₦airaland Forum

Welcome, Guest: RegisterLoginWith GoogleTrendingRecentNew

Stats: 3,326,513 members, 8,426,890 topics. Date: Monday, 15 June 2026 at 06:23 AM

Toggle theme

QSFemi's Posts

Nairaland ForumQSFemi's ProfileQSFemi's Posts

1 2 3 4 5 6 7 8 ... 15 16 17 18 19 20 21 22 23 (of 23 pages)

PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 8:08pm On Jul 11, 2020
Thanks ma'am for the recommendation.

I'm grateful.

God bless you.



Enyinne:
I guess the number was removed . Zero eight one six three 6461 five five. Thats it .Call him Femi
PropertiesRe: Services We Offer As Quantity Surveyors At CHOICE COST CONSULT by QSFemi(op): 7:56pm On Jul 11, 2020
We're still looking forward to meeting our next client.

QSFemi:
Contact CHOICE COST CONSULT for for quantity surveying services, viz-a-viz

1) Bill of Quantities (Projected estimated cost of construction)
2) Materials and Labour Schedule (breakdown of cost of materials and labour respectively for your construction projects)
3) Valuation of ongoing construction works (know the cost of already existing or ongoing construction)
4) Bidding and Tendering for construction jobs (As a contractor bidding for jobs, you need competitive tender to win the job. Nobody can help you out except a quantity surveyor.
5) Pricing of blank/unpriced bill of quantities for tendering purposes.
6) Invitation, pre-qualification and selection of contractor based on suitable tendering procedure. Don't award your jobs to the least bidder bit the least responsive bidder. Be smart. Don't let contractors fool you.
7) Contract administration from inception to completion of your projects. (interpretation of conditions of contract is one of the duties of a smart quantity surveyor)
cool Preparation of both feasibility and viability studies (if you're engaging in a commercial construction works, know the payback period and rate of investment of your projects. Nobody does it better than a quantity surveyor.
9) Life cycle costing
10) Cost control
11) Cash flow forecasting
Etc

Contact us today.
Mobile no: 09012800750
PropertiesRe: Services We Offer As Quantity Surveyors At CHOICE COST CONSULT by QSFemi(op): 8:08pm On Jun 18, 2020
We're still offering quantity surveyor's services.

QSFemi:
Contact CHOICE COST CONSULT for for quantity surveying services, viz-a-viz

1) Bill of Quantities (Projected estimated cost of construction)
2) Materials and Labour Schedule (breakdown of cost of materials and labour respectively for your construction projects)
3) Valuation of ongoing construction works (know the cost of already existing or ongoing construction)
4) Bidding and Tendering for construction jobs (As a contractor bidding for jobs, you need competitive tender to win the job. Nobody can help you out except a quantity surveyor.
5) Pricing of blank/unpriced bill of quantities for tendering purposes.
6) Invitation, pre-qualification and selection of contractor based on suitable tendering procedure. Don't award your jobs to the least bidder bit the least responsive bidder. Be smart. Don't let contractors fool you.
7) Contract administration from inception to completion of your projects. (interpretation of conditions of contract is one of the duties of a smart quantity surveyor)
cool Preparation of both feasibility and viability studies (if you're engaging in a commercial construction works, know the payback period and rate of investment of your projects. Nobody does it better than a quantity surveyor.
9) Life cycle costing
10) Cost control
11) Cash flow forecasting
Etc

Contact us today.
Mobile no: 09012800750
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 8:20pm On Jun 06, 2020
+234 805 790 4534

metrecube:
That will be better. Thanks.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 10:30am On Jun 06, 2020
If you need their contact, I will give you.

metrecube:
Thanks Femi.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 5:25pm On Jun 05, 2020
What question did you think I responded to?


raymondFirstborn:
You can't build a 6bedroom duplex for 20m not to talk of 15m.

you also can not build a 5bedroom duplex with flats attached for the aboved sum.

Take note.

Some clients take figures from NL and use as bench mark when pricing quotes submitted by contractors. So please it's important we analyse and digest questions before typing .
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 2:42pm On Jun 04, 2020
I attended to the duplex.

royalfly:
For the single duplex or the deuplex with an attached flats
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 9:03am On Jun 04, 2020
Budget 15m to 20m.


royalfly:
Location is Benin city, every other information concerning roofing and tiles should be of moderate value. Pop should be used in the living rooms but the rooms could be pvc. The inner walls of the house should be scriding

Thanks
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 10:27pm On Jun 03, 2020
There's a company called NIGERITE in Ikeja, part of their products is Clay roofing Tiles. You can also get installer from the company also. You can reach out to them.

metrecube:
I have a small roof work to be done around Ajah. Is there anyone that can supply and install this clay roof tile? Contact me on 07031286626.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 10:23pm On Jun 03, 2020
The answer you seek depends on a number of factors in order to get an approximate estimate of the construction cost. Chief among them is location of the project, types of finishes (ranging from types of tiling, roofing, painting, screeding, POP ceiling finishes, electrical installation to plumbing installations etc), nature of the soil and its bearing capacity and many other reasons.

