Rawani's Posts
Nairaland Forum › Rawani's Profile › Rawani's Posts
1 2 3 4 5 6 7 8 ... 22 23 24 25 26 27 28 29 30 (of 79 pages)
atlwireles:Address the issue, the figures have been broken down for you to see. |
Obiagelli:Its pure lack of sincerity, purpose and vision in governance. |
Bjayjay:You're comparing apples and oranges. If PMB and GEJ had the same bitterness between them, do you think they would have had all those joint transition meetings? Of course not. |
mikeansy:Lets take the Ministry of Agriculture for example, it was after the transition documents were studied that the recommendation to combine it with the Ministry of Water Resources was made. It would not be advisable to pre-empt the committee's recommendations by choosing a shadow cabinet. GEJ inherited his own cabinet, yet it took him six weeks to re-appoint the ministers. |
mikeansy:How would he appoint a cabinet before sorting out the ministries? How would he sort out the ministries before having a detailed knowledge of their current state? Last time I checked, it was the same PDP that accused him of running a parallel government before assuming office. |
If they did not intend to deliberately sabotage this government, they wouldn't have waited till May 28th before handing over the transition documents which the Joda committee were to study and make recommendations with. With PMB's plan to prune and restructure the ministries, how would that have been possible without knowing the state of each individual ministry? |
Euro31:You're funny. |
quid:That BBC Hausa report was reporting the ISIS and BH attacks. Don't try to deceive the gullible. |
Freemanan:Of course you wouldn't hear TANoids call their godfather to account. This is one of the reasons we will continue to under-develop ourselves. |
Sweetlemon:The PDP will do anything to get someone of his pedigree within their fold. |
NDPVF:Your lord and master Barca will tell you better. Why do you think my support for Tinubu must mean I'm from the SW? Can't you think without the cloud of ethnicity muddying your thoughts? |
mikeansy:Tinubu is neither occupying any post nor aspiring to run for any so I'm puzzled about the basis of your comparison. There are many ways to catch a thief, and the most obvious which you stated is usually the least effective. |
Freemanan:They should be probed and the shortfall squeezed out of them. It's ridiculous, over 100% above budget. |
omenka:He apparently forgot he's living in a glass house. Tinubu is not one to be toyed with. |
Freemanan:That's great to know, its puzzling its taking this long considering the sum of N347 billion was the original budget for the project, and so far over N700 billion has been spent on it. |
The 338 kilometer dual carriage east-west road is a project initiated in 2006 to transverse major towns in the Niger Delta region. The project has faced hiccups over the years leading to delays in its completion. The reasons for this delay allegedly include, untimely release of funds and incessant demands by communities on whose lands the highway is expected to transverse. So is this project complete after the huge funds that has been spent on it? I remember Reuben Abati posted fake pictures of the progress of its construction before he was busted. |
East-West road gulped N726bn under Jonathan The administration of former President Goodluck Jonathan voted N725.771 billion for the East-West Road project in the Niger Delta region, checks by Daily Trust have revealed. The funds were approved between August 2011 and December 2014 at the weekly Federal Executive Council (FEC) meetings presided over by Jonathan who hails from the benefiting region. The project is yet to be completed despite the huge funds so far expended on it. Our correspondent reports that the 338km dual carriage East-West Road, which traverses towns in Bayelsa, Rivers, Akwa Ibom, Cross River and Delta States, was first awarded in 2006 for N211 billion by the administration of former President Olusegun Obasanjo. Critics had queried the approval of funds, describing the multi-billion naira East-West Road as a conduit pipe for corruption. The Senate Committee on Niger Delta Affairs had also, on several occasions, sought clarifications on the award of the contract. The East-West Road was initially divided into four sections, but Jonathan’s administration late last year added a fifth section to it, covering Oron to Calabar in Cross River State. The immediate past Minister of Niger Delta Affairs, Stephen Oru, had stated at the ministerial briefing at the National Press Centre, Abuja on December 11, 2014 that “The Federal Executive Council had approved Section V of the East-West Road, covering Oron to Calabar in Cross River State; a distance of about 23.09 