₦airaland Forum

Welcome, Guest: Register • Login • With Google • Trending • Recent • New

Stats: 3,344,383 members, 8,511,588 topics. Date: Monday, 02 November 2026 at 01:12 AM

Toggle theme

N3xt's Posts

Nairaland Forum › N3xt's Profile › N3xt's Posts

1 2 3 4 5 6 7 8 ... 81 82 83 84 85 86 87 88 89 (of 242 pages)

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 3:09am On Jun 15, 2021
@smallsmall

You don’t want to know the role I play behind the scene here.

You really don’t want to know.
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m):
smallsmall:
Brabus, l m sure, like everyone, you know that these Nairaland Quotes and Screen Shots you post, CANNOT BE INDEPENDENTLY VERIFIED, THAT THEY ACTUALLY EXISTED or are BEING FABRICATED. undecided
How l wish you provide working links to them and w can independently go and read what transpired, since you dont miss an opportunity to always use such unverifiable Screen Snaps to defend yourself. cheesy

I think l remember that someone here accused you that you dont have a single Building, from Foundation to key-Handover, in your name and that is why you are seizing this opportunity to post the above.
Bad, sharp Warri boy cheesy

[s]Anyway, you did a lot of this sort of greedy, unprofessional mistakes in that 2014/2015/2016 period so, you can relate well with them so dont be an opportunist trying to use this single one of @Rotech 77, to take shine[/s]. grin grin
Smiles.

You should know I don’t cook up lies. The fact are up there to verify.

As a matter of fact, the Brabus Nairaland ID ceased working since 2015 so there’s no way to modify posts or fabricate one.

Just as I mentioned, a lot of folks will still read my posts and chose to attack the poster instead of taking the lessons.

______

Me an opportunists you mean. I laugh in Swahili.

As a matter of fact, I’ve defended more builders here than anyone else can ever imagine.

Just for the records, I’m still handling another negotiation for rotecch77 in the background without his knowledge.

Do you need a proof? I won’t mind sharing my recent engagement with a potential client of his in the last few mins.


________

Even @rotecch77 won’t dare call me an opportunist. I make a bold statement.

_________

I know you asked for link to my 2015 post. Here’s it https://www.nairaland.com/1588017/nexthome-builders-2014-2015-new/4#29974472

Brabus don’t delete posts. Truth needs no defense.
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 2:28am On Jun 15, 2021
smallsmall:
Most times, it is as a result of GREED, taking on too much jobs at a time.
You might be a very good professional, but when you delegate your responsibility, without proper supervision time, bad things will happen to your name.
Experience has shaped us over the years.

With my clients knowledge, I once delegated a project to an engineer recommended by my client’s folk and he messed up badly but I get to bear the brunt.

Today, I personally supervise all my builds. I hardly miss a day on my site because I don’t take on more than one project at a time and I’ve learnt to set up boundaries/limit.
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m):
In 2015, I wrote this but I’ve realized over the years that’s it’s very difficult for many people to comprehend my messages.

This explains the reason why I stylishly dodge finishing in my builds and focus more on carcass.

We’ve talked about engaging private consultants to oversee construction work done by contractors regardless their level of professionalism. It was right here that some folks claim there are pros here who do not require supervision.

Just for those who wish to learn, engaging a private consultant on a project isn’t done because you doubted the competence of your builder but to avoid regrettable errors. He’s there to checkmate what the builder is doing and to also validate the quality of work as each milestone is attained.

Imagine this was done on the issue raised above, one person would have spotted the error and request that the contractor correct his mistakes.

_______

We’ve recently also talked about number of jobs that a builder can undertake at a time. Some still felt those who are not answering every call in every villages in Nigeria are not “called of god.”

Some are moved by the busy works and activities.

lipsrsealed

_______

Lastly, we’ve seen builders who chose to focus on their area of core competence. It’s still here we see people looking for a key from a builder engaged to handle only carcass.