In order to get an approximate estimate for the proposed building, I will advise you to provide some of the aforementioned details.

Regards.

royalfly:
Good evening house, please I want to know how much much it will cost to build a spacious 6 bedroom duplex from start to finish. Or a good 5 bedroom duplex in front and a 3 bedroom flat up and down attached to the back. Thanks
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 1:57pm On Jun 01, 2020
The building dimensions aren't showing clearly.

chimexdnice1:
Hello Builders in the house, please how much is appropriate (for workmanship only) to complete the upper floor block work for this project. Its a 4 bedroom duplex with two 2 bedroom flats behind. In a standard half plot. my builder is billing me 600k for that stage of work. His main reason is that it is "up work". please what do you guys think? Your response is appreciated. Thanks.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 1:52pm On Jun 01, 2020
The total area of tiles you need is 15m2 (square metres) including skirting.

Now, assuming you're using 400mm x 400mm ceramic floor tiles, the total cartons of tiles needed equals;

15 / 1.92 = ~ 8 cartons.

NB: For 400mm x 400mm ceramic floor tiles, there are 12 pieces of tiles in a carton.

Shezkid01:
Hello
Please how many tiles can I used for a room of 9 abestors
And how much is a pack of tiles
Someone should quote me with the answer ASAP
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 9:28pm On May 28, 2020
Jeff68:
You have really answered my questions, with paragraphs 2& 3!! That gives me a good place to begin. Thanks!!

I'm glad you find it helpful.

quote author=QSFemi post=90065165]

What's the length and breadth of the building if you assumed it to be rectangular in shape?
Knowing the dimensions of the building will help in verifying the quantities for the measured area.

Secondly, ask Tiles sellers to send you cost/m2 of different types of tiles in order to know the current market price of tiles.

On Labour, cost of laying tiles per square metres is usually between #250 to #500 per square metres depending on the skills of the tiler, experience and your negotiation skill.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 9:03pm On May 28, 2020
Jeff68:
Hello house, and the professionals in the house, pls. I need guidance on tiles and tiling, also, if you can give me a reasonable quote that beats my tiler ,(I won't tell you what his charges are in other not to influence your charge) I will be open to talking with you. Attached are the measurements for my project obtained from the tiler, can you please review and give me your opinion. thanks
What's the length and breadth of the building if you assumed it to be rectangular in shape?
Knowing the dimensions of the building will help in verifying the quantities for the measured area.

Secondly, ask Tiles sellers to send you cost/m2 of different types of tiles in order to know the current market price of tiles.

On Labour, cost of laying tiles per square metres is usually between #250 to #500 per square metres depending on the skills of the tiler, experience and your negotiation skill.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 8:05pm On May 25, 2020
As a professional that's conversant with the cost of materials and labour in Benin City, Edo State, I will advise you budget 25m to 35m.


4newguy:
Good day. Asking for a close relative

How much would it cost to build a 4unit 3 bedroom (1 storey) flat.
Basically an average looking house

Location: Either Asaba or Benin (I'm try to convince him to build in Benin City as it might be cheaper for him than delta)
Your input will be highly appreciated
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 11:27pm On May 24, 2020
Location?

Chekitaut:
From Monday 24th 2020. Granite is N2,800/ton transportation cost excluded.

Transport Call.

Thank you.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 11:22pm On May 24, 2020
What's the name of the brand?
Secondly, what's the coverage rate (per square metres)?

globtex:



For your Topnotch quality and affordable paints.
Let discuss

We Produce, Apply & Supply Quality Paints For All Your Building Project.


Request for sample on your site today.

WhatsApp or call http:///2347012927305
PropertiesRe: How Much Does It Cost To Build A House With Atleast 4 Rooms by QSFemi(m): 7:46pm On May 23, 2020
I do not know why your doubt the integrity of your quantity surveyor in delivering a professional bill of quantity for you.

However, if you want to get the details of the bill in everyday language, have the quantity surveyor prepare a schedule of materials and labour for you for the project.

