Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 4:31pm On Oct 14, 2020 |
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 3:06pm On Oct 14, 2020 |
EgunMogaji2: We give thanks my oga.
I’m reducing my elaborate window sizes. When I was in Los Angeles 6 X 5 windows were the thing, now that I’m in Nigeria and looking at N1.5M estimates for windows, Son Of Man had to caution himself and reduce 
But we move, no time. about 6m by 5.4m living room - OGA, this self is BIG OOH... my living na 4.8 by 4.2 ooh |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 2:59pm On Oct 14, 2020 |
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 2:09pm On Oct 13, 2020 |
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 9:18am On Oct 13, 2020 |
|
Properties › Re: Estimating Cost Of Fencing 6 Plots Of Land - A Nairalander's Question by saydfact(op): 7:52am On Oct 13, 2020 |
PHOTSEE: Thanks saydfact , i love your threads and posts, being liking all day long. it advicable to mold blocks or buy blocks? Thanks for reading and liking.. Its cheaper to mould but I always prefer buying if you won't be on ground everyday to monitor that quality is maintained.... while in buying, you can be sure of quality before paying.. Goodluck |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 4:30am On Oct 13, 2020 |
JustCryptos: Guys please, I need help.
The engineer on my project sent this as a quote for plastering a 3 bedroom flat (all ensuite) with a visitor's toilet.
Labour Ranging plastering Inside plastering is #120,000. Outside plastering is #90,000. Windows dressing is #45,000.
Not Ranging plastering To plaster all the houses is #170,000. Inside and outside. No window dressing.
Materials Two trips of gum sand and two trips trips of shape sand and 110 bags of cement.
When I asked the difference between the two, he said in the first one they'll dress the plaster and plum it to be level. This won't be done in the second case. I can't wrap my head around plastering a house and not making sure it's level.
Secondly, I thought plastering a room takes 3 bags of cement? I did my calculations with 4 bags to be on the safe side. However, the engineer is saying each room of around 3.6*3.6m will take 5 bags using ranging method.
Experts please what's your take on this? CnC n3xt, spyder880, saydfact, lastpage, rotecch77 Hi Sir. The labour he quoted is OK..... While he put different prices for the method is because one takes more time and give more squared edges while the other is basic.... There's nothing more to explain there. On the Cement.... You'll need far less than 110 bags..... 9ja never bad reach that level.. Lol Goodluck |
Properties › Re: Estimating Cost Of Fencing 6 Plots Of Land - A Nairalander's Question by saydfact(op): 4:24am On Oct 13, 2020 |
PHOTSEE: Thank saydfact, please is the molding of block inclusive or just the fencing ? thanks. Morning.. Buying was included. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 10:35am On Oct 09, 2020 |
EgunMogaji2: Baba, where you dey when certain quarters waylayed and abused me for stating this some days ago  Boss... Na busy busy me ooh.... quote me next time, make I help you waylay their bumbum........ all man na Engr now ooh, even me wey never go Engineering schol b4 na Engr, dem dey call me oooohhhhhh.... |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 10:12am On Oct 09, 2020 |
DFAMEGUY11S: oga you have insulted me enough your number is the one you blocked me or what pls believe me am only doing this for the respect of this forum if not I wouldn't have been disturbing myself or the peace of people here because of tank your brother or friend brok that you are accuse me of because i know fully you have done your mind or wors by posting what you posted on my thread but if you feel that am what you called me then my address or shop number is with you direct the person to come and meet me , or send any available person you get over there to waybill the one they break I have I agreed to change it okay and I beg you stop insult me okay cc: boyestic: ARE WE STILL ON THIS CASE ? Here's my advice - WORSE THINGS HAPPEN IN LIFE.... their is absolutely no need for the insults and name calling on this thread. YOU BOTH (with due respect) should act more maturely and resolve. my suggestions: BOTH PARTY SHOULD PAY A PART OF THE PRICE. Dframe - there is no need to replace the good; just send his money to him, what if you send a replacement and it gets broken in transit again, would you bare the lose again? Boye - Kindly take a part to help his business - you can pay an amount that covers transport, or how much a broken system could be or just ask for (say) 70-80% refund... ANY1 CAN BE IN THIS SITUATION.... I paid a carpenter 100k to do a job for me months back - and his nos suddenly became unreachable ( I assumed I've lost my money) - months later I got a call from him saying he was sick and under went a surgery... he asked about the job, I told him I've done it.... weeks later, I called him to take 20k (which was his workmanship) and return the 80k which was for materials.. NOBODY DIE OOH |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 9:54am On Oct 09, 2020 |
davodyguy: Saw this construction
They started the piling immediately after the lockdown in May and now roofing.