#AWonderfulWorld

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 9:45pm On Jun 14, 2021
#TheNonuplets by NextHome | Proactive Measure

Applying initiative prior to the start of our numerous concrete works to ensure there are no unnecessary delays, manage our schedule and flags anomalies thereby reducing human error.
______

Solar lighting provided by our client cool

Properties › Re: Construction Journal: The Nonuplets By Nexthome by n3xt(op): 11:31am On Jun 14, 2021
Unit A2, B2 and A4

Properties › Re: Construction Journal: The Nonuplets By Nexthome by n3xt(op): 10:23am On Jun 14, 2021
Unit A3

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 9:06am On Jun 14, 2021
Aforxzy:
I agree. This solution I'm not okay with. The new engineer has only increased the dead load on the structure in a bid to solve a problem. He ended up adding more load on the foundation and stressing the beams and columns.

I always advice that levels should be taken before lintel and floor (decking) formwork is done to correct any uneveness in the structure.
huh
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 7:45am On Jun 14, 2021
rotecch77:
Thanks you brother
We are into this game for some times now.

I have work on many building finishing with diff level slab and we corrected them mostly while laying tiles.

Look at this building we handled for a client here at ajah area few years back.

The initial person who did the ground floor and some other part of the building before we are called did a diff slab level and we corrected it while laying tiles (diff level of about 3-6” in diff area.
I knew what’s at play here and there’s no way I’d try to explain this without sounding insensitive to the issue at hand.

Few weeks back, someone asked a question on my thread and I shared this post below.

n3xt:
DUNKA:
Brabus Please if a builder is to build just the carcass while another person is too complete the interior and finish the building at what stage would the handover be?


Kindly ensure the builder deliver the plastering stage to avoid double expenses.

This means that the builder must handle:

- window installations
- door frames installations
- plastering of the walls (internal/externals)
- internal conduits

A lot of issues raised by 3strike were caused by the fact that the builder was no longer on the project. Most subtrades/artisans capitalizes on this to rip off unsuspecting home owners especially those unavailable to directly supervise their projects.

Here’s a very good example. I will never have placed planks on the damaged roof during plastering because I fully understand the consequence.
Another contractor plastering the house won’t damn the consequence because he can easily blame it on the person who did the roofing.

Also, during construction stage, there are lots of hidden and uncompleted works that only the builder who started the work from the scratch can identify (eg plumbings). If he’s allowed to walk away before you do your internal plumbings, you might run into problems and end up spending twice on the same job.

There are many more.

A builder can be fired if he messes up or he lacks experience.
However, I’ll always recommend that homeowners/contractors should find a way to manage construction complaints/challenges amicably as failure to do so do both parties more good than harm.

Before handing over, always ensure that an experienced consultant double check the job and ensure that everything is satisfactorily delivered.
Some people/contractor are so hungry that the only thing they’d be looking for on a project is the fault of other contractors and they’d make the issue look like heaven is going to crash if something is not done urgently.

Also clients need to take my advice above serious when working with busy contractors to avoid being ripped off by unsuspecting and hungry contractors.


_________

That aside, please kindly work with the client offline to find an amicable resolution and always ensure that critical stage of work are personally supervised by you (especially the concrete pour).

I’m sure if you did you’d have spotted the issue during the concrete pour and put the clients mind at rest.

The most important of this profession is supervision which must be done right. Delegation doesn’t offload accountability.




Good morning and Happy New Week.
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 4:28am On Jun 14, 2021
babadots:
You are a long standing member of this forum and a hitherto reputable one at that, but you did let yourself down on this particular issue. This reeks more of incompetence than it does of an error. 1 You may have aggravated it by arguing that you take the number of blockwork courses as the basis for establishing the level of formwork on a building that was erected by some unknown 'barber' or 'tailor'.

2You should have established the planned upper floor level independently on taking over the project. To not do that is, at best, negligent, but to argue that this is standard professional practice is dubious.
Your points are very valid.

1. The client won’t need to engage a professional to handle the slab if he’s confident the team that raised the ground floor blockwork can do a good job.

2. Establishing levels prior to take over could have save the day. So I think rotecch77 should admit the error here and offer an amicable resolution.

If the fix was recently applied as posited, it’s not too late to make amends.