There, you can get a detailed breakdown of individual cost of materials and labour for every item in the building.


Saneesk:
4 rooms,2 parlours a kitchen and 4 toilets surveyor how much will it cost please help i think my quantity surveyor might scam me that's why I'm asking and i want it to be a duplex
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 9:20pm On May 16, 2020
I get that now.

If you're using roof slab (decking), please bear in mind that the decking will need to be felted with bituminous felting for waterproofing which is additional cost.



Mgbadike80:
the house is not under construction, i have the land and is saving up the money but i already have an idea of what i want to build, it's just that i noticed online that the hostel can be decked and waterproofed to act as a rooftop garden, relaxation spot etc, i would also keep the overhead water tank there thereby saving me from the cost and inconvenience of building an overhead water tank stand. so I'm just asking for ideas.
PropertiesRe: Services We Offer As Quantity Surveyors At CHOICE COST CONSULT by QSFemi(op): 7:02pm On May 16, 2020
QSFemi:
Contact CHOICE COST CONSULT for for quantity surveying services, viz-a-viz

1) Bill of Quantities (Projected estimated cost of construction)
2) Materials and Labour Schedule (breakdown of cost of materials and labour respectively for your construction projects)
3) Valuation of ongoing construction works (know the cost of already existing or ongoing construction)
4) Bidding and Tendering for construction jobs (As a contractor bidding for jobs, you need competitive tender to win the job. Nobody can help you out except a quantity surveyor.
5) Pricing of blank/unpriced bill of quantities for tendering purposes.
6) Invitation, pre-qualification and selection of contractor based on suitable tendering procedure. Don't award your jobs to the least bidder bit the least responsive bidder. Be smart. Don't let contractors fool you.
7) Contract administration from inception to completion of your projects. (interpretation of conditions of contract is one of the duties of a smart quantity surveyor)
cool Preparation of both feasibility and viability studies (if you're engaging in a commercial construction works, know the payback period and rate of investment of your projects. Nobody does it better than a quantity surveyor.
9) Life cycle costing
10) Cost control
11) Cash flow forecasting
Etc

Contact us today.
Mobile no: 09012800750
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 6:45pm On May 16, 2020
I'm trying to imagine the context here.

When you say you're contemplating between making a choice of decking or roofing a 2 storey building, do you mean the building has no original plan of action?

What do I mean? If the building is originally designed to be a 2 storey building, then the logical thing to do is to roof it right away and not deck it because the foundation must have been designed for 2 storey building. Putting a decking and subsequently thinking of adding another floor would be a suicide mission.

On the contrary, if the building is originally designed to be a 3 storey building, then I can say confidently that your choices are valid. In that case, decking is more expensive to construct than normal roofing other things being equal.

Mgbadike80:
please, between roofing a two story student hostel with longspan aluminum roofing sheets and decking it, which would be more costly? would the difference in cost be much? thanks.
CareerRe: Thread For Quantity Surveyors, Construction Economist, Cost Expert, Com. Manager by QSFemi(m): 10:29pm On May 06, 2020
Wow. I belong to the group chat too.

Let me check for you there now.

I've checked for you but don't the name you used.

Estheryyy2020:
Hi Femi,
Yes I'm in the young Quantity surveyors' WhatsApp group for lagos (YQSF 1)
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 8:38pm On May 06, 2020
If you want any help, you should provide the length and breadth of the building. Also, you can give an idea on the height of the kingpost or slope of the roof if you know it. Better still, you can just upload the floor plan drawing.

rbox:
Here is the contination
CareerRe: Thread For Quantity Surveyors, Construction Economist, Cost Expert, Com. Manager by QSFemi(m): 8:01pm On May 02, 2020
I'm pleased to meet you Esther.
My name is Femi working for a government agency.

Are you in Young Quantity Surveyors' whatsapp group for Lagos?


Estheryyy2020:
Hi everyone I'm Esther, I'm a Quantity surveyor currently working as a contracting Quantity surveyor with Cappa and D'Alberto.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 7:56pm On May 02, 2020
Here are my thoughts.

If you're the project owner and you hired a contractor to execute the job on your behalf, then the contractor should be responsible for the cost of treatment.

If, however, you're the project owner and engaging the technique of direct labour whereby you just hired both skilled and unskilled labour by yourself to execute the job on the site, then I'll advise that the costs of treatment should be borne by you because you might not provide your workers with suitable personal protective equipment while working.


dbshaywhy:
Good morning professionals, please if workers at one site fall off bricks and got slump but recovered at medical intervention... Please who is to be responsible for the the medical bills or how should it be sorted out?
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 7:49pm On May 02, 2020
I took my time to go through the quotation.