After the piling and ground slab, instead of setting blocks, they did columns and beams, decked, moved to the upper floor, no setting of blocks, just columns and beams, now about to roof.
Is this really okay? lol Please don't ask this question outside oooh.. THIS IS THE STANDARD WAY OF CONSTRUCTION (also the standard way BOQ is arranged).. Na money dey make man lay block b4 beams ooh.. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 4:43pm On Oct 06, 2020 |
michlins: How do you you deal with some clients. Two months ago, someone asked me for the price of something and I told her. Then last week, she came back and I gave her the price but this time it has increased a bit. She began to fume and accuse me of not wanting to work for her.
The whole thing just tire me maybe by putting a clause (phrase) that the quotation is only valid for (say) 2 weeks from date displayed. OR by adding subject to change in market price. U kant ki yourself ooh |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 11:54am On Oct 05, 2020 |
kingzsoul: Hello house. Please can 1m be enough to do raft foundation for 2bedroom ? MOST LIKELY NO... 1 tonne of rebar is about 250k and you should need at least 1and half = 380k the wood you would need can't be less than 150k Granite would be about 150k Sand, lets settle for 100k Labour for all workers (maybe) 200k PERHAPS - filling b4 work can be done, but surely filling after raft is done. AFTER ALL THE ABOVE, you still have rebar to floor and columns, concrete oversite (german floor) THE ESTIMATE ABOVE ISNT ACCURATE - just me thinking out loud (could be more but surely not less) Goodluck |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 11:16am On Oct 05, 2020 |
ANY SMALL THING - NEXT THING NA SCAMMER THIS, SCAMMER THAT.......
THIS IS ONE OF THE REASON I DON'T ADVERTISE ON HERE, IN-FACT FOR ALMOST 10 YEARS OF BEING ON PROPERTY SECTION, I REFUSED COMING TO THIS THREAD (until Teewhy2, drew my attention to someone who stole a plan from my thread and tried to sell it here) - lol
WELL - ITS NOT BY FORCE TO WORK FOR PEOPLE, I TURN DOWN OFFERS IF I FEEL IT'S GOING TO BE A PROBLEM AT THE END OR IF I GET THE FEELING OF AN ATOM OF DIS-TRUST.
WE HAVE TO TRUST EACH OTHER 100% TO HAVE A DEALING PLUS I DON'T ASK FOR MONEY ANYWAYS, UNTIL I DELIVER......
My advice to whoever has a good name to protect, deal with people who trust you - I've had people here who trusted me 100% even b4 contacting me, just by reading my threads.....
NO BE BY FORCE TO GET CUSTOMER - SOME ARE OUT TO TARNISH YOUR NAME.
BTW: I've had plenty people end up not paying for services - but I will NEVER disrespect them or call them out - Infact, I still send them New year messages and call them Sir.....
we move.... |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 7:51am On Oct 03, 2020 |
Unibenfucker: Brothers in the house ,I got a Land in lekki yesterday in an estate for my client. I want to sand fill it. Like how many trucks of 20 tonnes filling sand would I use to fill it up to a reasonable depth.? My advice would be wait for the dry season - build your raft fence and then think of filling after that. GOODLUCK |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 4:00pm On Sep 28, 2020 |
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 3:59pm On Sep 28, 2020 |
Tade722: THE BENEFITS OF USING POLYSTYRENE (EPS) DECKING BLOCKS
EXPANDED POLYSTYRENE(EPS) serves as a permanent shutter to hold the concrete in place, these EPS blocks are used widely in construction. They have no structural value, but is necessary for purchase and is used as thermal insulation and a void filler when pouring concrete slabs. Light weight and easy to install with great thermal properties these Decking Blocks are a necessity for the building process. EPS blocks are a cost effective method of permanent shuttering and recyclable having no negative impact on the environment. Below are seven more benefits of applying Polystyrene (EPS) Decking Blocks.
