Wanaj0's Posts
Nairaland Forum › Wanaj0's Profile › Wanaj0's Posts
1 2 3 4 5 6 7 8 ... 24 25 26 27 28 29 30 31 32 (of 67 pages)
Laminate is GOOD but watch out for the thickness and hardness. I will not go for anything less than 8mm. AC3 upwards is good. Will only use it where you don't have heavy traffic. Sand will cause scratching. Moving of furniture on it will also cause scratching. Apart from that, it is cool. Not sure it is cheaper though when compared with tiles. Note, laminate does not like water. So don't use in areas that will be exposed to water for prolong periods. |
No update ? |
You need to put the cost for Casement/Sliding and also the specs. Be ready to also compete with the Chinese. All the best. |
Any picture ![]() |
nextstep:Manufactured Interesting |
NOSPETCO here we come ![]() |
brabus:Now I understand your way of thinking. I hope other builders are not like you. All the best. |
gabbytabby:Good way to go. However once the CONTRACTOR agree to do the job at an agreed price to the required specification, he cannot claim that he did a poor job because the money was small. He was not forced to agree to do the job. |
brabus:You are comparing apples with oranges. A client (Lekki Gardens) contracted you (A Contractor) to build 2 units of detached duplex for him (Lekki Gardens). The client (Lekki Gardens) now have Consultants to SUPERVISE the work that you are doing to ensure that the CONTRACTOR builds according to specification. If the client (Lekki Gardens) is selling the house to a subscriber, you can see that the subscriber is not involved. It is purely Client vs Contractor relationship. That also governs the roles, responsibilities and liabilities The underlying principle has nothing to do with type, location or complexity of job. It is all about contractual relationships. |
brabus:The CONTRACTOR and the MD of Lekki Gardens are already in court. If anything, they will have case to answer with respect to gross negligence and professional misconduct. |
allCopacetic:Kindly show the range of Schneider products that you stock. I am interested in the Neo Range if available. |
TLAX:Nothing wrong with blocking drainage during construction work? Na wa ooooooooo. Why BLOCK the drainage throughout the duration of the construction work only to clear it AFTER construction is completed? Why not build the RAMP NOW to create access to the plot? What is the effect of a blocked drainage? YES, many people block drainages during construction work BUT it is WRONG. That Brabus does not know that it is WRONG says a lot about his professionalism! |
Brabus, you have a penchant of JUSTIFYING and RATIONALISING ALL your actions! It was pointed out that you blocked the drainage. Initially, you denied it. Now you are traying to rationalise why you are RIGHT to have blocked the drainage! How many more WRONG things will you do and still try to rationalise and justify? No one is perfect. We all do make mistakes. We do make wrong choices. The difference is accepting and making ammends. All the BEST. |
brabus:You have blocked the drainage. Quite unprofessional. There are other sensible ways of creating access without using sand to block the drainage system. Nothing to be proud off. |
While indeed there was robbery at around 6.05 and 6.10am there was no gun shot and no one was killed or injured! It was more of hoodlums taking advantage of the traffic to rob innocent motorists. Let us be FACTUAL in our reporting. |
How much per sqm for AC3 12mm thick? |
You did not include the prices. Do you also stock Schneider switches and sockets especially the NEO series. |
London Cool, 9" blocks at N220 is a No No. That to me is a RED FLAG. |
It is obvious people do many things they are not professionally competent to do in Nigeria. While client gives a brief, the correctness of the design lies with the professional that puts his seal on the design. Part of the problem in Nigeria is that peopke just regurgitate designs that they dont understand. Once asked for the structural calculations for a building and there was none. Calculations for sizings of ACs not provided. Calculations supporting the height of the water tank not available. So you ask, what is the basis of the decision? Foundation design done without a soil test! What calculations were done for the plumbing works? Was there any electrical load calculation? Designs in Nigeria is copy and paste. No attention to detail. A colleague from UK did the mechanical design (just a sketch) for a building and peopke were amazed! We need to be professional or else quacks with presentation skills will take over the industry! Someone talked about the strength of a block and use throwing it from a 4m height as an example. That already shows that the person does not know the concept of STRENGTH. Do we even do random tests of the blocks? Do we test the concrete we use? |
AC3 or AC4? How much per square metre? |
KolaShangOne:The cost savings will come if the building has long span. Otherwise, there is hardly any cost savings. I know a building that the deck was done in a similar way (used blocks instead of clay pots). |
EgunMogaji:Theory is different from practice. The legal framework is just not there. Difficult to get justice via the Nigeria legal system. Almost impossible to enforce contracts. Do you know any other part of the world where workers go unpaid for 8months? Any part of the world were workers go on strike for 6months? Those are the reality on ground. In Nigeria, agreements are hardly worth the paper they are written on. |
gabbytabby:It is the issue. When hospital attendant become a consultant overnight, there is a problem. People are being asked to do job above their competencies. The outcome is what you see here. A professional will be guided by the ethics of his profession. A quack has nothing to fear. A professional can have his license revoke. A quack has nothing to lose. Nexthome and others with passion for building should have competent and certified professionals in their team. |
I don't think Johnny is the only one at fault here. The client also at fault and I hope that others will learn from this. How many here will allow a nurse to carry out an operation on your child? Brabus, Johnny and most of the builders dont have the requisite training, competency and experience to do the kind of jobs given to them to do. When you have failure of a structure, you look for the structural engineer. Was there a structural drawing for this building? Was the drawing followed by Johnny? Was there any structural engineer that confirmed that the work was done as per the design? I know that Nigeria is a country where an hospital attendant will claim to know more than a consultant in a teaching hospital. The value of the consultant is known when things go wrong. For the builders who may not have the necessary certification and competency, get the required professionals to work with you. Once the building is not a bungalow, get a structural engineer. Even for your electrical works, get a certified/registered electrical contractor. Someone that have the tools and instrument to detect faults! For clients, stop patronising QUACKS all in the name of saving money. Not asking people to waste money BUTensure that works are propely designed and the design followed to the letter. Johnny has built a bungalow before and that's where it should stop. Brabus is an IT person so surprised at how he became a building professional overnight. He needs reall building professionals to work with him. We all need to understand our limitations and not present ourselves for who we are not. In civilised countries, many here will be behind bars for impersonation! |
Titles/names are used loosely on Nairaland. Johny is definitely not an engineer. Same with Brabus. When I hear of collapse structures, I always wonder who the structural engineer is. That is enough to cause him ti lose his license. As per diverting money etc, it is partly because people are not trustworthy and partly because some cannot resist temptation. When you pass like N15m through someone, dont be surprised when such people start to get ideas. integrity and respect for contract is holding us down as a nation. |
You did not include your prices. |
topsy23:Thanks. Let me know what you find out. |
topsy23:This is what I was looking for. |
Thanks. Saw that you used it in one of your projects. |
Any idea of the cost of the Schneider Neo Series switches and sockets? Do you know where one can get them to buy? |
Is this land still avaliable? |
Where is the location? Which local goverment? CofO? Hmmmmm |
1 2 3 4 5 6 7 8 ... 24 25 26 27 28 29 30 31 32 (of 67 pages)
?

.