source of the information. |
More
|
I saw this on twitter today. A physics text book with watermarked words instigating self hate and low self esteem, and that's still putting it lightly. See for yourselves; Ishilove, lalasticlala. People need to be informed about this. https://mobile.twitter.com/HarkinHorbarsah/status/635095890055856128
|
MillionDollars:AY and Ramsey Noah are both Yoruba. But I get your point .... |
brabus:I have my reservations about No.4 but No.11 is a really good idea. A few questions if you please: How much of a difference in terms of cost and time can you get with burying the 2000L tank and doing your normal septic tank construction? How do you handle passive pressures acting on the tank especially in a poorly consolidated soil? How did you connect you septic tank to your soak away? Considering you need at least 100mm pipe between the two? And finally, did you cover the top of the septic tank/ soak away? How? Thanks. This is giving me all sorts of radical ideas. |
erico2k2:Good explanation. I will also add that for the buildings where you don't see DPM, some use some other means to limit the dampness. Especially where you know isn't close ton the water table, you can fill with sharp sand; you can also use water proving admixture in the concrete and line the areas where the walls will be. The most popular, as I have seen anyways, is to use hardcore. Many people don't quite understand the use of this. They feel its only related to adding strength to the compacted soil underneath. Yes, but its most critical work is to detach the over site concrete from any capillary action going on underneath. If you have this, you shouldn't have damp floors/walls. But its more expensive. In raft, even after putting the hardcore, it is required to put a DPM. This is quite important because by all means the r/f in the raft slab has to be protected. If the slab fails from r/f rusting,your raft has failed. |
twinskenny:You do windows or roofs is it? I usually call those on here who I have their details or who are referred by others here. I'll call when the chance presents itself. I'm just the project manager, not the owner. Subcontracting can sometimes be like a cult thing, where the only way another gets in is if the first on fails on delivery or quality. You'll be kept in view for that time. Besides, I've knocked quite a few heads on politics section and I won't want my pics becoming a trending topic here ![]() |
[quote author=segcymoor post=37118190][/quote]What you have here is like a process that I like. It makes a building look good and well done. Its about having your columns done first and then doing your blockwall after it, then do your lintels and next floor beams and slabs. With this system, you take control of the straightness of your walls from the bricklayers and this reduces errors. Its almost like doing a framed structure type of construction but just a little different. Its not as expensive as using a framed structure process.
|
Ak4me:Seriously, I stayed 5 good years in that hall. And at N90 per session ( when I didn't buy black market) Awo had some of the cleanest toilets. Crazy and loud we were but each floor was responsible for the toilets on their floor and in some places specific rooms had the duty to make specific toilets and bathroom clean, complementing the work of the official cleaners. We also made sure any new Hall executive council saw to any broken toilet seats, its one of the reasons why we voted them in. I guess those staying in those halls nowadays think they'd have had a toilet to come to if we didn't do our bit. They cannot wait for everything to be done for them thinking they've paid for it. The toilet is mainly for their use. They should have done their best to maintain it. Its not so difficult. |
bushdoc9919:Guy, pls find a very good seat and make your arse comfortable. Ppl will be spoon fed with one economic ideology and they run away with it, not seeing the bigger picture. |
The school administrators need to be checked seriously. CBN came with around N1B intervention fund and asked what the school needed done critically. The school asked for a new senate building! Dolts.They should have at least built a new hostel or rehabilitated the current ones with a fraction of the fund. The last time we had a major rehabilitation of all the halls was around '98 with PTF under Abacha. Funny! |
KolaShangOne:Mehn, we almost ran mad with especially Zenith bank. The funny thing is that banks actually love APGs. They get to charge interest like a loan ( amount involved is usually huge); and they get to pay for their staff ( handsomely off course) from the contract sum. Ours was at a time after the soludo mergers and the banks were looking for money here and there to shore their accounts. They sank their teeth in ours. In one of the cases, the Lagos state commissioner for housing, after intervening, had to warn all contractors on the banks to use for the guarantees. Else everyone was on their own. |
snakebeat:Bonding between the panels? It depends on what purpose you want to achieve and type of foundation you have. Its not advisable you do this in a raft foundation for example. But for a pad foundation like the one in the pix I posted, you can have the slab panelled. When its totally finished you might not really notice the panelling there and the bonding issue here is negligible. Many fuel stations use this style. Go and check. |
brabus:Lol. Edit. Hit Nairaland unprepared. And I was talking about me some 7yrs back. Nairaland is a good platform but I see many here rushing to be known after only a few years ( or months) of experience. I've seen quite a few threads opened on construction stuff make front page only to realise from some simple questions that the op may not actually know much, but is just selling himself online anyways. I wanted to avoid that. Know my stuff and not get disgraced trying to answer seemingly easy questions, or go AWOL without answering them. It didn't mean I wasnt "in the spotlights", just not in Nairaland. P.S. I'm surprised you have not closed the issues on this thread till now. I know the guys here don't want your downfall. This thread keeps getting longer cos they've not gotten what they really want- a whole hearted apology from you to all concerned. Pls do a post, treating each person with his own apology and acceptance of guilt. Then call for a closure of this thread. Bro, your defence ( which is quite good I must confess) isn't helping you much here. This is a public site, and as the world goes digital, you won't want anyone googling NextHome to have issues like this jumping out at him. |
1 2 3 4 5 6 7 8 ... 11 12 13 14 15 16 17 18 19 (of 46 pages)

. Its the new craze with up end clientele these days. Unless you need silence to concentrate.