There are some issues that should worry you about the structural integrity of the building beyond the cost.

Without iota of doubt, this big project is being supervised an artisan, probably a bricklayer, who has had considerable experience in the business but still inadequate given the technicalities of structural engineering.

I will advise that you hire a competent structural engineer to take up the project from here so as to avoid stories that touch the heart.

As a quantity surveyor, I've done some projects in Benin city and the cost of the materials in the quotation are fair, although I've no basis to comment on the quantities since you do not provide your drawings.

For those people raising an issue of separating cost of buying granite and transportation to site, I want to say that person that prepared the quotation was right. This is because the cost of buying 30-tonne granite in Benin city is about 180,000 to 200,000 depending on the haulage distance.




LeftieJay:
Please I need advice, I have a project going on. It’s 24 room self contain. 12 rooms down and it will have 12 rooms up. Please I want to know the cost of decking. I’m not living in Nigeria and the estimate that was sent to me is making me doubt. I also have to floor the ground too. I will post the estimate here. Please somebody should help me out. The project is in edo state. The estimate is saying almost 3.3m
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 9:47am On Apr 30, 2020
Based on the cost information you provided, here's my cost analysis;

1) Casting of concrete with a concrete mixer using a 5/3.5 concrete mixer continuously with output of 1.20m3 per hour for normal 8 working hours per day.

Cost of labour for mixing, placing and compacting = #89,375.00

Now, you will add cost of hiring the concrete mixer for that day, cost of transporting the concrete mixer to and from site. Cost of fueling for that day. The answer you get gives you the cost of casting your concrete of 44 cubic metres, earlier calculated, for slab and staircase.

The last thing to consider is the Engineer's supervision fee. I believe you already have an idea of that. So, just add that to our previous sum, whatever you get is the total cost of casting.

Thanks.


omanzo02:
In the area where mine site is they pay:
Mixer #4000
Bricklayer #5000
Helpers/unskilled #3500
Depending on the height, though I paid less when I was making the groundfloor.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 9:40pm On Apr 28, 2020
You should provide more information like;
1) dimensions of the building, that is, the length and breadth
2) Type of roofing sheet you want to use (e.g Zinc, long span aluminum, metcopo, stone coated, step tiles etc)
3) Height of the Kingpost or slope of the roof.

Lastly, where's the project located?


Adequate459:
Dear professionals,
Happy to be on this thread,infact I'm impressed on how questions are attended to.
God bless you.
Plz, What is the cost of roofing a 3 bedroom flat with 1 mini flat.
Please note:roofing as in carpentry work and affordable roofing sheet

Thank you
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 8:17pm On Apr 28, 2020
I need to know the amount paid to workers on site per day around that area your site is located.

1) Skilled labour (e.g Carpenter, Bricklayer, Iron bender
2) Unskilled labour (e.g people that assist bricklayer, dig foundation on site etc)

For instance, in one of my sites in Lagos, if I'm to pay at daily rate, I pay skilled worker #3500 to #4000 per day while unskilled worker gets #1500 to #2000 per day.

Tell me what's obtainable around your area so that I can get a fair estimate for labour over there.

omanzo02:
Delta state
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 3:11pm On Apr 28, 2020
Where is the location of the project?



omanzo02:
Thanks for your insight,..... For labour, The carpenter, electrician and Builder are charging 98000, 49000 and 205000 respectively, the Iron man is yet to give labour cost. I also wonder the extent the lockdown will affect prices of building materials especially woods.
PropertiesRe: General Topic Thread-To Discuss Anything And Everything in Building Construction by QSFemi(m): 9:24pm On Apr 27, 2020
From the dimensions provided;

Volume of concrete for your suspended slab is 44 m3. (Plus staircase concrete volume if you've only 1 staircase)

Quantity of materials needed if you're using
1:2:4 concrete mix
50kg bag of Cement = 264 bags
Sand 35 tonnes (You can buy 2 trips of 20 tonnes truck)
Granite 60 tonnes (2 trips of 30 tonnes truck)

If you need estimate for labour, mention me in your reply.

omanzo02:
Hello house,

Decking: How many tonnes of granite with be enough.
Length: 24600mm
Width: 11890mm
Beams: 34 (250h concrete beams)
Slab thickness: 150mm


Thanks.

Modified.

1 2 3 4 5 6 7 8 ... 15 16 17 18 19 20 21 22 23 (of 23 pages)