_________

I’m currently working on a project that requires different levels for all the 9 buildings we are constructing. Myself and client did all we can to ensure that we take care of all the guessworks on paper before moving to site.

Properties › Re: Construction Journal: The Nonuplets By Nexthome by n3xt(op): 4:00am On Jun 14, 2021
I had to produce new 230 x 230 x 2400 Steel Shutters for this project in order to save construction time without compromising on quality.

There are several numbers of columns to pour on this multi-level project and our target is to deliver 1 Unit per day.

Properties › Re: Construction Journal: The Nonuplets By Nexthome by n3xt(op): 3:55am On Jun 14, 2021
Preparing Unit A3 for the first floor slab.
Kickers installed.
Column extensions installed.
Rough-in mechanical pipes installed.

Properties › Re: Construction Journal: The Nonuplets By Nexthome by n3xt(op): 3:50am On Jun 14, 2021
#TheNonuplets

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 9:17pm On Jun 13, 2021
BiigTee:
If rotech77 had done his due deligence nobody would be casting that thickness of concrete again.. 2. If rotech had come down to the site when I. Informed him of his mistake.. Maybe he could have rubbed minds with the person working there to come up with a better solution..

But did he come? No! Did he send anybody? No! Sending somebody a week after he was informed of the problem is just stupid! Was he expecting the engineeer there to fold arms and be waiting for him to come?
I get your point sir.

Moving forward, I’d recommend you stop all work and get a structural engineer (professional) to assess the integrity of the structure.

I’m even more worried about the fix than the main issue right now.

Once again sorry for this regrettable error.
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 8:49pm On Jun 13, 2021
Just for learning purpose.

Here’s a slab with different thickness.

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 8:33pm On Jun 13, 2021
BiigTee:
Can you all see the amount of concrete that was cast to level the decking the a professional claimed to have supervised! No, look at it and tell me why I should feel happy! 10" of thick concrete! Even thicker than decking which is usually 6"
Who recommended this solution?

I think 10 inches thick concrete is just too much load on the structure regardless of the justification the engineer might have given.

Sorry for this error.

________

A simple fix for such issue is just to section the slab after confirming that the as-built design of the slab conform with structural design requirement.
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 8:08pm On Jun 13, 2021
hamtabfawaz:
Hmm! Baba you just raised a good point.

I would take this as a great advice to enlarge my Empire.

Good idea but Na money kill am.
Money well spent
Properties › Re: Construction Journal: The Nonuplets By Nexthome by n3xt(op): 10:27am On Jun 13, 2021
Just in.

Properties › Re: Construction Journal: The Nonuplets By Nexthome by n3xt(op): 6:53am On Jun 13, 2021
We are currently working on completing 3 more foundation (Unit A2, B2 and A4) in the coming week and also getting Unit A3 to first floor slab.
Properties › Re: Construction Journal: The Nonuplets By Nexthome by n3xt(op): 6:49am On Jun 13, 2021
#TheNonuplets

Properties › Re: Construction Journal: XL6 Trillion | Atrium House by n3xt(op): 6:38am On Jun 13, 2021
Homextras:
Nice one bro,

If you were to build for resale, which would you consider between four 2/3 bedroom flats or 2 semi detached duplex on 300sqm of land.
Factors- which is ‘cheaper to build’ and which would yield more returns once completed.
Both are great options but the land size might affect your ROI except the location is in a prime area.

I’d do a semi detached duplex instead of block of flats on a 300sqm if it were me. The fewer the number of occupant the better.
Properties › Re: Construction Journal: XL6 Trillion | Atrium House by n3xt(op): 6:31am On Jun 13, 2021
Greenarrow01:
Asin
I am badly waiting so see how this project will look like
I want to see it current state
Except of course
If the owner doesn't want him posting more pics or if funds are depleted
I want to see it too! I really can’t wait to share the steel roofing and the current look.

I’m sure my client do not have issues with us sharing images, it’s just so unfortunate that we couldn’t get good pictures from all the subtrades working at moment.

I’ll do my best in coming days to get some good pictures and share the final looks of the project.