1. Better acoustic and thermal properties, thereby reducing energy consumption which in turn saves money.
2. EPS is cost effective relative to concrete and cement blocks.
3. Easier and quicker to handle and install requiring less propping. This also results in a reduction of the amount of concrete used.
4. EPS blocks remain as permanent shuttering.
5. EPS is environmentally friendly and 100% recyclable. We also only use fire retardant material that complies with building regulations.
6. Due to the light weight structure of the EPS blocks, less concrete beams would be used as would be the case in a normal insitu building.
7. EPS blocks are resistant to vibration, aging and rot and are Chlorofluorocarbons and hydrochlorofluorocarbons free. As such there are no Ozone depleting elements in EPS. ~ TIG.
For more details and PurchaseContact Charis Pair Developments Call/WhatsApp: 07054422000[img][/img] everything BUT the cost - it's actually more expensive.... (talking from practical use) |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 4:45pm On Sep 23, 2020 |
Pascal2016: I need advice from expert in the house pls. I want to build a two deck (2 storey) and my Engr said we are going to use the this foundation type I uploaded in this picture. Pls should I tell him to go on? I have not seen where people dug foundation for pillars only, chained it and casted DPC and followed up the block formation. Is this really going to carry the the two storey building? 1. IF THE ONLY REASON HE GAVE YOU IS COST; THIS IS MORE EXPENSIVE THAN THE CONVENTIONAL (Pad and Strip). 2. If you decide to use this, then the building is better made as a FRAMED STRUCTURE... ie you complete the concrete structure (columns, slab and roofing) then come back to block-works and lintels. GOODLUCK |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 7:08am On Sep 23, 2020 |
bebe2: @ericko2k2 @rotecch77, @spyder880, @egunmogaji and others plssss i need your input as this will help me decide if to build it or concentrate on other projects.
am on my knees, please. i know u wont have the exact but a loose estimate will give me a guide. 10m comes to mind.... |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 11:22am On Sep 21, 2020 |
Morning All - I greet |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 9:06am On Sep 19, 2020 |
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 9:03am On Sep 19, 2020 |
michlins: it's all about the choice of the customer. Some want something very fancy while some want something classy and will never fade in terms of design.
What if I tell you that the door in discussion is more expensive than the door I showed you earlier. offcourse I know that on cost..... soup wey sweet, na money ooh |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 8:58am On Sep 19, 2020 |
kenpower: A design brief is achieved base on client submission and expectation notting absolutely is wrong wit the design pls,,,,,If fact is a perfect tourch there are NOT many design we can tag as PERFECT - I agree, that was a perfect design...... simple, functional and classy |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 8:55am On Sep 19, 2020 |
michlins: flush doors like this abi? This is iron door too and there's a way I can eliminate the noise you're worried about GBAM - This can easily fly for all internal doors....... perfect, better if padded or filled. |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 8:50am On Sep 19, 2020 |
|
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 8:38am On Sep 19, 2020 |
michlins: this is why I usually tell people to use iron doors but they will tell you it's not good for internal doors. Eight years down the line, the only thing you will do on iron doors is to repaint it and you have yourself a brand new door.