kilometres”. The ex-minister had also disclosed that the additional section of the East-West Road would be partly funded with a loan from the China Exim Bank. On August 18, 2011, the FEC approved N245.9 billion as augmentation sum for Sections I, II-I and II-II of the East-West Road contracted to Messrs Setraco Nigeria Limited. The contract sum of Section I (Warri-Kaiama) in Delta State was revised from N64.1bn to N112.16bn; Section II-I (Port-Harcourt-Aoada-Kaiama) in Rivers State, from N29.9bn to N48.9bn and Section II-II (Aoada-Kaiama) in Rivers/Bayelsa States, from N44.8bn to N84.759bn. A sum of N671 million was on October 24, 2012 approved for the contract for consultancy services for the engineering design of the extension of the East-West Road (Section IV) from Oron in Akwa Ibom State to Calabar in Cross River State awarded to Messrs Siraj Nigeria Limited.In 2014 alone, a total sum of N479.2 billion was approved for the project. On October 22, a sum of N165.25bn was approved for the construction of Phase I, Section V of the road from Uyo/Oron Roundabout in Akwa Ibom State to Calabar-Odukpani Road in Calabar, Cross Rivers State, awarded to Messrs China Civil Engineering & Construction Company (CCECC). The FEC also approved N269.383 billion as “revised estimated total cost 2” for the variation of engineering construction contracts for the dualisation of the East-West Road, Section I (Warri-Kaiama) in Delta State and Section II: Subsection II-I (Port Harcourt to Aoada) in Rivers State and Subsection II-II (Aoada-Kaiama) in Rivers/Bayelsa States awarded to Messrs Setraco Nigeria Limited. On November 12, 2014, a sum of N43.9 billion was approved for the upgrading of the 15km of the Section III of the road: Port Harcourt, from Eleme Junction to Onne Port Junction in Rivers State, awarded to Messrs Reynolds Construction Nigeria Limited. The Federal Executive Council, on December 3, 2014, approved N661.33 million for engineering supervision of the construction of Section V of the road (Oron-Calabar), Phase I in Akwa Ibom/Cross River States, awarded to Messrs Siraj Nigeria Limited. The former Minister of Niger Delta, Oru, had late last year disclosed that the East-West Road, initially scheduled for completion in December 2013, had to be shifted to the first quarter of 2015 because of inadequate funding. These sums give a total of N726bn. “Due to paucity of funds and the short dry season prevalent in the region, the inauguration of sone of the completed sections has been shifted to the first quarter of 2015”, he had said. Barely two weeks to the end of Jonathan’s administration, Oru, while addressing State House journalists after the FEC meeting of May 13, 2015, had put the completion stage of the East-West Road at 90 percent. He had said: “You’re aware the East West Road is made up of four sections. Section one is from Warri to Kaiyema, Section II-I and II-II is from Kaiyema bridge to Port Harcourt, Section II is from Port Harcourt to the beginning of Akwa Ibom and from there to Oron. And the fifth section that was introduced is from Oron through Odukpani to Calabar. Most of the old sections from I-IV have virtually been completed. The second bridge at Patani will be completed with the next one week. Section I of that road, I can say is 99 percent completed. “I travelled on it recently and it took me less than one hour to get to Port Harcourt. Section II, there is a bridge problem in one area but order than that, about 90 percent of Section II is completed. Section III has a new section which was awarded last last year to RCC between zero zero to Onne port because of a lot of challenges which were not part of the east west road project when it was started, because that section was fully developed by the time the East-West Road projected started. “It was already dualised but with the new project is going to be three lanes. The centre of the road because of the heavy axial trucks, the shoulders of the road is below the road. That was why a new contract was awarded around October last year. So, if you put everything together, we can say 90 percent of the road is completed apart from the new section from Oron through Odukpani to Calabar which is yet to be flagged off”. http://www.dailytrust.com.ng/sunday/index.php/investigation/20950-east-west-road-gulped-n726bn-under-jonathan |
This is exactly what is needed right now. This is in line with PMB's policy to diversify the economy as contained in his inaugural speech. This period will be a perfect opportunity to sensitize Nigerians on the futility of depending on oil as the sole mainstay of our economy, and encourage entrepreneurs in the agricultural and solid mineral sectors of our economy. |