Regards.
Properties › Re: Construction Journal: XL6 Trillion | Atrium House by n3xt(op): 6:27am On Jun 13, 2021
Beframia:
@ n3xt: come and complete what you started o, you can't just whet our appetites and not serve the main dish.
I'm really itching to see the completion of this build. Give us updates abeg.. �
Greetings!

Pls kindly expect update on this project soon. The installation of the roof trusses was done last week. Plastering of the roof parapet wall is being planned... a subcontractor may likely handle this.

After this comes the roofing sheet installation which wraps up the carcass phase.

Subcontractors have been carefully handpicked by the client for the next phase of the project.
Properties › Re: Construction Journal: The Nonuplets By Nexthome by n3xt(op): 8:18am On Jun 12, 2021
Chekitaut:
Congratulations more grace.
Thanks bro!
Properties › Re: Construction Journal: The Nonuplets By Nexthome by n3xt(op): 3:22am On Jun 12, 2021
Unit A3 - 1st Milestone Achieved.

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 3:17am On Jun 12, 2021
The Nonuplets by NextHome

Unit A3 - 1st Milestone Achieved.

https://www.nairaland.com/6576114/construction-journal-nonuplets-nexthome/1#102630274

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 8:19am On Jun 11, 2021
Sigh!

I can’t imagine myself struggling to build a house and still have to go through hell just to collect rents.

Well that’s just me. I’m not a fan of commercial lettings.
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m): 7:03am On Jun 11, 2021
UC92:
Do a retaining wall for the foundation, then complete the fencing with block work.
Oga N3xt did something like that in one of his recent job.
Yes! I did something like this for a nairalander about 10 years ago in Lambe, Ogun state while constructing a 2 flat for him.

He has similar issue with his fence. The fence fell 3 times before we got on his project. I wish I can get pictures though.
Properties › Re: Construction Journal: The Nonuplets By Nexthome by n3xt(op): 9:21am On Jun 10, 2021
Piles of Rebar

Preparing ahead for the first floor slabs

Properties › Re: Construction Journal: The Nonuplets By Nexthome by n3xt(op): 9:16am On Jun 10, 2021
Unit A2 and B2

Properties › Re: Construction Journal: The Nonuplets By Nexthome by n3xt(op): 9:13am On Jun 10, 2021
Updates Here and There

Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by n3xt(m):
smallsmall:
You are making things worse for the Apprentice and it is unfortunate, if you have no job or placement to give him.
You should not have dissed the other guy the way you did and on top of it, You are still Wrong!
This has nothing to do with having a sense of entitlement, it is about 'Courtesy', which is not a Nigerian thing.

Maybe it is your comprehension of English or his statement but l wont dwell on that too much because l dont it to be an issue moreover, this is not an English class. undecided
The word "please" is not a sign of inferiority, when used for another person, it is a sign of Courtesy.
A British Policeman who is putting you in handcuffs, will say: Please can you extend your hands out (so he can put the cuffs).
That shows 'courtesy' and not that the Policeman is inferior or afraid of you.

Let me quote the 'applicant':

And let me quote what you wrote: Please indicate, so i can contact you.
You can see that your statement and his, are not exactly the same, due to where the word 'Please', is placed.

You, are assuming that the 'Please' at the beginning of his statement, covers the whole sentence but someone like @sonnie10 understands English and proper usage of words and he knows it does not cover the whole sentence.

The 'Please' should have come just before the 'indicate so l can contact you'.
To appear as: ... I also need more professional experience in my field, please if you're a professional in this field, PLEASE indicate, so I can contact you.

The reason it is so, is that "indicate" is 'a request' in that sentence and it is what needs the 'courtesy' (please) to qualify it moreover, when you are making a request to someone who will be in the position of a Teacher or a Boss, showing courtesy, in making such request is not a bad idea.
My opinion is that the 'applicant' did not pay enough attention to his sentence but he means no arrogance, in his request.

I come in peace o and l have stomach pain as well, so l cant go back and forth, on the matter.

,
Succinctly put.

I’ve won more deals through the way I communicate with my clients than through what I have in my head.

Well that’s just me!

1 2 3 4 5 6 7 8 ... 81 82 83 84 85 86 87 88 89 (of 242 pages)