Buildings are meant to last and not act as liability. Here's a sample of door that I delivered to oga Spyder yesterday. It was paid for by another Nairalander I wont agree with you on all internal doors being iron doors because (like you say) they last for ever....... We both agree wooden doors can last forever too - it all comes down to the quality of doors and materials..... whether wood or iron, if the quality isnt OK, na same result. BTW: Nice door you did. keep it up. shogbenga - CHINA doors dont last more than a year self, that yours lasted that long means the quality was really high. Whatever you choose, choose quality.... and YES, You can use iron doors for interior BUT the design shd be as simple as possible (if possible plain like flush / plywood doors) |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 8:15am On Sep 19, 2020 |
omanzo02: Wow! You mean this 2 bedroom apartment will have 3 water closet and 2 bathrooms, and the entrance thru the rooms? Come on, this is not convenience but overplan and overdraw in my opinion.....well, no be my wahalla sha! what exactly is wrong with that design? and why are you making it your wahala by trying to discredit it.. cc: mssiah - you have a nice design,.... kudos to the designer... |
Properties › Re: General Topic Thread-To Discuss Anything And Everything in Building Construction by saydfact(m): 8:12am On Sep 19, 2020 |
|
Properties › Re: How To Build Your Comfortable House Earning Little (detailed) Pt 2 by saydfact(op): 8:08am On Sep 19, 2020 |
Topmost11: My 3-bedroom building is presently at dpc level(I am doing the filling). I am seriously considering using cement stabilised bricks(mortar or mortarless, I am undecided on that yet). And i don't want to plaster both in and out. From pictures i have seen and actual construction sites visited, i realise I need to incorporate columns. I am guessing the columns are for load bearing for the roof structure. But, i do not have columns on the present structure. Do i break the necessary places and introduce the columns or it is too late? Also funds are not readily available so I am building as the funds come from savings and other means. What I am looking at is if I finally decide to go for bricks, I will suspend building and produce total bricks I need, get other materials ready for roofing and get everything done at once(laying of bricks and roofing) during a dry season. I can use the period of wait to gather all necessary materials and generally get ready. Please kindly advise. Thank you.
PS: is it colour that is added to the mortar to change the colour to the reddish brown?. If I decide on mortar as binder, I will prefer the colour to be same as the bricks and not the ash/white of normal cement( dangote/elephant etc). I just love bricks for the aesthetics. I have about 450 9" blocks and 600 6" blocks on ground. I don't see hem as waste as I will used them to do 3 courses of blocks before completing the rest with bricks. The 6" leftovers can still be used for fencing. Thanks. 1. Brick is more expensive, more durable and if properly done more beautiful (pleasing to the eye) 2. Normally for bungalow, there's no need for columns except at entrance porch AND if soil is NOT stable (send pics of land and building to enable me advice properly 3. Depending on the choose of brick, there could be need to plaster or not plaster; also the workmen MUST be real good and precise if you wont be plastering. Thanks for the comments and GOODLUCK |
Properties › Re: How To Build Your Comfortable House Earning Little (detailed) Pt 2 by saydfact(op): 8:04am On Sep 19, 2020 |
Topmost11: My 3-bedroom building is presently at dpc level(I am doing the filling). I am seriously considering using cement stabilised bricks(mortar or mortarless, I am undecided on that yet). And i don't want to plaster both in and out. From pictures i have seen and actual construction sites visited, i realise I need to incorporate columns. I am guessing the columns are for load bearing for the roof structure. But, i do not have columns on the present structure. Do i break the necessary places and introduce the columns or it is too late? Also funds are not readily available so I am building as the funds come from savings and other means. What I am looking at is if I finally decide to go for bricks, I will suspend building and produce total bricks I need, get other materials ready for roofing and get everything done at once(laying of bricks and roofing) during a dry season. I can use the period of wait to gather all necessary materials and generally get ready. Please kindly advise. Thank you.
PS: is it colour that is added to the mortar to change the colour to the reddish brown?. If I decide on mortar as binder, I will prefer the colour to be same as the bricks and not the ash/white of normal cement( dangote/elephant etc). I just love bricks for the aesthetics. I have about 450 9" blocks and 600 6" blocks on ground. I don't see hem as waste as I will used them to do 3 courses of blocks before completing the rest with bricks. The 6" leftovers can still be used for fencing. Thanks. i replied earlier but got banned and post deleted |
|
|