It has started... He who sows the wind, should be ready to reap the whirlwind. Sahara Reporters must be commended for their excellent and patriotic investigative journalism. mikeansy:www.nairaland.com/attachments/2270990_buharicertificate_jpege720df1984146fe9326da77d40659c28 |
I'm Fulani, but I would love to be Efik (Calabar) for a day because of their beautiful culture, beautiful people and fun attitude towards life. Just for a day though. I love my fula mojo. |
The Presidency is clearly upset with Saraki, it's not surprising he has adopted a reconciliatory tone lately. His treachery will soon be treated by the same PDP he initially abandoned and is now romancing at the cost of his current party. His ultimate plan is to sieze the fairly revived PDP with Atiku and Yerima et al., and I believe the PDP is smart enough to know that. As far as he does not cross the path of President Buhari or stand in the way of his reforms, he can keep fooling himself for now. |
Whynotthetruth:I don't even live in the country so shove your wishful thinking where the sun don't shine. I am only a patriotic Nigerian that is defending reason amidst propaganda from butthurt supporters of the past failed administration. Keep numbering your posts like you're making sense, as I stated earlier, you've lost the plot. Cheers. |
mckenzzy:Obviously his flights home will be more frequent than anywhere else. |
Whynotthetruth:You've lost the plot ![]()
|
Whynotthetruth:1. The soil is what makes a desert. The desert soil is sandy. Daura's soil is sandy. Brownouts will certainly occur. 2. The lack of a proper foundation is what cost GEJ his Presidency. Only a fool does the same thing twice and expects a different result. 3. It is senseless to accrue the additional cost of driving to Daura when you can land in Daura straight from the Villa, when you are on a cost-cutting drive. You obviously lack the capacity to present your own argument. |
Successobed:Don't go far. Your former Senate President David Mark had a customized helipad installed on his roof. He was exposed by the NUJ President.
|
Whynotthetruth:Lol I see you just want to troll, I'll leave you with this. In aviation, a brownout (or brown-out) is an in-flight visibility restriction due to dust or sand in the air.[1] In a brownout, the pilot cannot see nearby objects which provide the outside visual references necessary to control the aircraft near the ground.[2] This can cause spatial disorientation and loss of situational awareness leading to an accident.[3] Pilots have compared landing during brownouts to parallel parking an automobile with one's eyes closed.[4] The brownout phenomenon causes accidents during helicopter landing and take-off operations in arid desert terrain. Intense, blinding dust clouds stirred up by the helicopter rotor downwash during near-ground flight causes significant flight safety risks from aircraft and ground obstacle collisions, and dynamic rollover due to sloped and uneven terrain.[5] Brownouts have claimed more helicopters in recent military operations than all other threats combined.[6] There are several factors which affect the probability and severity of brownout:[6] rotor disk loading rotor configuration soil composition wind approach speed and angle https://en.wikipedia.org/wiki/Brownout_(aeronautics)
|
taharqa:You are a bigger fool for for not coming up with a point before spamming my mentions. |
OrlandoOwoh:Helicopters with tyres also land on helipads, or you assumed they taxi to take off and land? The tyres are usually for taxying from the helipad to the hangar where it is kept. https://www.benbarden.co.uk/images/uploads/_MG_5244bg.jpg |
Whynotthetruth:You have no point. That picture was of GEJ landing in Otueke from Port-Harcourt, you have not disproved that claim. Secondly, it is profoundly ignorant to suggest a chopper can land in any open field or space without consideration of the terrain. Google brownouts. Finally, he is cutting the cost of fuelling the Presidential Jumbo Jet to Katsina, before proceeding with his convoy to Daura among other costs, since he can fly directly from the villa. You have no points whatsoever, you sound like a drowning man grasping on straws to stay afloat. |
neocortex:A Jet would no longer be needed as the President would be able to take off from the Villa and land directly in Daura. I have tackled the issue of maintenance severally. The link you posted was for an upgrade, stop being mischevious. If you understood the article it would be clear they were referring to the overall maintenance cost of the hospital. All you really need is a mop, a broom and some replacement lightbulbs.
|
obayaya:Thats not true, I challenge you to provide proof if you know what you're saying. |
1 2 3 4 5 6 7 8 ... 22 23 24 25 26 27 28 29 30 (of 79 pages)
...
